SHILPI CITY
By SHAH CREAT
RG-GJ-96799 · RERA PR/GJ/BHARUCH/BHARUCH/Others/RAA01116/271217 · Last updated on GujRERA portal: 6 Oct 2023
Source: official GujRERA filing
Red flags
- No red flags in this filing
Clear
- Completion date never moved
Saved.
SHILPI CITY is a Residential/Group Housing project by SHAH CREAT in Bharuch, Gujarat, registered with GujRERA as PR/GJ/BHARUCH/BHARUCH/Others/RAA01116/271217 on 27 Dec 2017. Possession is promised by 30 Jan 2028. 82 of the 122 units on this registration are recorded sold or booked, and 801 of 1098 construction stages are filed complete.
At a glance
Project
- NameSHILPI CITY
- TypeResidential/Group Housing
- Location
- 142 CHAVAJ
- BHARUCH
- Chavaj
- Bharuch
- 392001
- Pincode392001
- MapView location on Google Maps (as filed on RERA)
- RERA no.PR/GJ/BHARUCH/BHARUCH/Others/RAA01116/271217
- ReraGenie IDRG-GJ-96799
Builder
- NameSHAH CREAT
- Entity typePARTNERSHIP FIRM
Key dates
Key facts
Registration and timeline
- StatusValid until 30 Jan 2028
- Registered on27 Dec 2017
- Promised completion30 Jan 2028
- Revised completionNone
- Buildings122 building records
- Documents filed35 files
Current status
Figures as on 6 Oct 2023, this project's latest GujRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUNGALOW NO 1 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 2 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 3 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 4 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 5 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 6 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 7 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 8 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 9 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 10 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 11 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 12 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 13 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 14 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 15 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 16 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 17 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 18 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 19 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 20 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 21 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 22 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 23 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 24 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 25 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 26 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 27 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 28 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 29 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 30 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 31 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 32 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 33 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 34 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 35 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 36 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 37 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 38 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 39 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 40 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 41 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 42 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 43 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 44 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 45 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 46 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 47 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 48 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 49 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 50 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 51 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 52 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 53 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 54 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 55 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 56 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 57 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 58 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 59 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 60 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 61 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 62 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 63 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 64 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 65 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 66 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 67 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 68 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 69 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 70 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 71 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 72 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 73 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 74 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 75 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 76 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 77 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 78 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 79 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 80 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 81 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 82 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 83 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 84 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 85 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 86 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 87 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 88 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 89 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 90 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 91 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 92 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 93 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 94 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 95 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 96 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 97 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 98 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 99 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 100 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 101 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 102 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 103 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 104 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 105 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 106 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 107 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 108 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 109 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 110 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 111 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 112 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 113 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 114 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 115 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 116 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 117 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 118 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 119 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 120 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 121 | - | - | - | 1 | 0 | 1 |
| BUNGALOW NO 122 | - | - | - | 1 | 0 | 1 |
The full filing
Everything below is from the project's own GujRERA filing, free to read.
Construction progress by building20
As on 6 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 122 buildings; the table lists the first 20.
801 of 1098 construction stages are filed complete across 122 buildings. The stage furthest along is External plumbing and external plaster, at 50%.
BUNGALOW NO 189%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 0% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
BUNGALOW NO 289%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 0% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
BUNGALOW NO 389%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 0% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
BUNGALOW NO 489%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 0% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
BUNGALOW NO 589%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 0% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
BUNGALOW NO 689%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 0% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
BUNGALOW NO 789%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 0% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
BUNGALOW NO 889%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 0% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
BUNGALOW NO 989%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 0% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
BUNGALOW NO 1089%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 0% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
BUNGALOW NO 1189%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 0% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
BUNGALOW NO 1289%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 0% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
BUNGALOW NO 1389%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 0% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
BUNGALOW NO 1489%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 0% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
BUNGALOW NO 1589%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 0% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
BUNGALOW NO 1689%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 0% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
BUNGALOW NO 1789%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 0% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
BUNGALOW NO 1889%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 0% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
BUNGALOW NO 1989%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 0% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
BUNGALOW NO 2089%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 0% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
Progress on shared amenities23
As on 6 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal roads and footpaths | Yes | 100% |
| Water supply | Yes | 100% |
| Sewerage (chamber, lines, septic tank, STP) | Yes | 100% |
| Storm water drains | Yes | 100% |
| Landscaping and tree planting | Yes | 100% |
| Street lighting | Yes | 100% |
| Community buildings | Yes | 0% |
| Treatment and disposal of sewage and sullage water | No | Not applicable |
| Solid waste management and disposal | Yes | 0% |
| Water conservation, rain water harvesting | Yes | 0% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Fire fighting | No | Not applicable |
| Drinking water facilities | No | Not applicable |
| Emergency evacuation | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Security | No | Not applicable |
| Letter box | No | Not applicable |
| Compound wall | Yes | 100% |
| Plinth protection | Yes | 100% |
| Water tank | Yes | 100% |
| Other requirements | No | Not applicable |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUNGALOW NO 1 | NA | Rs 5.02 lakh | Rs 3.85 lakh |
| BUNGALOW NO 2 | NA | Rs 5.02 lakh | Rs 3.85 lakh |
| BUNGALOW NO 3 | NA | Rs 5.02 lakh | Rs 3.85 lakh |
| BUNGALOW NO 4 | NA | Rs 5.02 lakh | Rs 3.85 lakh |
| BUNGALOW NO 5 | NA | Rs 5.02 lakh | Rs 3.85 lakh |
| BUNGALOW NO 6 | NA | Rs 5.02 lakh | Rs 3.85 lakh |
| BUNGALOW NO 7 | NA | Rs 5.02 lakh | Rs 3.85 lakh |
| BUNGALOW NO 8 | NA | Rs 5.02 lakh | Rs 3.85 lakh |
| BUNGALOW NO 9 | NA | Rs 5.02 lakh | Rs 3.85 lakh |
| BUNGALOW NO 10 | NA | Rs 5.02 lakh | Rs 3.85 lakh |
| BUNGALOW NO 11 | NA | Rs 5.02 lakh | Rs 3.85 lakh |
| BUNGALOW NO 12 | NA | Rs 5.02 lakh | Rs 3.85 lakh |
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ASHWIN DALAL |
| Engineer | ANIL MISTRY |
Documents filed35
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/BHARUCH/BHARUCH/Others/RAA01116/271217 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Engineer's certificate (Form 2) | 6 Oct 2023 |
| Engineer's certificate annexure | 6 Oct 2023 |
| RERA registration certificate | 27 Dec 2017 |
| Proforma agreement for sale | - |
| Auditor's report (1 of 3) | - |
| Auditor's report (2 of 3) | - |
| Auditor's report (3 of 3) | - |
| Income tax return (1 of 3) | - |
| Income tax return (2 of 3) | - |
| Income tax return (3 of 3) | - |
| Project specific document | - |
| Directors' report (1 of 3) | - |
| Directors' report (2 of 3) | - |
| Directors' report (3 of 3) | - |
| Commencement certificate | - |
| Approved sanctioned plan | - |
| Approved layout plan | - |
| Agreement | - |
| Land location | - |
| Encumbrance certificate | - |
| Area development document | - |
| Proforma allotment letter | - |
| Brochure | - |
| Project related document | - |
| Declaration in Form B | - |
| Project photograph | - |
| Audited balance sheet (1 of 3) | - |
| Audited balance sheet (2 of 3) | - |
| Audited balance sheet (3 of 3) | - |
| Audited profit and loss statement (1 of 3) | - |
| Audited profit and loss statement (2 of 3) | - |
| Audited profit and loss statement (3 of 3) | - |
| Cash flow statement (1 of 3) | - |
| Cash flow statement (2 of 3) | - |
| Cash flow statement (3 of 3) | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bharuch
Computed across the 200+ Bharuch projects on ReraGenie, from their own filings.
Keep SHILPI CITY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Chavaj200+ in Bharuch
Filed coordinates, straight-line distance. 25 registered projects within 2 km.
R K COUNTY
SHREE SAI KRUPA CREATION
SAHJANAND LUXURIA
SAHJANAND BUILD SQUARE LLP
CITY CENTER
DRA NARMADA BUSPORT PRIVATE LIMITED
WELL TRADE CENTER
WELLWORTH INFRASTRUCTURE AND DEVELOPMENT P
SHYAM RICHMOND
JALARAM DEVELOPERS
NARAYAN ARENA
NARAYAN LAND ESTATE
See every Bharuch project, with the district possession charts
Builder: SHAH CREAT
SHAH CREAT has 1 registration on GujRERA, including SHILPI CITY. Read the full track record. See more projects on the Bharuch district page.
Frequently asked questions
What are my rights if SHILPI CITY is delayed beyond 30 Jan 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.
How do I verify and contact the developer of SHILPI CITY?
The registered promoter entity is SHAH CREAT, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.
Is my payment protected in SHILPI CITY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SHILPI CITY?
The professionals named in the filing: Architect: ASHWIN DALAL; Engineer: ANIL MISTRY. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHILPI CITY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.
Report an error Share feedback