Home / Browse projects / Mehsana, Gujarat / Shubh Shukra
Shubh Shukra
RG-GJ-80409 · RERA PR/GJ/MEHSANA/VISNAGAR/Others/RAA01850/EX2/170622 · Last updated on GujRERA portal: 7 Oct 2022
Source: official GujRERA filing
Red flags
- Completion date moved by 24 months
- 2 extensions taken
Clear
- Separate project account declared
Saved.
Shubh Shukra is a Residential/Group Housing project by SHUKRA JEWELLERY LTD in Mehsana, Gujarat, registered with GujRERA as PR/GJ/MEHSANA/VISNAGAR/Others/RAA01850/EX2/170622 on 5 Mar 2018. Possession is promised by 15 Dec 2022. The completion date has moved by 24 months from the original filing. 177 of the 411 units on this registration are recorded sold or booked, and 60 of 99 construction stages are filed complete.
At a glance
Project
- NameShubh Shukra
- TypeResidential/Group Housing
- Location
- CTS No 1500 Shushi Road
- Visnagar
- Visnagar
- Mehsana
- 384315
- Pincode384315
- MapView location on Google Maps (as filed on RERA)
- RERA no.PR/GJ/MEHSANA/VISNAGAR/Others/RAA01850/EX2/170622
- ReraGenie IDRG-GJ-80409
Builder
- NameSHUKRA JEWELLERY LTD
- Entity typeCOMPANY
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusValid until 15 Dec 2022
- Registered on5 Mar 2018
- Promised completion15 Dec 2022
- Revised completionRevised to 15 Dec 2022 (originally 15 Dec 2020)
- Buildings11 building records
- Documents filed48 files
Current status
Figures as on 7 Oct 2022, this project's latest GujRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| B | - | - | - | 40 | 0 | 40 |
| C | - | - | - | 40 | 0 | 40 |
| D | - | - | - | 32 | 0 | 32 |
| E | - | - | - | 40 | 0 | 40 |
| F | - | - | - | 40 | 0 | 40 |
| G | - | - | - | 40 | 0 | 40 |
| H | - | - | - | 40 | 0 | 40 |
| I | - | - | - | 32 | 0 | 32 |
| J | - | - | - | 40 | 0 | 40 |
| K | - | - | - | 27 | 0 | 27 |
| A | - | - | - | 40 | 0 | 40 |
The full filing
Everything below is from the project's own GujRERA filing, free to read.
Construction progress by building11
As on 7 Oct 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
60 of 99 construction stages are filed complete across 11 buildings. The stage furthest along is Internal walls, at 80%.
B89%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
C60%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 80% |
| Sanitary fittings within the flats | 40% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 60% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 30% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 30% |
D47%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 40% |
| Sanitary fittings within the flats | 20% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 30% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 5% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 30% |
E89%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
F89%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
G89%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
H89%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
I35%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 75% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 10% |
| Sanitary fittings within the flats | 0% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 20% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 0% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 10% |
J25%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 25% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 0% |
| Sanitary fittings within the flats | 0% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 0% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 0% |
K25%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 25% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 0% |
| Sanitary fittings within the flats | 0% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 0% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 0% |
A89%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
Progress on shared amenities19
As on 7 Oct 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal roads and footpaths | Yes | 90% |
| Water supply | Yes | 100% |
| Sewerage (chamber, lines, septic tank, STP) | Yes | 100% |
| Storm water drains | Yes | 70% |
| Landscaping and tree planting | Yes | 50% |
| Street lighting | Yes | 50% |
| Community buildings | No | Not applicable |
| Treatment and disposal of sewage and sullage water | Yes | 75% |
| Solid waste management and disposal | Yes | 80% |
| Water conservation, rain water harvesting | Yes | 30% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 85% |
| Fire fighting | No | Not applicable |
| Drinking water facilities | Yes | 100% |
| Emergency evacuation | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Security | No | Not applicable |
| Letter box | Yes | 100% |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A | NA | Rs 1.39 cr | Rs 1.12 cr |
| B | NA | Rs 1.39 cr | Rs 1.12 cr |
| C | NA | Rs 1.39 cr | Rs 1.12 cr |
| D | NA | Rs 1.39 cr | Rs 1.12 cr |
| E | NA | Rs 1.39 cr | Rs 1.12 cr |
| F | NA | Rs 1.39 cr | Rs 1.12 cr |
| G | NA | Rs 1.39 cr | Rs 1.12 cr |
| H | NA | Rs 1.39 cr | Rs 1.12 cr |
| I | NA | Rs 1.39 cr | Rs 1.12 cr |
| J | NA | Rs 1.39 cr | Rs 1.12 cr |
| K | NA | Rs 1.39 cr | Rs 1.12 cr |
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AEJAZ M PUTHAWALA |
| Engineer | AEJAZ M PUTHAWALA |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Documents filed48
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/MEHSANA/VISNAGAR/Others/RAA01850/EX2/170622 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect's certificate (Form 1) | 7 Oct 2022 |
| Engineer's certificate (Form 2) | 7 Oct 2022 |
| Engineer's certificate annexure | 7 Oct 2022 |
| Accountant's certificate (Form 3) | 7 Oct 2022 |
| Site photograph, B | 7 Oct 2022 |
| Site photograph, C | 7 Oct 2022 |
| Site photograph, D | 7 Oct 2022 |
| Site photograph, E | 7 Oct 2022 |
| Site photograph, F | 7 Oct 2022 |
| Site photograph, G | 7 Oct 2022 |
| Site photograph, H | 7 Oct 2022 |
| Site photograph, I | 7 Oct 2022 |
| Site photograph, J | 7 Oct 2022 |
| Site photograph, K | 7 Oct 2022 |
| Site photograph, A | 7 Oct 2022 |
| RERA registration certificate | 5 Mar 2018 |
| Proforma agreement for sale | - |
| Auditor's report (1 of 3) | - |
| Auditor's report (2 of 3) | - |
| Auditor's report (3 of 3) | - |
| Income tax return (1 of 3) | - |
| Income tax return (2 of 3) | - |
| Income tax return (3 of 3) | - |
| Project specific document | - |
| Directors' report (1 of 3) | - |
| Directors' report (2 of 3) | - |
| Directors' report (3 of 3) | - |
| Commencement certificate | - |
| Approved sanctioned plan | - |
| Approved layout plan | - |
| Agreement | - |
| Land location | - |
| Encumbrance certificate | - |
| Area development document | - |
| Proforma allotment letter | - |
| Brochure | - |
| Project related document | - |
| Declaration in Form B | - |
| Project photograph | - |
| Audited balance sheet (1 of 3) | - |
| Audited balance sheet (2 of 3) | - |
| Audited balance sheet (3 of 3) | - |
| Audited profit and loss statement (1 of 3) | - |
| Audited profit and loss statement (2 of 3) | - |
| Audited profit and loss statement (3 of 3) | - |
| Cash flow statement (1 of 3) | - |
| Cash flow statement (2 of 3) | - |
| Cash flow statement (3 of 3) | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mehsana
Computed across the 200+ Mehsana projects on ReraGenie, from their own filings.
Keep Shubh Shukra on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Visnagar200+ in Mehsana
Filed coordinates, straight-line distance. 14 registered projects within 2 km.
SANSKRUTI S SQUARE
SHREE SAI KRISHNA DEVELOPERS
HERITAGE TOWNSHIP
VEDIKA DEVELOPERS
SHREE PRAMUKH APARTMENTS
SHREE PRAMUKH DEVELOPERS
Heritage Trade Center
POOJA INFRASPACE
Heritage Township
HERITAGE INFRACON
DEVANSHI ELEGANCE
BHAVYA ENTERPRISE
See every Mehsana project, with the district possession charts
Builder: SHUKRA JEWELLERY LTD
SHUKRA JEWELLERY LTD has 2 registrations on GujRERA, including Shubh Shukra and Shanti Shukra. Read the full track record. See more projects on the Mehsana district page.
Frequently asked questions
What are my rights if Shubh Shukra is delayed beyond 15 Dec 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.
How do I verify and contact the developer of Shubh Shukra?
The registered promoter entity is SHUKRA JEWELLERY LTD, a company as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.
Is my payment protected in Shubh Shukra?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Shubh Shukra?
The professionals named in the filing: Architect: AEJAZ M PUTHAWALA; Engineer: AEJAZ M PUTHAWALA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Shubh Shukra?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.
Report an error Share feedback