Home / Browse projects / Dharwad, Karnataka / “SHARAN RESIDENCY BLOCK C”

Registration approved No litigation declared Residential/Group Housing project

“SHARAN RESIDENCY BLOCK C”

By R R LANDMARKS PRIVATE LIMITED

RG-KA-66093 · RERA PRM/KA/RERA/1259/479/PR/220424/006819 · Last updated on RERA Karnataka portal: 18 Apr 2024

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Mar 2025Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 128 documents Report an error

“SHARAN RESIDENCY BLOCK C” is a Residential/Group Housing project by R R LANDMARKS PRIVATE LIMITED in Dharwad, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1259/479/PR/220424/006819 on 22 Apr 2024. Possession is promised by 31 Mar 2025.

At a glance

Project

  • Name“SHARAN RESIDENCY BLOCK C”
  • TypeResidential/Group Housing
  • Location
    • Hubballi
    • Dharwad
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1259/479/PR/220424/006819
  • ReraGenie IDRG-KA-66093

Builder

  • NameR R LANDMARKS PRIVATE LIMITED
  • Entity typeCompany
  • CINU45200PN2010PTC136255
  • GSTIN29AAFCR0170A1ZT
  • Authorized SignatoryHEMANNA PAMPANNA PAWALI
  • Managing DirectorHEMANNA PAMPANNA PAWALI
  • DirectorVINAY HEMANNA PAWLI
  • Project HeadVILAS TRIMBAKAPPA NITTURE

Key dates

this monthRegisteredApr 2024PromisedMar 2025

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on22 Apr 2024
  • Promised completion31 Mar 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed128 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
“SHARAN RESIDENCY BLOCK C”---24024

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 18 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Elevation work-
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 18 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners1
LandownerVillageDistrict
R R LANDMARKS PVT LIMITED, HEMANNA PAMPANNA PAWALI--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 3.01 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 2.93 cr-
Architects and Engineer Consultant fees EtcRs 8.78 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/S VASUDEV A PATIL & ASSOCIATES
EngineerVASUDEV ANANTRAO PATIL
Chartered AccountantMukesh Mansukhlal Mehta

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed128

As listed on the registration, under the names the promoter filed them with; the newest 80 of 128 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1259/479/PR/220424/006819 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Uploaded the concerned HESCOM Application Self-attested copy Applied for NOC issued by HESCOMFile: HESCOM NOC application.pdf18 Apr 2024
Uploaded the Concerned Water Board Application Copy With Self Attested Copy of Applied For NOCFile: Water Board NOC Application.pdf18 Apr 2024
Uploaded the concerned HESCOM Application Self-attested copy Applied for NOC issued by HESCOMFile: HESCOM NOC application.pdf3 Apr 2024
Uploaded the Concerned Water Board Application Copy With Self Attested Copy of Applied For NOCFile: Water Board NOC Application.pdf3 Apr 2024
Uploaded Declaration Letter for KSPCB NOCFile: Declaration Letter for KSPCB NOC.pdf3 Apr 2024
Uploaded the concerned HESCOM Application Self-attested copy Applied for NOC issued by HESCOMFile: HESCOM NOC application.pdf18 Mar 2024
Uploaded the Concerned Water Board Application Copy With Self Attested Copy of Applied For NOCFile: Water Board NOC Application.pdf18 Mar 2024
Uploaded Declaration Letter for KSPCB NOCFile: Declaration Letter for KSPCB NOC.pdf18 Mar 2024
Declaration regarding Sources of funds to complete the project with supporting documentFile: Declaration regarding Sources of funds to complete the project with supporting document.pd23 Feb 2024
Uploaded Declaration Letter for Registration fees paid as per total plot area measurementFile: Declaration Letter for Registration fees paid as per total plot area measurement.pdf23 Feb 2024
Uploaded Affidavit Cum Declaration For HESCOM NOC and Water Board NOCFile: Affidavit Cum Declaration For HESCOM NOC and Water Board NOC.pdf23 Feb 2024
Uploaded STP drawing certified by the Engineer per the KSPCB NOCFile: STP drawing certified by the Engineer per the KSPCB NOC.pdf23 Feb 2024
Uploaded Form 6 Engineer certificate in the prescribed formatFile: Form 6 Engineer certificate in the prescribed format.pdf23 Feb 2024
Uploaded Sources of funds to complete the projectFile: Declaration regarding Sources of funds to complete the project.pdf9 Feb 2024
Uploaded EC from 15-7-2022 to till dateFile: EC 15-07-2022 to till date.pdf9 Feb 2024
Uploaded Calculation sheet certified by the EngineerFile: Calculation sheet certified by the Engineer.pdf9 Feb 2024
Uploaded Form-6 Engineer certificate in the prescribed formatFile: Form-6 Engineer certificate in the prescribed format.pdf9 Feb 2024
Uploaded Form-5 Architect certificate in the prescribed formatFile: Form-5 Architect certificate in the prescribed format.pdf9 Feb 2024
Uploaded Declaration letter Power supply NOC and Water supply NOCFile: Declaration letter Power supply NOC and Water supply NOC.pdf9 Feb 2024
Uploaded Declaration letter STP drawing certified by the Engineer as per the KSPCB NOCFile: Declaration letter STP drawing certified by the Engineer per the KSPCB NOC.pdf9 Feb 2024
Letter for Registration fees paid as per total plot area measurementFile: Letter for Registration fees paid as per total plot area measurement.pdf9 Feb 2024
Profit and loss account and balance sheet 2022-23 with CA UDINFile: Profit and loss account and balance sheet 2022-23 with CA UDIN.pdf13 Jan 2024
Declaration letter regarding Sources of funds to complete the projectFile: Declaration regarding Sources of funds to complete the project.pdf13 Jan 2024
EC from 15/7/2022 to till dateFile: EC Applied receipt & Letter.pdf13 Jan 2024
Architects certificate with valid COA numberFile: Architects certificate with valid COA number.pdf13 Jan 2024
Declaration letter regarding KSPCB CFEFile: Declaration letter regarding KSPCB.pdf13 Jan 2024
Certified Carpet area calculationFile: Certified Carpet area calculation.pdf13 Jan 2024
Calculation sheet certified by the EngineerFile: Calculation sheet certified by the Engineer.pdf13 Jan 2024
Amenities and Common area detailsFile: Amenities and Common area details.jpeg13 Jan 2024
Self attested Engineer license certificateFile: Self attested Engineer license certificate.pdf13 Jan 2024
Declaration letter regarding New Project LaunchFile: New Project Launch.pdf13 Jan 2024
Declaration letter regarding Power supply NOC and Water supply NOCFile: Declaration Power supply NOC and Water supply NOC.pdf13 Jan 2024
Declaration letter regarding STP drawing certified by the EngineerFile: Declaration STP drawing certified by the Engineer.pdf13 Jan 2024
Section 3 of 1 Notirized AffidavitFile: Section 3 of 1 Notirized Affidavit.pdf13 Jan 2024
Bank affidavitFile: Bank Affidavit.pdf23 Dec 2023
Profit and loss account and balance sheet 2020-21File: Profit and loss account and balance sheet 2020-21.pdf23 Dec 2023
Profit and loss account and balance sheet 2021-22File: Profit and loss account and balance sheet 2021-22.pdf23 Dec 2023
Profit and loss account and balance sheet 2022-23File: Profit and loss account and balance sheet 2022-23.pdf23 Dec 2023
Sources of funds to complete the projectFile: Sources of funds to complete the project.pdf23 Dec 2023
Estimated cost of the project is matched with the CA certificateFile: Estimated cost of the project is matched with the CA certificate.pdf23 Dec 2023
Connected MRFile: Connected MR Mutation.pdf23 Dec 2023
ECFile: EC.pdf23 Dec 2023
latest katha extract obtained from municipalityFile: Latest katha extract obtained from municipality.pdf23 Dec 2023
Clear FORM-BFile: Clear FORM B.pdf23 Dec 2023
Architects certificate with valid COA numberFile: Architects certificate with valid COA number.pdf23 Dec 2023
Declaration Regarding KSPCB NOCFile: Declaration Regarding KSPCB NOC.pdf23 Dec 2023
Single plot layoutFile: Single Plot Layout.pdf23 Dec 2023
Single plot layout orderFile: Single Plot Layout order.pdf23 Dec 2023
CDP map showing the proposed siteFile: CDP map showing the proposed site.pdf23 Dec 2023
Village map showing the proposed siteFile: Village map showing the proposed site.pdf23 Dec 2023
Occupancy of existing buildingFile: Occupancy Certificate Issued By the Planning Authority.pdf23 Dec 2023
Engineer license issued by the concerned local development planning AuthorityFile: Engineer license issued by the concerned local development planning Authority.pdf23 Dec 2023
Declaration New Project LaunchFile: New Project Launch.pdf23 Dec 2023
Engineer certificateFile: Engineer certificate.pdf23 Dec 2023
Original Structural Stability CertificateFile: Original Structural Stability Certificate.pdf23 Dec 2023
Declaration Power supply NOC and Water supply NOCFile: Declaration Power supply NOC and Water supply NOC.pdf23 Dec 2023
Land cost calculation sheet as per the guidance value Self-attested copyFile: Land cost calculation sheet as per the guidance value Self-attested copy.pdf23 Dec 2023
Registration CertificateFile: Company Registration Certificate.pdf-
Organization StructureFile: Orgnization Structure.pdf-
Certificate issued by CA Form 1File: Certificate issued by CA Form 1.pdf-
Certificate issued by Architect Form 2File: Certificate issued by Architect Form 2.pdf-
Certificate issued by Engineer Form 3File: Certificate issued by Engineer Form 3.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Non Litigation Affidavit.pdf-
Certificate from Chartered AccountFile: Certificate from CA.pdf-
Balance Sheet 2022 - 2023File: Balance Sheet 2019-20.pdf-
Balance Sheet 2021 - 2022File: Balance Sheet 2021-22.pdf-
Balance Sheet 2020 - 2021File: Balance Sheet 2020-21.pdf-
Audited Profit and Loss Statement 2022 - 2023File: Profit & Loss 2019-20.pdf-
Audited Profit and Loss Statement 2021 - 2022File: Profit & Loss 2021-22.pdf-
Audited Profit and Loss Statement 2020 - 2021File: Profit & Loss 2020-21.pdf-
Director's Report 2022 - 2023File: Audit & Director Report 2019-20.pdf-
Director's Report 2021 - 2022File: Audit & Director Report 2021-22.pdf-
Director's Report 2020 - 2021File: Audit & Director Report 2020-21.pdf-
Auditor's Report 2022 - 2023File: Audit & Director Report 2019-20.pdf-
Auditor's Report 2021 - 2022File: Audit & Director Report 2021-22.pdf-
Auditor's Report 2020 - 2021File: Audit & Director Report 2020-21.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: ITR ACKNOWLEDGEMENT 2022-23.pdf-

How this compares with Dharwad

29%of Dharwad projects moved their completion datethis one has not
0%of Dharwad registrations are shown as withdrawn or revokedthis one is not

Computed across the 250+ Dharwad projects on ReraGenie, from their own filings.

Keep “SHARAN RESIDENCY BLOCK C” on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dharwad250+ in Dharwad

Builder: R R LANDMARKS PRIVATE LIMITED

R R LANDMARKS PRIVATE LIMITED has 1 registration on RERA Karnataka, including “SHARAN RESIDENCY BLOCK C”. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dharwad district page.

Frequently asked questions

What are my rights if “SHARAN RESIDENCY BLOCK C” is delayed beyond 31 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of “SHARAN RESIDENCY BLOCK C”?

The registered promoter entity is R R LANDMARKS PRIVATE LIMITED, a company as per the filing. Its CIN U45200PN2010PTC136255 and GSTIN 29AAFCR0170A1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in “SHARAN RESIDENCY BLOCK C”?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at “SHARAN RESIDENCY BLOCK C”?

The professionals named in the filing: Architect: M/S VASUDEV A PATIL & ASSOCIATES; Engineer: VASUDEV ANANTRAO PATIL; Chartered Accountant: Mukesh Mansukhlal Mehta. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in “SHARAN RESIDENCY BLOCK C”?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About “SHARAN RESIDENCY BLOCK C”. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save “SHARAN RESIDENCY BLOCK C” to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.