Home / Browse projects / Vadodara, Gujarat / Shreenathji The Dream City
Shreenathji The Dream City
RG-GJ-95611 · RERA PR/GJ/VADODARA/VAGHODIA/Others/RAA01091/EX1/220219 · Last updated on GujRERA portal: 6 Jul 2019
Source: official GujRERA filing
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- Separate project account declared
Saved.
Shreenathji The Dream City is a Residential/Group Housing project by Shreenathji Builders Infra in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VAGHODIA/Others/RAA01091/EX1/220219 on 22 Dec 2017. Possession is promised by 3 Oct 2019. The completion date has moved by 12 months from the original filing.
At a glance
Project
- NameShreenathji The Dream City
- TypeResidential/Group Housing
- Location
- Shreenathji The Dream City
- Opp. Doordarshan
- 75 mtr. main road
- New Waghodia road
- Aamodar
- Amodar
- Vaghodia
- Vadodara
- 390019
- Pincode390019
- MapView location on Google Maps (as filed on RERA)
- RERA no.PR/GJ/VADODARA/VAGHODIA/Others/RAA01091/EX1/220219
- ReraGenie IDRG-GJ-95611
Builder
- NameShreenathji Builders Infra
- Entity typePARTNERSHIP FIRM
Key dates
Key facts
Registration and timeline
- StatusValid until 3 Oct 2019
- Registered on22 Dec 2017
- Promised completion3 Oct 2019
- Revised completionRevised to 3 Oct 2019 (originally 3 Oct 2018)
- Buildings146 building records
- Documents filed181 files
Current status
Figures as on 6 Jul 2019, this project's latest GujRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A7 | - | - | - | - | - | 1 |
| A8 | - | - | - | - | - | 1 |
| A9 | - | - | - | - | - | 1 |
| A10 | - | - | - | - | - | 1 |
| A11 | - | - | - | - | - | 1 |
| A12 | - | - | - | - | - | 1 |
| A13 | - | - | - | - | - | 1 |
| A14 | - | - | - | - | - | 1 |
| A15 | - | - | - | - | - | 1 |
| A16 | - | - | - | - | - | 1 |
| A17 | - | - | - | - | - | 1 |
| A18 | - | - | - | - | - | 1 |
| A19 | - | - | - | - | - | 1 |
| A20 | - | - | - | - | - | 1 |
| A21 | - | - | - | - | - | 1 |
| A22 | - | - | - | - | - | 1 |
| A23 | - | - | - | - | - | 1 |
| A24 | - | - | - | - | - | 1 |
| A25 | - | - | - | - | - | 1 |
| A26 | - | - | - | - | - | 1 |
| A27 | - | - | - | - | - | 1 |
| A28 | - | - | - | - | - | 1 |
| A29 | - | - | - | - | - | 1 |
| A30 | - | - | - | - | - | 1 |
| A31 | - | - | - | - | - | 1 |
| A32 | - | - | - | - | - | 1 |
| A33 | - | - | - | - | - | 1 |
| A34 | - | - | - | - | - | 1 |
| A35 | - | - | - | - | - | 1 |
| A36 | - | - | - | - | - | 1 |
| A37 | - | - | - | - | - | 1 |
| A38 | - | - | - | - | - | 1 |
| A39 | - | - | - | - | - | 1 |
| A40 | - | - | - | - | - | 1 |
| A41 | - | - | - | - | - | 1 |
| A42 | - | - | - | - | - | 1 |
| A43 | - | - | - | - | - | 1 |
| A44 | - | - | - | - | - | 1 |
| A45 | - | - | - | - | - | 1 |
| A46 | - | - | - | - | - | 1 |
| A47 | - | - | - | - | - | 1 |
| A48 | - | - | - | - | - | 1 |
| A49 | - | - | - | - | - | 1 |
| A50 | - | - | - | - | - | 1 |
| A51 | - | - | - | - | - | 1 |
| A52 | - | - | - | - | - | 1 |
| A53 | - | - | - | - | - | 1 |
| A54 | - | - | - | - | - | 1 |
| A55 | - | - | - | - | - | 1 |
| A56 | - | - | - | - | - | 1 |
| A57 | - | - | - | - | - | 1 |
| A58 | - | - | - | - | - | 1 |
| A59 | - | - | - | - | - | 1 |
| A60 | - | - | - | - | - | 1 |
| A61 | - | - | - | - | - | 1 |
| A62 | - | - | - | - | - | 1 |
| A63 | - | - | - | - | - | 1 |
| A64 | - | - | - | - | - | 1 |
| A65 | - | - | - | - | - | 1 |
| A66 | - | - | - | - | - | 1 |
| A67 | - | - | - | - | - | 1 |
| A68 | - | - | - | - | - | 1 |
| A69 | - | - | - | - | - | 1 |
| A70 | - | - | - | - | - | 1 |
| A71 | - | - | - | - | - | 1 |
| A72 | - | - | - | - | - | 1 |
| A73 | - | - | - | - | - | 1 |
| A74 | - | - | - | - | - | 1 |
| A75 | - | - | - | - | - | 1 |
| A76 | - | - | - | - | - | 1 |
| A77 | - | - | - | - | - | 1 |
| B1 | - | - | - | - | - | 1 |
| B2 | - | - | - | - | - | 1 |
| B3 | - | - | - | - | - | 1 |
| B4 | - | - | - | - | - | 1 |
| B5 | - | - | - | - | - | 1 |
| B6 | - | - | - | - | - | 1 |
| B7 | - | - | - | - | - | 1 |
| B8 | - | - | - | - | - | 1 |
| B9 | - | - | - | - | - | 1 |
| B10 | - | - | - | - | - | 1 |
| B11 | - | - | - | - | - | 1 |
| B12 | - | - | - | - | - | 1 |
| B13 | - | - | - | - | - | 1 |
| B14 | - | - | - | - | - | 1 |
| B15 | - | - | - | - | - | 1 |
| B16 | - | - | - | - | - | 1 |
| B17 | - | - | - | - | - | 1 |
| B18 | - | - | - | - | - | 1 |
| B19 | - | - | - | - | - | 1 |
| B20 | - | - | - | - | - | 1 |
| B21 | - | - | - | - | - | 1 |
| B22 | - | - | - | - | - | 1 |
| B23 | - | - | - | - | - | 1 |
| B24 | - | - | - | - | - | 1 |
| B25 | - | - | - | - | - | 1 |
| B26 | - | - | - | - | - | 1 |
| B27 | - | - | - | - | - | 1 |
| B28 | - | - | - | - | - | 1 |
| B29 | - | - | - | - | - | 1 |
| B30 | - | - | - | - | - | 1 |
| B31 | - | - | - | - | - | 1 |
| B32 | - | - | - | - | - | 1 |
| B33 | - | - | - | - | - | 1 |
| B34 | - | - | - | - | - | 1 |
| B35 | - | - | - | - | - | 1 |
| B36 | - | - | - | - | - | 1 |
| B37 | - | - | - | - | - | 1 |
| B38 | - | - | - | - | - | 1 |
| B39 | - | - | - | - | - | 1 |
| B40 | - | - | - | - | - | 1 |
| B41 | - | - | - | - | - | 1 |
| B42 | - | - | - | - | - | 1 |
| B43 | - | - | - | - | - | 1 |
| B44 | - | - | - | - | - | 1 |
| B45 | - | - | - | - | - | 1 |
| B46 | - | - | - | - | - | 1 |
| B47 | - | - | - | - | - | 1 |
| B48 | - | - | - | - | - | 1 |
| B49 | - | - | - | - | - | 1 |
| B50 | - | - | - | - | - | 1 |
| B51 | - | - | - | - | - | 1 |
| B52 | - | - | - | - | - | 1 |
| B53 | - | - | - | - | - | 1 |
| B54 | - | - | - | - | - | 1 |
| B55 | - | - | - | - | - | 1 |
| B56 | - | - | - | - | - | 1 |
| B57 | - | - | - | - | - | 1 |
| B58 | - | - | - | - | - | 1 |
| B59 | - | - | - | - | - | 1 |
| B60 | - | - | - | - | - | 1 |
| B61 | - | - | - | - | - | 1 |
| B62 | - | - | - | - | - | 1 |
| B63 | - | - | - | - | - | 1 |
| B64 | - | - | - | - | - | 1 |
| B65 | - | - | - | - | - | 1 |
| B66 | - | - | - | - | - | 1 |
| B67 | - | - | - | - | - | 1 |
| A+B | - | - | - | - | - | 26 |
| C+D | - | - | - | - | - | 26 |
| A1 | - | - | - | - | - | 1 |
| A2 | - | - | - | - | - | 1 |
| A3 | - | - | - | - | - | 1 |
| A4 | - | - | - | - | - | 1 |
| A5 | - | - | - | - | - | 1 |
| A6 | - | - | - | - | - | 1 |
The full filing
Everything below is from the project's own GujRERA filing, free to read.
Construction progress by building20
As on 6 Jul 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 146 buildings; the table lists the first 20.
660 of 741 construction stages are filed complete across 146 buildings. The stage furthest along is Internal walls, at 80%.
A7100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A8100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A9100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A10100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A11100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A12100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A13100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A14100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A15100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A16100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A17100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A18100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A19100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A20100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A21100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A22100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A23100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A24100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A25100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A26100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
Progress on shared amenities19
As on 6 Jul 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal roads and footpaths | Yes | 75% |
| Water supply | Yes | 90% |
| Sewerage (chamber, lines, septic tank, STP) | Yes | 90% |
| Storm water drains | Yes | 100% |
| Landscaping and tree planting | Yes | 100% |
| Street lighting | Yes | 40% |
| Community buildings | Yes | 70% |
| Treatment and disposal of sewage and sullage water | Yes | 90% |
| Solid waste management and disposal | Yes | 0% |
| Water conservation, rain water harvesting | Yes | 0% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Fire fighting | No | Not applicable |
| Drinking water facilities | Yes | 0% |
| Emergency evacuation | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Security | Yes | 0% |
| Letter box | No | Not applicable |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A1 | NA | Rs 10.79 lakh | Rs 10.39 lakh |
| A2 | NA | Rs 10.79 lakh | Rs 10.39 lakh |
| A3 | NA | Rs 10.79 lakh | Rs 10.39 lakh |
| A4 | NA | Rs 10.79 lakh | Rs 10.39 lakh |
| A5 | NA | Rs 10.79 lakh | Rs 10.39 lakh |
| A6 | NA | Rs 10.79 lakh | Rs 10.39 lakh |
| A7 | NA | Rs 10.79 lakh | Rs 10.39 lakh |
| A8 | NA | Rs 10.79 lakh | Rs 10.39 lakh |
| A9 | NA | Rs 10.79 lakh | Rs 10.39 lakh |
| A10 | NA | Rs 10.79 lakh | Rs 10.39 lakh |
| A11 | NA | Rs 10.79 lakh | Rs 10.39 lakh |
| A12 | NA | Rs 10.79 lakh | Rs 10.39 lakh |
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Anjali Associate |
| Engineer | Zarna Associates |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Documents filed181
As listed on the registration, under the names the promoter filed them with; the newest 80 of 181 are shown. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VAGHODIA/Others/RAA01091/EX1/220219 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect's certificate (Form 1) | 6 Jul 2019 |
| Engineer's certificate (Form 2) | 6 Jul 2019 |
| Site photograph, A7 | 6 Jul 2019 |
| Site photograph, A8 | 6 Jul 2019 |
| Site photograph, A9 | 6 Jul 2019 |
| Site photograph, A10 | 6 Jul 2019 |
| Site photograph, A11 | 6 Jul 2019 |
| Site photograph, A12 | 6 Jul 2019 |
| Site photograph, A13 | 6 Jul 2019 |
| Site photograph, A14 | 6 Jul 2019 |
| Site photograph, A15 | 6 Jul 2019 |
| Site photograph, A16 | 6 Jul 2019 |
| Site photograph, A17 | 6 Jul 2019 |
| Site photograph, A18 | 6 Jul 2019 |
| Site photograph, A19 | 6 Jul 2019 |
| Site photograph, A20 | 6 Jul 2019 |
| Site photograph, A21 | 6 Jul 2019 |
| Site photograph, A22 | 6 Jul 2019 |
| Site photograph, A23 | 6 Jul 2019 |
| Site photograph, A24 | 6 Jul 2019 |
| Site photograph, A25 | 6 Jul 2019 |
| Site photograph, A26 | 6 Jul 2019 |
| Site photograph, A27 | 6 Jul 2019 |
| Site photograph, A28 | 6 Jul 2019 |
| Site photograph, A29 | 6 Jul 2019 |
| Site photograph, A30 | 6 Jul 2019 |
| Site photograph, A31 | 6 Jul 2019 |
| Site photograph, A32 | 6 Jul 2019 |
| Site photograph, A33 | 6 Jul 2019 |
| Site photograph, A34 | 6 Jul 2019 |
| Site photograph, A35 | 6 Jul 2019 |
| Site photograph, A36 | 6 Jul 2019 |
| Site photograph, A37 | 6 Jul 2019 |
| Site photograph, A38 | 6 Jul 2019 |
| Site photograph, A39 | 6 Jul 2019 |
| Site photograph, A40 | 6 Jul 2019 |
| Site photograph, A41 | 6 Jul 2019 |
| Site photograph, A42 | 6 Jul 2019 |
| Site photograph, A43 | 6 Jul 2019 |
| Site photograph, A44 | 6 Jul 2019 |
| Site photograph, A45 | 6 Jul 2019 |
| Site photograph, A46 | 6 Jul 2019 |
| Site photograph, A47 | 6 Jul 2019 |
| Site photograph, A48 | 6 Jul 2019 |
| Site photograph, A49 | 6 Jul 2019 |
| Site photograph, A50 | 6 Jul 2019 |
| Site photograph, A51 | 6 Jul 2019 |
| Site photograph, A52 | 6 Jul 2019 |
| Site photograph, A53 | 6 Jul 2019 |
| Site photograph, A54 | 6 Jul 2019 |
| Site photograph, A55 | 6 Jul 2019 |
| Site photograph, A56 | 6 Jul 2019 |
| Site photograph, A57 | 6 Jul 2019 |
| Site photograph, A58 | 6 Jul 2019 |
| Site photograph, A59 | 6 Jul 2019 |
| Site photograph, A60 | 6 Jul 2019 |
| Site photograph, A61 | 6 Jul 2019 |
| Site photograph, A62 | 6 Jul 2019 |
| Site photograph, A63 | 6 Jul 2019 |
| Site photograph, A64 | 6 Jul 2019 |
| Site photograph, A65 | 6 Jul 2019 |
| Site photograph, A66 | 6 Jul 2019 |
| Site photograph, A67 | 6 Jul 2019 |
| Site photograph, A68 | 6 Jul 2019 |
| Site photograph, A69 | 6 Jul 2019 |
| Site photograph, A70 | 6 Jul 2019 |
| Site photograph, A71 | 6 Jul 2019 |
| Site photograph, A72 | 6 Jul 2019 |
| Site photograph, A73 | 6 Jul 2019 |
| Site photograph, A74 | 6 Jul 2019 |
| Site photograph, A75 | 6 Jul 2019 |
| Site photograph, A76 | 6 Jul 2019 |
| Site photograph, A77 | 6 Jul 2019 |
| Site photograph, B1 | 6 Jul 2019 |
| Site photograph, B2 | 6 Jul 2019 |
| Site photograph, B3 | 6 Jul 2019 |
| Site photograph, B4 | 6 Jul 2019 |
| Site photograph, B5 | 6 Jul 2019 |
| Site photograph, B6 | 6 Jul 2019 |
| Site photograph, B7 | 6 Jul 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Vadodara
Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.
Keep Shreenathji The Dream City on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Amodar2,900+ in Vadodara
Filed coordinates, straight-line distance. 45 registered projects within 2 km.
SHYAMALCOUNTY
SHREE GANESH INFRA
AKSHAR AASHRAY
SHREE AKSHAR ENTERPRISE
ROYAL LIFES
MAKHIJA INFRASTRUCTURE PRIVATE LIMITED
SHREE SIDDHESHWAR HILLCREST
N K CAMPUS
SHREE SIDDHESHWAR HIGHNESS
NYALKARAN PROCON
BLUE'S SPRINGFIELD
BLUE RIVER PROJECTS
See every Vadodara project, with the district possession charts
Builder: Shreenathji Builders Infra
Shreenathji Builders Infra has 1 registration on GujRERA, including Shreenathji The Dream City. Read the full track record. See more projects on the Vadodara district page.
Frequently asked questions
What are my rights if Shreenathji The Dream City is delayed beyond 3 Oct 2019?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.
How do I verify and contact the developer of Shreenathji The Dream City?
The registered promoter entity is Shreenathji Builders Infra, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.
Is my payment protected in Shreenathji The Dream City?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Shreenathji The Dream City?
The professionals named in the filing: Architect: Anjali Associate; Engineer: Zarna Associates. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Shreenathji The Dream City?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.