ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / Sobha Royal Crest

Registration approved Residential/Group Housing project

Sobha Royal Crest

By SOBHA LIMITED

RG-KA-19179 · RERA PRM/KA/RERA/1251/309/PR/300522/004936

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Jump to the 8 documents Report an error

Sobha Royal Crest is a Residential/Group Housing project by SOBHA LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/300522/004936 on 30 May 2022. Possession is promised by 31 Dec 2028.

At a glance

Project

  • NameSobha Royal Crest
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
    • 560085
  • Pincode560085
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/309/PR/300522/004936
  • ReraGenie IDRG-KA-19179

Builder

  • NameSOBHA LIMITED
  • Entity typeCompany
  • CINL45201KA1995PLC018475
  • GSTIN29AABCS7723E1ZB
  • Authorized SignatoryMr. Suresh Ganiga
  • Managing DirectorMr Jagadish Nangineni
  • DirectorsMr Jagadish Nangineni, Ravi P N C Menon, T P Seetharam
  • Project HeadMr.Yatheesha
  • Other registrations119 more →
  • No longer live8 withdrawn or revoked
  • Declared earlier projects196 →

Key dates

this monthRegisteredMay 2022PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on30 May 2022
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings3 building records
  • Documents filed8 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing 1---1100110
Wing 2---1090109
Wing 3---1100110

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesYes-
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership13

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area25,619 sq m
Named landowners13
LandownerVillageDistrict
D.K. Suresh--
D.K. Suresh--
D.K. Suresh--
D.K. Suresh--
D.K. Suresh--
D.K. Suresh--
D.K. Suresh--
D.K. Suresh--
D.K. Suresh--
D.K. Suresh--
D.K. Suresh--
D.K. Suresh--
D.K. Suresh--

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVinita Agast
EngineerMr. Durga Prasad KVR
Chartered AccountantBalaji D

Documents filed8

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/300522/004936 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Registration CertificateFile: Registration Certificate of SL.pdf-
Organization StructureFile: Organisation Structure.pdf-
Certificate issued by CA Form 1File: Sobha Royal Crest CA Certificate.pdf-
Certificate issued by Architect Form 2File: Architect Certificate PR SRC.PDF-
Certificate issued by Engineer Form 3File: Sobha Royal Crest Engineer Certificate.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-

Promoter's earlier projects40

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

31 not delivered by the promised date12 under way, not due yet38 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
Sobha Manhattan Towers - Town Park Phase 2, Wing 1 and 2 LitigationPhase 1 at Sy.No.48/1A and 48/2, in the composite project Sobha Manhattan Towers - Town Park situated at Sy.Nos.48/1A, 48/2, 50/2 and 50/3, presently bearing Khata No.1877/48/1A-1881/50/2-1886/48/2-1913/50/3, situated at Yadavanahalli Village, Attibele Hobli, Anekal TalukOngoingSep 2028Not due yet
Sobha Brooklyn Towers - Town Park Phase 5, W3 LitigationSy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, KarnatakaOngoingJun 2028Not due yet
Sobha Windsor Phase 4 Wing 9, 10 and 11 LitigationSy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram HobliOngoingMar 2028Not due yet
Sobha Victoria park phase 2 LitigationPROPOSED RESIDENTIAL DEVELOPMENT PROJECT AT SY.NO.47/1B,47/2B, KYALASANAHALLI VILLAGE , WARD NO.25, MAHADEVAPURA ZONE, K.R. PURAM HOBLI, BANGALOREOngoingDec 2027Not due yet
Sobha Victoria park phase 1 LitigationPROPOSED RESIDENTIAL DEVELOPMENT PROJECT AT SY.NO.47/1B,47/2B, KYALASANAHALLI VILLAGE , WARD NO.25, MAHADEVAPURA ZONE, K.R. PURAM HOBLI, BANGALOREOngoingDec 2027Not due yet
Sobha Sentosa Phase 4 Wing 1 and 2 LitigationPROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKAOngoingDec 2027Not due yet
Sobha Brooklyn Towers - Town Park Phase 2, W2Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, KarnatakaOngoingDec 2027Not due yet
Sobha Windsor Phase 3 Wing 6, 7 and 8 LitigationSy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram HobliOngoingSep 2027Not due yet
Sobha City AthenaProperty No 2091/40/7/1, 9/1, 9/2, 62/2, 62/3/1, Chokkanahalli Village, Ward No. 5, Jakkuru, Yelahanka Zone, BengaluruOngoingSep 2027Not due yet
Sobha Sentosa Phase 3 Wing 3 and 4 LitigationPROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKAOngoingJun 2027Not due yet
Sobha Sentosa Phase 2 Wing 5 and 6 LitigationPROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKAOngoingDec 2026Not due yet
Sobha Manhattan Towers - Town Park Phase 1, Wing 4 and 5 LitigationPhase 1 at Sy.No.48/1A and 48/2, in the composite project Sobha Manhattan Towers - Town Park situated at Sy.Nos.48/1A, 48/2, 50/2 and 50/3, presently bearing Khata No.1877/48/1A-1881/50/2-1886/48/2-1913/50/3, situated at Yadavanahalli Village, Attibele Hobli, Anekal TalukOngoingDec 2026Not due yet
Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58 LitigationBalagere, BangaloreOngoingSep 2026Not delivered
Sobha Sentosa Phase 1 Wing 7 LitigationPROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKAOngoingJun 2026Not delivered
Sobha Royal Pavilion Phase 8 - Wing 15 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2026Not delivered
Sobha Royal Pavilion Phase 7 - Wing 12, 13 and 14 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2026Not delivered
Sobha Royal Pavilion Phase 6 - Wing 10 and 11 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2026Not delivered
Sobha Royal Pavilion Phase 5 - Wing 8 and 9 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2026Not delivered
Sobha Windsor Phase 2 Wing 3, 4 and 5 LitigationSy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram HobliOngoingApr 2026Not delivered
Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 and 24 LitigationBalagere, BangaloreOngoingMar 2026Not delivered
Sobha Dream Acres - Tropical Greens Phase 21 Wing 21 and 22 LitigationBalagere, BangaloreOngoingMar 2026Not delivered
Sobha Windsor Phase 1 Wing 1 and 2 LitigationSy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram HobliOngoingNov 2025Not delivered
Sobha Rajvilas LitigationSy. No 19/3, Minerva Mill Quarters, Gopalapura, Mysore Deviation roadOngoingMar 2025Not delivered
Sobha Dream Acres - Tropical Greens Phase 25 Wing 32, 33 and 34 LitigationBalagere, BangaloreOngoingMar 2025Not delivered
Sobha Dream Acres - Tropical Greens Phase 24 Wing 29 and 30 LitigationBalagere, BangaloreOngoingMar 2025Not delivered
Sobha Lake Gardens Phase 2Bharathi Nagar, Krishnarajapura, Seegehalli Village, K.R. Puram HobliOngoingDec 2024Not delivered
Sobha Dream Gardens Phase 2 - Wing 5, 6 and 7 LitigationSurvey No. 50, 51 & 54, Belahalli Village, Yelahanka HobliOngoingNov 2024Not delivered
Sobha Dream Gardens Phase 1 - Wing 8 and 9 LitigationSurvey No. 50, 51 & 54, Belahalli Village, Yelahanka HobliOngoingNov 2024Not delivered
Sobha Dream Acres - Tropical Greens Phase 26 Wing 35, 36, 37 and 38 LitigationBalagere, BangaloreOngoingSep 2024Not delivered
Sobha Dream Acres - Tropical Greens Phase 23 Wing 25, 26, 27 and 28 LitigationBalagere, BangaloreOngoingSep 2024Not delivered
Sobha Royal Pavilion Phase 4 - Wing 1, 2 and 3 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2024Not delivered
Sobha Royal Pavilion Phase 3 - Wing 16 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2024Not delivered
Sobha Royal Pavilion Phase 2 - Wing 4 and 5 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2024Not delivered
Sobha Royal Pavilion Phase 1 - Wing 6 and 7 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2024Not delivered
Sobha Lake Gardens Phase 1Bharathi Nagar, Krishnarajapura, Seegehalli Village, K.R. Puram HobliOngoingFeb 2024Not delivered
Sobha Forest Edge02/20/1/21/2 Hosahalli, Kengeri Sub Division, Ward No.198, BengaluruOngoingJun 2023Not delivered
Sobha HRC Pristine Phase 4 Block 4 and 5 LitigationSurvey No. 87/2, 87/3, 80 and 111, Jakkur Village, Yelahanka Hobli, BengaluruOngoingApr 2023Not delivered
Sobha HRC Pristine Phase 3 Block 3 LitigationSurvey No. 87/2, 87/3, 80 and 111, Jakkur Village, Yelahanka Hobli, BengaluruOngoingApr 2023Not delivered
Sobha HRC Pristine Phase 2 Block 2 LitigationSurvey No. 87/2, 87/3, 80 and 111, Jakkur Village, Yelahanka Hobli, BengaluruOngoingApr 2023Not delivered
Sobha HRC Pristine Phase 1 Block 1 LitigationSurvey No. 87/2, 87/3, 80 and 111, Jakkur Village, Yelahanka Hobli, BengaluruOngoingApr 2023Not delivered

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Sobha Royal Crest on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmSobha Royal CrestOther 14Dot size: filed unitsN

Filed coordinates, straight-line distance. 14 registered projects within 2 km.

Builder: SOBHA LIMITED

SOBHA LIMITED has 120 registrations on RERA Karnataka, including Sobha Oakshire Phase 1 Wing 1,2,7 and 8 and Sobha Oakshire Phase 2 Wing 3,4,9 and 10. Its filings declare 196 earlier projects, 85 of them declared completed. Litigation is declared on 33 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Sobha Royal Crest is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Sobha Royal Crest?

The registered promoter entity is SOBHA LIMITED, a company as per the filing. Its CIN L45201KA1995PLC018475 and GSTIN 29AABCS7723E1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Sobha Royal Crest?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Sobha Royal Crest?

The professionals named in the filing: Architect: Vinita Agast; Engineer: Mr. Durga Prasad KVR; Chartered Accountant: Balaji D. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sobha Royal Crest?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sobha Royal Crest. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sobha Royal Crest to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.