Valid until 30 Sep 2027 Residential/Group Housing project

SHARNAM VILLA

By SEJALKUMAR PANNALAL SHAH

RG-GJ-31708 · RERA PR/GJ/BHARUCH/BHARUCH/Others/RAA01115/271217 · Last updated on GujRERA portal: 5 Jul 2024

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Sep 2027Possession promisedno revision filed
0 of 297Construction stages doneacross 33 buildings; furthest along: Excavation, 0%
33 of 33Units unsoldnot recorded sold or booked
Jump to the 70 documents Report an error

SHARNAM VILLA is a Residential/Group Housing project by SEJALKUMAR PANNALAL SHAH in Bharuch, Gujarat, registered with GujRERA as PR/GJ/BHARUCH/BHARUCH/Others/RAA01115/271217 on 27 Dec 2017. Possession is promised by 30 Sep 2027. 0 of the 33 units on this registration are recorded sold or booked, and 0 of 297 construction stages are filed complete.

At a glance

Project

  • NameSHARNAM VILLA
  • TypeResidential/Group Housing
  • Location
    • R S NO 81 MANGLESHWAR
    • MANGLESHWAR BHARUCH
    • Mangleshwar
    • Bharuch
    • 392210
  • Pincode392210
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/BHARUCH/BHARUCH/Others/RAA01115/271217
  • ReraGenie IDRG-GJ-31708

Builder

  • NameSEJALKUMAR PANNALAL SHAH
  • Entity typeIndividual/Propritorship
  • Other registrations2 more →

Key dates

this monthRegisteredDec 2017PromisedSep 2027

Key facts

Registration and timeline

  • StatusValid until 30 Sep 2027
  • Registered on27 Dec 2017
  • Promised completion30 Sep 2027
  • Revised completionNone
  • Buildings33 building records
  • Documents filed70 files

Current status

0%0 of 33 units booked
0.0%Of the estimated cost spent so far

Figures as on 5 Jul 2024, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUNGALOW NO 24---101
BUNGALOW NO 25---101
BUNGALOW NO 26---101
BUNGALOW NO 27---101
BUNGALOW NO 28---101
BUNGALOW NO 29---101
BUNGALOW NO 30---101
BUNGALOW NO 31---101
BUNGALOW NO 32---101
BUNGALOW NO 33---101
BUNGALOW NO 1---101
BUNGALOW NO 2---101
BUNGALOW NO 3---101
BUNGALOW NO 4---101
BUNGALOW NO 5---101
BUNGALOW NO 6---101
BUNGALOW NO 7---101
BUNGALOW NO 8---101
BUNGALOW NO 9---101
BUNGALOW NO 10---101
BUNGALOW NO 11---101
BUNGALOW NO 12---101
BUNGALOW NO 13---101
BUNGALOW NO 14---101
BUNGALOW NO 15---101
BUNGALOW NO 16---101
BUNGALOW NO 17---101
BUNGALOW NO 18---101
BUNGALOW NO 19---101
BUNGALOW NO 20---101
BUNGALOW NO 21---101
BUNGALOW NO 22---101
BUNGALOW NO 23---101

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building20

As on 5 Jul 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 33 buildings; the table lists the first 20.

0 of 297 construction stages are filed complete across 33 buildings. The stage furthest along is Excavation, at 0%.

BUNGALOW NO 240%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
BUNGALOW NO 250%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
BUNGALOW NO 260%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
BUNGALOW NO 270%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
BUNGALOW NO 280%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
BUNGALOW NO 290%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
BUNGALOW NO 300%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
BUNGALOW NO 310%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
BUNGALOW NO 320%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
BUNGALOW NO 330%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
BUNGALOW NO 10%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
BUNGALOW NO 20%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
BUNGALOW NO 30%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
BUNGALOW NO 40%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
BUNGALOW NO 50%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
BUNGALOW NO 60%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
BUNGALOW NO 70%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
BUNGALOW NO 80%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
BUNGALOW NO 90%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
BUNGALOW NO 100%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%

Progress on shared amenities19

As on 5 Jul 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes0%
Water supplyYes0%
Sewerage (chamber, lines, septic tank, STP)Yes0%
Storm water drainsYes0%
Landscaping and tree plantingYes0%
Street lightingYes0%
Community buildingsYes0%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes0%
Water conservation, rain water harvestingYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area24,686 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 4.10 cr
Spent of the estimate0.0%
BuildingWingEstimatedIncurred
BUNGALOW NO 1NARs 12.41 lakh-
BUNGALOW NO 10NARs 12.41 lakh-
BUNGALOW NO 11NARs 12.41 lakh-
BUNGALOW NO 12NARs 12.41 lakh-
BUNGALOW NO 13NARs 12.41 lakh-
BUNGALOW NO 14NARs 12.41 lakh-
BUNGALOW NO 15NARs 12.41 lakh-
BUNGALOW NO 16NARs 12.41 lakh-
BUNGALOW NO 17NARs 12.41 lakh-
BUNGALOW NO 18NARs 12.41 lakh-
BUNGALOW NO 19NARs 12.41 lakh-
BUNGALOW NO 2NARs 12.41 lakh-

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectASHWIN DALAL
EngineerANIL MISTRY

Documents filed70

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/BHARUCH/BHARUCH/Others/RAA01115/271217 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)5 Jul 2024
Architect's certificate (Form 1)4 Jul 2024
Engineer's certificate (Form 2)4 Jul 2024
Engineer's certificate annexure4 Jul 2024
Site photograph, BUNGALOW NO 243 Jul 2024
Site photograph, BUNGALOW NO 253 Jul 2024
Site photograph, BUNGALOW NO 263 Jul 2024
Site photograph, BUNGALOW NO 273 Jul 2024
Site photograph, BUNGALOW NO 283 Jul 2024
Site photograph, BUNGALOW NO 293 Jul 2024
Site photograph, BUNGALOW NO 303 Jul 2024
Site photograph, BUNGALOW NO 313 Jul 2024
Site photograph, BUNGALOW NO 323 Jul 2024
Site photograph, BUNGALOW NO 333 Jul 2024
Site photograph, BUNGALOW NO 13 Jul 2024
Site photograph, BUNGALOW NO 23 Jul 2024
Site photograph, BUNGALOW NO 33 Jul 2024
Site photograph, BUNGALOW NO 43 Jul 2024
Site photograph, BUNGALOW NO 53 Jul 2024
Site photograph, BUNGALOW NO 63 Jul 2024
Site photograph, BUNGALOW NO 73 Jul 2024
Site photograph, BUNGALOW NO 83 Jul 2024
Site photograph, BUNGALOW NO 93 Jul 2024
Site photograph, BUNGALOW NO 103 Jul 2024
Site photograph, BUNGALOW NO 113 Jul 2024
Site photograph, BUNGALOW NO 123 Jul 2024
Site photograph, BUNGALOW NO 133 Jul 2024
Site photograph, BUNGALOW NO 143 Jul 2024
Site photograph, BUNGALOW NO 153 Jul 2024
Site photograph, BUNGALOW NO 163 Jul 2024
Site photograph, BUNGALOW NO 173 Jul 2024
Site photograph, BUNGALOW NO 183 Jul 2024
Site photograph, BUNGALOW NO 193 Jul 2024
Site photograph, BUNGALOW NO 203 Jul 2024
Site photograph, BUNGALOW NO 213 Jul 2024
Site photograph, BUNGALOW NO 223 Jul 2024
Site photograph, BUNGALOW NO 233 Jul 2024
RERA registration certificate27 Dec 2017
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Bharuch

0%of this project is bookeddistrict median 52%
20%of Bharuch projects moved their completion datethis one has not

Computed across the 200+ Bharuch projects on ReraGenie, from their own filings.

Keep SHARNAM VILLA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Mangleshwar200+ in Bharuch

Builder: SEJALKUMAR PANNALAL SHAH

SEJALKUMAR PANNALAL SHAH has 3 registrations on GujRERA, including SUNDARAM RESIDENCY and SHAMIYANA PARK. Read the full track record. See more projects on the Bharuch district page.

Frequently asked questions

What are my rights if SHARNAM VILLA is delayed beyond 30 Sep 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of SHARNAM VILLA?

The registered promoter entity is SEJALKUMAR PANNALAL SHAH, an individual/propritorship as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in SHARNAM VILLA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SHARNAM VILLA?

The professionals named in the filing: Architect: ASHWIN DALAL; Engineer: ANIL MISTRY. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHARNAM VILLA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHARNAM VILLA. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHARNAM VILLA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.