ReraGenieLog inGet a buyer report

Home / Browse projects / Surat, Gujarat / Stalwart Insignia

Valid until 1 Apr 2027 Commercial project

Stalwart Insignia

By Stalwart Realties

RG-GJ-86186 · RERA PR/GJ/SURAT/SURAT CITY/Surat Municipal Corporation/CN112AA10012/120722 · Last updated on GujRERA portal: 30 Mar 2024

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Apr 2027Possession promisedno revision filed
5 of 9Construction stages donefurthest along: Stilt Floor, 83%
56 of 132Units unsoldnot recorded sold or booked
Jump to the 39 documents Report an error

Stalwart Insignia is a Commercial project by Stalwart Realties in Surat, Gujarat, registered with GujRERA as PR/GJ/SURAT/SURAT CITY/Surat Municipal Corporation/CN112AA10012/120722 on 12 Jul 2022. Possession is promised by 1 Apr 2027. 76 of the 132 units on this registration are recorded sold or booked, and 5 of 9 construction stages are filed complete.

At a glance

Project

  • NameStalwart Insignia
  • TypeCommercial
  • Location
    • FP 38/1
    • besides Shantiniketan
    • Opp. Jolly Party Plot
    • Airport - University Road
    • Vesu
    • Vesu
    • Surat City
    • Surat
    • 395007
  • Pincode395007
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/SURAT/SURAT CITY/Surat Municipal Corporation/CN112AA10012/120722
  • ReraGenie IDRG-GJ-86186

Builder

  • NameStalwart Realties
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredJul 2022PromisedApr 2027

Key facts

Registration and timeline

  • StatusValid until 1 Apr 2027
  • Registered on12 Jul 2022
  • Promised completion1 Apr 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed39 files

Current status

58%76 of 132 units booked
56.2%Of the estimated cost spent so far

Figures as on 30 Mar 2024, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Stalwart Insignia---0132132

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building1

As on 30 Mar 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 9 construction stages are filed complete. The stage furthest along is Stilt Floor, at 83%.

Stalwart Insignia: 86% average across the applicable activities

ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor83%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats83%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing25%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing83%

Progress on shared amenities23

As on 30 Mar 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes50%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes100%
Landscaping and tree plantingYes30%
Street lightingYes30%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes0%
Energy managementYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Fire fightingYes0%
Drinking water facilitiesNoNot applicable
Emergency evacuationYes0%
Use of renewable energyYes0%
SecurityYes0%
Letter boxYes0%
Compound wallYes100%
Plinth protectionYes50%
Water tankYes100%
Other requirementsNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,802 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 35.70 cr
Cost incurredRs 20.05 cr
Spent of the estimate56.16%
BuildingWingEstimatedIncurred
Stalwart InsigniaNARs 35.70 crRs 20.05 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJIGAR DIPESHKUMAR DALAL
EngineerDHARAM RAMESHCHANDRA BHAGAT

Documents filed39

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/SURAT/SURAT CITY/Surat Municipal Corporation/CN112AA10012/120722 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer's certificate (Form 2)30 Mar 2024
Engineer's certificate annexure30 Mar 2024
RERA registration certificate12 Jul 2022
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Drainage affidavit-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Approved sanctioned plan-
Approved layout plan-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Declaration in Form B-
Approved building or plotting plan-
NOCs from authorities-
Title clearance certificate-
Title report-
Property card-
Proforma sale deed-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Surat

58%of this project is bookeddistrict median 39%
15%of Surat projects moved their completion datethis one has not

Computed across the 2,600+ Surat projects on ReraGenie, from their own filings.

Keep Stalwart Insignia on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Vesu2,600+ in Surat

2 kmStalwart InsigniaOther 183Dot size: filed unitsN

Filed coordinates, straight-line distance. 183 registered projects within 2 km.

Builder: Stalwart Realties

Stalwart Realties has 1 registration on GujRERA, including Stalwart Insignia. Read the full track record. See more projects on the Surat district page.

Frequently asked questions

What are my rights if Stalwart Insignia is delayed beyond 1 Apr 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of Stalwart Insignia?

The registered promoter entity is Stalwart Realties, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in Stalwart Insignia?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Stalwart Insignia?

The professionals named in the filing: Architect: JIGAR DIPESHKUMAR DALAL; Engineer: DHARAM RAMESHCHANDRA BHAGAT. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Stalwart Insignia?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Stalwart Insignia. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Stalwart Insignia to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.