Home / Browse projects / Ahmedabad, Gujarat / SHASHWAT HEIGHTS

Valid until 25 Sep 2024 Residential/Group Housing project

SHASHWAT HEIGHTS

By SHASHWAT HEIGHTS LLP

RG-GJ-15369 · RERA PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/RAA06762/A1R/EX1/280324/250924 · Last updated on GujRERA portal: 23 Sep 2024

Source: official GujRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Nothing verified clear yet
Sep 2024Possession promisedmoved 12 months from the original
24 of 27Construction stages doneacross 3 buildings; furthest along: Stilt Floor, 0%
2 of 147Units unsoldnot recorded sold or booked
Jump to the 43 documents Report an error

SHASHWAT HEIGHTS is a Residential/Group Housing project by SHASHWAT HEIGHTS LLP in Ahmedabad, Gujarat, registered with GujRERA as PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/RAA06762/A1R/EX1/280324/250924 on 11 Feb 2020. Possession is promised by 25 Sep 2024. The completion date has moved by 12 months from the original filing. 145 of the 147 units on this registration are recorded sold or booked, and 24 of 27 construction stages are filed complete.

At a glance

Project

  • NameSHASHWAT HEIGHTS
  • TypeResidential/Group Housing
  • Location
    • SHASHWAT HEIGHTS NEAR SWAMINARAYAN MANDIR
    • B/H ARHAM BUNGLOWS
    • SABARMATI
    • Ahmedabad City
    • Ahmedabad
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/RAA06762/A1R/EX1/280324/250924
  • ReraGenie IDRG-GJ-15369

Builder

  • NameSHASHWAT HEIGHTS LLP
  • Entity typeLIMITED LIABILITY PARTNERSHIP FIRM

Key dates

this monthRegisteredFeb 2020First promiseSep 2023Revised toSep 2024

Key facts

Registration and timeline

  • StatusValid until 25 Sep 2024
  • Registered on11 Feb 2020
  • Promised completion25 Sep 2024
  • Revised completionRevised to 25 Sep 2024 (originally 30 Sep 2023)
  • Buildings3 building records
  • Documents filed43 files

Current status

99%145 of 147 units booked
100.0%Of the estimated cost spent so far

Figures as on 23 Sep 2024, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLOCK A---52052
BLOCK C---48048
BLOCK B---47047

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building3

As on 23 Sep 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

24 of 27 construction stages are filed complete across 3 buildings. The stage furthest along is Stilt Floor, at 0%.

BLOCK A89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BLOCK C89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BLOCK B89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 23 Sep 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes100%
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterYes100%
Solid waste management and disposalYes100%
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingYes100%
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyYes100%
SecurityYes100%
Letter boxYes100%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,879 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 19.75 cr
Cost incurredRs 19.75 cr
Spent of the estimate100.0%
BuildingWingEstimatedIncurred
BLOCK ANARs 7.97 crRs 7.97 cr
BLOCK CNARs 5.93 crRs 5.93 cr
BLOCK BNARs 5.85 crRs 5.85 cr

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/RAA06762/A1R/EX1/280324/250924Applied Oct 2023; approved Mar 2024

Documents filed43

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/RAA06762/A1R/EX1/280324/250924 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)23 Sep 2024
Engineer's certificate (Form 2)23 Sep 2024
Engineer's certificate annexure23 Sep 2024
Accountant's certificate (Form 3)23 Sep 2024
Site photograph, BLOCK A5 Jul 2024
Site photograph, BLOCK C5 Jul 2024
Site photograph, BLOCK B5 Jul 2024
RERA registration certificate11 Feb 2020
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Ahmedabad

99%of this project is bookeddistrict median 53%
14%of Ahmedabad projects moved their completion datethis one moved by 12 months

Computed across the 5,400+ Ahmedabad projects on ReraGenie, from their own filings.

Keep SHASHWAT HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Ahmedabad5,400+ in Ahmedabad

2 kmSHASHWAT HEIGHTSOther 64Dot size: filed unitsN

Filed coordinates, straight-line distance. 64 registered projects within 2 km.

Builder: SHASHWAT HEIGHTS LLP

SHASHWAT HEIGHTS LLP has 1 registration on GujRERA, including SHASHWAT HEIGHTS. Read the full track record. See more projects on the Ahmedabad district page.

Frequently asked questions

What are my rights if SHASHWAT HEIGHTS is delayed beyond 25 Sep 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of SHASHWAT HEIGHTS?

The registered promoter entity is SHASHWAT HEIGHTS LLP, a limited liability partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in SHASHWAT HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in SHASHWAT HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHASHWAT HEIGHTS. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHASHWAT HEIGHTS to a free account