Home / Browse projects / Vadodara, Gujarat / SHIVAM DUPLEX

Valid until 22 Jul 2019 Residential/Group Housing project

SHIVAM DUPLEX

By SHIVAM INFRASTRUCTURE

RG-GJ-64286 · RERA PR/GJ/VADODARA/VADODARA/Others/RAA00130/120917 · Last updated on GujRERA portal: 22 Jul 2019

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Jul 2019Possession promisedno revision filed
1032 of 1482Construction stages doneacross 175 buildings; furthest along: Stilt Floor, 0%
47 of 174Units unsoldnot recorded sold or booked
Jump to the 212 documents Report an error

SHIVAM DUPLEX is a Residential/Group Housing project by SHIVAM INFRASTRUCTURE in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Others/RAA00130/120917 on 12 Sep 2017. Possession is promised by 22 Jul 2019. 127 of the 174 units on this registration are recorded sold or booked, and 1032 of 1482 construction stages are filed complete.

At a glance

Project

  • NameSHIVAM DUPLEX
  • TypeResidential/Group Housing
  • Location
    • Block no. 108 of Ankhol
    • behind L&T knowledge city nr
    • Himalaya party plot
    • vadodara
    • Ankhol
    • Vadodara
    • 390019
  • Pincode390019
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Others/RAA00130/120917
  • ReraGenie IDRG-GJ-64286

Builder

  • NameSHIVAM INFRASTRUCTURE
  • Entity typePARTNERSHIP FIRM
  • Other registrations4 more →

Key dates

this monthRegisteredSep 2017PromisedJul 2019

Key facts

Registration and timeline

  • StatusValid until 22 Jul 2019
  • Registered on12 Sep 2017
  • Promised completion22 Jul 2019
  • Revised completionNone
  • Buildings175 building records
  • Documents filed212 files

Current status

73%127 of 174 units booked
100.0%Of the estimated cost spent so far

Figures as on 22 Jul 2019, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
D 1---101
C 2---101
C 3---101
C 4---101
C 5---101
C 6---101
C 7---101
C 8---101
C 9---101
D 10---101
D 11---101
C 12---101
C 13---101
C 14---101
C 15---101
C 16---101
C 17---101
C 18---101
C 19---101
D 20---101
D 21---101
C 22---101
C 23---101
C 24---101
C 25---101
C 26---101
C 27---101
C 28---101
C 29---101
D 30---101
D 31---101
C 32---101
C 33---101
C 34---101
C 35---101
C 36---101
C 37---101
C 38---101
C 39---101
D 40---101
D 41---101
C 42---101
C 43---101
C 44---101
C 45---101
C 46---101
C 47---101
C 48---101
C 49---101
D 50---101
D 51---101
C 52---101
C 53---101
C 54---101
C 55---101
C 56---101
C 57---101
C 58---101
C 59---101
D 60---101
D 61---101
C 62---101
C 63---101
C 64---101
C 65---101
C 66---101
C 67---101
C 68---101
C 69---101
D 70---101
D 71---101
C 72---101
C 73---101
C 74---101
C 75---101
C 76---101
C 77---101
C 78---101
C 79---101
D 80---101
D 81---101
C 82---101
C 83---101
C 84---101
C 85---101
C 86---101
C 87---101
C 88---101
C 89 D 90---101
D 91---101
C 92---101
C 93---101
C 94---101
C 95---101
C 96---101
C 97---101
C 98---101
C 99---101
D 100---101
D 101---101
C 102---101
C 103---101
C 104---101
C 105---101
C 106---101
C 107---101
C 108---101
C 109---101
D 110---101
D 111---101
C 112---101
C 113---101
C 114---101
C 115---101
C 116---101
C 117---101
C 118---101
C 119---101
D 120---101
D 121---101
C 122---101
C 123---101
C 124---101
C 125---101
C 126---101
C 127---101
C 128---101
D 129---101
D 130---101
C 131---101
C 132---101
C 133---101
D 134---101
D 135---101
C 136---101
C 137---101
C 138---101
C 139---101
D 140---101
C 141---101
C 142---101
C 143---101
C 144---101
C 145---101
C 146---101
D 147---101
D 148---101
C 149---101
C 150---101
C 151---101
C 152---101
C 153---101
C 154---101
D 155---101
C 156---101
C 157---101
C 158---101
C 159---101
D 160---101
D 161---101
D 162---101
D 162---101
D 163---101
D 164---101
D 165---101
C 166---101
C 167---101
D 168---101
D 169---101
D 170---101
D 171---101
D 172---101
D 173---101
D 174---101
D 175---101

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building20

As on 22 Jul 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 175 buildings; the table lists the first 20.

1032 of 1482 construction stages are filed complete across 175 buildings. The stage furthest along is Stilt Floor, at 0%.

D 189%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
C 289%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
C 389%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
C 489%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
C 589%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
C 689%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
C 789%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
C 889%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
C 989%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
D 1089%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
D 1189%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
C 1289%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
C 1389%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
C 1489%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
C 1589%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
C 1689%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
C 1789%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
C 1889%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
C 1989%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
D 2089%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 22 Jul 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes100%
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area27,502 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 17.85 cr
Cost incurredRs 17.85 cr
Spent of the estimate100.0%
BuildingWingEstimatedIncurred
D 1NARs 10.20 lakhRs 10.20 lakh
C 2NARs 10.20 lakhRs 10.20 lakh
C 3NARs 10.20 lakhRs 10.20 lakh
C 4NARs 10.20 lakhRs 10.20 lakh
C 5NARs 10.20 lakhRs 10.20 lakh
C 6NARs 10.20 lakhRs 10.20 lakh
C 7NARs 10.20 lakhRs 10.20 lakh
C 8NARs 10.20 lakhRs 10.20 lakh
C 9NARs 10.20 lakhRs 10.20 lakh
D 10NARs 10.20 lakhRs 10.20 lakh
D 11NARs 10.20 lakhRs 10.20 lakh
C 12NARs 10.20 lakhRs 10.20 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectADITYA ARCHITECT
EngineerEZ STRUCTURE CONSULTING ENGINEERS

Documents filed212

As listed on the registration, under the names the promoter filed them with; the newest 80 of 212 are shown. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Others/RAA00130/120917 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)22 Jul 2019
Engineer's certificate (Form 2)22 Jul 2019
Accountant's certificate (Form 3)22 Jul 2019
Site photograph, D 120 Jul 2019
Site photograph, C 220 Jul 2019
Site photograph, C 320 Jul 2019
Site photograph, C 420 Jul 2019
Site photograph, C 520 Jul 2019
Site photograph, C 620 Jul 2019
Site photograph, C 720 Jul 2019
Site photograph, C 820 Jul 2019
Site photograph, C 920 Jul 2019
Site photograph, D 1020 Jul 2019
Site photograph, D 1120 Jul 2019
Site photograph, C 1220 Jul 2019
Site photograph, C 1320 Jul 2019
Site photograph, C 1420 Jul 2019
Site photograph, C 1520 Jul 2019
Site photograph, C 1620 Jul 2019
Site photograph, C 1720 Jul 2019
Site photograph, C 1820 Jul 2019
Site photograph, C 1920 Jul 2019
Site photograph, D 2020 Jul 2019
Site photograph, D 2120 Jul 2019
Site photograph, C 2220 Jul 2019
Site photograph, C 2320 Jul 2019
Site photograph, C 2420 Jul 2019
Site photograph, C 2520 Jul 2019
Site photograph, C 2620 Jul 2019
Site photograph, C 2720 Jul 2019
Site photograph, C 2820 Jul 2019
Site photograph, C 2920 Jul 2019
Site photograph, D 3020 Jul 2019
Site photograph, D 3120 Jul 2019
Site photograph, C 3220 Jul 2019
Site photograph, C 3320 Jul 2019
Site photograph, C 3420 Jul 2019
Site photograph, C 3520 Jul 2019
Site photograph, C 3620 Jul 2019
Site photograph, C 3720 Jul 2019
Site photograph, C 3820 Jul 2019
Site photograph, C 3920 Jul 2019
Site photograph, D 4020 Jul 2019
Site photograph, D 4120 Jul 2019
Site photograph, C 4220 Jul 2019
Site photograph, C 4320 Jul 2019
Site photograph, C 4420 Jul 2019
Site photograph, C 4520 Jul 2019
Site photograph, C 4620 Jul 2019
Site photograph, C 4720 Jul 2019
Site photograph, C 4820 Jul 2019
Site photograph, C 4920 Jul 2019
Site photograph, D 5020 Jul 2019
Site photograph, D 5120 Jul 2019
Site photograph, C 5220 Jul 2019
Site photograph, C 5320 Jul 2019
Site photograph, C 5420 Jul 2019
Site photograph, C 5520 Jul 2019
Site photograph, C 5620 Jul 2019
Site photograph, C 5720 Jul 2019
Site photograph, C 5820 Jul 2019
Site photograph, C 5920 Jul 2019
Site photograph, D 6020 Jul 2019
Site photograph, D 6120 Jul 2019
Site photograph, C 6220 Jul 2019
Site photograph, C 6320 Jul 2019
Site photograph, C 6420 Jul 2019
Site photograph, C 6520 Jul 2019
Site photograph, C 6620 Jul 2019
Site photograph, C 6720 Jul 2019
Site photograph, C 6820 Jul 2019
Site photograph, C 6920 Jul 2019
Site photograph, D 7020 Jul 2019
Site photograph, D 7120 Jul 2019
Site photograph, C 7220 Jul 2019
Site photograph, C 7320 Jul 2019
Site photograph, C 7420 Jul 2019
Site photograph, C 7520 Jul 2019
Site photograph, C 7620 Jul 2019
Site photograph, C 7720 Jul 2019

How this compares with Vadodara

73%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one has not

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep SHIVAM DUPLEX on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Ankhol2,900+ in Vadodara

2 kmSHIVAM DUPLEXOther 157Dot size: filed unitsN

Filed coordinates, straight-line distance. 157 registered projects within 2 km.

Builder: SHIVAM INFRASTRUCTURE

SHIVAM INFRASTRUCTURE has 5 registrations on GujRERA, including SHIVAM DUPLEX and PRAMUKH SQUARE. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if SHIVAM DUPLEX is delayed beyond 22 Jul 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of SHIVAM DUPLEX?

The registered promoter entity is SHIVAM INFRASTRUCTURE, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in SHIVAM DUPLEX?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SHIVAM DUPLEX?

The professionals named in the filing: Architect: ADITYA ARCHITECT; Engineer: EZ STRUCTURE CONSULTING ENGINEERS. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHIVAM DUPLEX?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHIVAM DUPLEX. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHIVAM DUPLEX to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.