Home / Browse projects / Surat, Gujarat / SHUKAN RIVER

Valid until 30 Apr 2030 Residential/Group Housing project

SHUKAN RIVER

By SHREE99 INFRAVENUE LLP

RG-GJ-69355 · RERA PR/GJ/SURAT/SURAT CITY/SUDA/RAA12356/041023 · Last updated on GujRERA portal: 16 Feb 2026

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Apr 2030Possession promisedno revision filed
32 of 45Construction stages doneacross 5 buildings; furthest along: Staircases, 95%
195 of 308Units unsoldnot recorded sold or booked
Jump to the 45 documents Report an error

SHUKAN RIVER is a Residential/Group Housing project by SHREE99 INFRAVENUE LLP in Surat, Gujarat, registered with GujRERA as PR/GJ/SURAT/SURAT CITY/SUDA/RAA12356/041023 on 4 Oct 2023. Possession is promised by 30 Apr 2030. 113 of the 308 units on this registration are recorded sold or booked, and 32 of 45 construction stages are filed complete.

At a glance

Project

  • NameSHUKAN RIVER
  • TypeResidential/Group Housing
  • Location
    • BLOCK NO.1356
    • PAIKEE-1
    • TP NO.37
    • FP NO.83
    • O.P.NO.66
    • MOJE:VARIYAV
    • ADAJAN - PINCODE 394520
    • Surat City
    • Surat
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/SURAT/SURAT CITY/SUDA/RAA12356/041023
  • ReraGenie IDRG-GJ-69355

Builder

  • NameSHREE99 INFRAVENUE LLP
  • Entity typeLIMITED LIABILITY PARTNERSHIP FIRM

Key dates

this monthRegisteredOct 2023PromisedApr 2030

Key facts

Registration and timeline

  • StatusValid until 30 Apr 2030
  • Registered on4 Oct 2023
  • Promised completion30 Apr 2030
  • Revised completionNone
  • Buildings5 building records
  • Documents filed45 files

Current status

37%113 of 308 units booked
73.6%Of the estimated cost spent so far

Figures as on 16 Feb 2026, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B---56056
A---56056
D+E---56056
C---56056
F+G+H---84084

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building5

As on 16 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

32 of 45 construction stages are filed complete across 5 buildings. The stage furthest along is Staircases, at 95%.

B99%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing90%
A84%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats80%
Sanitary fittings within the flats75%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing90%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing10%
D+E97%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing90%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing85%
C98%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing85%
F+G+H62%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats45%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing20%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%

Progress on shared amenities19

As on 16 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes0%
Water supplyYes50%
Sewerage (chamber, lines, septic tank, STP)Yes70%
Storm water drainsYes90%
Landscaping and tree plantingYes0%
Street lightingYes50%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterYes60%
Solid waste management and disposalYes0%
Water conservation, rain water harvestingYes90%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes20%
Electrical meter room, sub-station, receiving stationYes60%
Fire fightingYes20%
Drinking water facilitiesYes40%
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityYes50%
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,880 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 39.40 cr
Cost incurredRs 29.00 cr
Spent of the estimate73.6%
BuildingWingEstimatedIncurred
F+G+HNARs 9.13 crRs 5.30 cr
ANARs 8.15 crRs 5.40 cr
BNARs 8.04 crRs 7.50 cr
CNARs 8.04 crRs 5.20 cr
D+ENARs 6.03 crRs 5.60 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANJAY JOSSHI
EngineerDARSHAN POPATBHAI SUTARIYA

Documents filed45

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/SURAT/SURAT CITY/SUDA/RAA12356/041023 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer's certificate (Form 2)16 Feb 2026
Engineer's certificate annexure16 Feb 2026
Accountant's certificate (Form 3)16 Feb 2026
Architect's certificate (Form 1)14 Feb 2026
Site photograph, B14 Feb 2026
Site photograph, A14 Feb 2026
Site photograph, D+E14 Feb 2026
Site photograph, C14 Feb 2026
Site photograph, F+G+H14 Feb 2026
RERA registration certificate4 Oct 2023
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Surat

37%of this project is bookeddistrict median 39%
15%of Surat projects moved their completion datethis one has not

Computed across the 2,600+ Surat projects on ReraGenie, from their own filings.

Keep SHUKAN RIVER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Surat2,600+ in Surat

2 kmSHUKAN RIVEROther 63Dot size: filed unitsN

Filed coordinates, straight-line distance. 63 registered projects within 2 km.

Builder: SHREE99 INFRAVENUE LLP

SHREE99 INFRAVENUE LLP has 1 registration on GujRERA, including SHUKAN RIVER. Read the full track record. See more projects on the Surat district page.

Frequently asked questions

What are my rights if SHUKAN RIVER is delayed beyond 30 Apr 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of SHUKAN RIVER?

The registered promoter entity is SHREE99 INFRAVENUE LLP, a limited liability partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in SHUKAN RIVER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SHUKAN RIVER?

The professionals named in the filing: Architect: SANJAY JOSSHI; Engineer: DARSHAN POPATBHAI SUTARIYA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHUKAN RIVER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHUKAN RIVER. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHUKAN RIVER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.