Home / Browse projects / Dharwad, Karnataka / “SHARAN RESIDENCY BLOCK C”
“SHARAN RESIDENCY BLOCK C”
By R R LANDMARKS PRIVATE LIMITED
RG-KA-66093 · RERA PRM/KA/RERA/1259/479/PR/220424/006819 · Last updated on RERA Karnataka portal: 18 Apr 2024
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
“SHARAN RESIDENCY BLOCK C” is a Residential/Group Housing project by R R LANDMARKS PRIVATE LIMITED in Dharwad, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1259/479/PR/220424/006819 on 22 Apr 2024. Possession is promised by 31 Mar 2025.
At a glance
Project
- Name“SHARAN RESIDENCY BLOCK C”
- TypeResidential/Group Housing
- Location
- Hubballi
- Dharwad
- PincodeNot stated
- RERA no.PRM/KA/RERA/1259/479/PR/220424/006819
- ReraGenie IDRG-KA-66093
Builder
- NameR R LANDMARKS PRIVATE LIMITED
- Entity typeCompany
- CINU45200PN2010PTC136255
- GSTIN29AAFCR0170A1ZT
- Authorized SignatoryHEMANNA PAMPANNA PAWALI
- Managing DirectorHEMANNA PAMPANNA PAWALI
- DirectorVINAY HEMANNA PAWLI
- Project HeadVILAS TRIMBAKAPPA NITTURE
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on22 Apr 2024
- Promised completion31 Mar 2025
- Revised completionNone
- Buildings1 building record
- Documents filed128 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| “SHARAN RESIDENCY BLOCK C” | - | - | - | 24 | 0 | 24 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 18 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | - |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | - |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | Not applicable |
Progress on shared amenities40
As on 18 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | No | Not applicable |
| Water conservation/rain water harvesting/recharge of ground water | No | Not applicable |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | No | Not applicable |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | No | Not applicable |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | No | Not applicable |
| Piped Gas | No | Not applicable |
| Water and Sanitation | No | Not applicable |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | Yes | - |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| R R LANDMARKS PVT LIMITED, HEMANNA PAMPANNA PAWALI | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 2.93 cr | - |
| Architects and Engineer Consultant fees Etc | Rs 8.78 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | M/S VASUDEV A PATIL & ASSOCIATES |
| Engineer | VASUDEV ANANTRAO PATIL |
| Chartered Accountant | Mukesh Mansukhlal Mehta |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed128
As listed on the registration, under the names the promoter filed them with; the newest 80 of 128 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1259/479/PR/220424/006819 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Uploaded the concerned HESCOM Application Self-attested copy Applied for NOC issued by HESCOMFile: HESCOM NOC application.pdf | 18 Apr 2024 |
| Uploaded the Concerned Water Board Application Copy With Self Attested Copy of Applied For NOCFile: Water Board NOC Application.pdf | 18 Apr 2024 |
| Uploaded the concerned HESCOM Application Self-attested copy Applied for NOC issued by HESCOMFile: HESCOM NOC application.pdf | 3 Apr 2024 |
| Uploaded the Concerned Water Board Application Copy With Self Attested Copy of Applied For NOCFile: Water Board NOC Application.pdf | 3 Apr 2024 |
| Uploaded Declaration Letter for KSPCB NOCFile: Declaration Letter for KSPCB NOC.pdf | 3 Apr 2024 |
| Uploaded the concerned HESCOM Application Self-attested copy Applied for NOC issued by HESCOMFile: HESCOM NOC application.pdf | 18 Mar 2024 |
| Uploaded the Concerned Water Board Application Copy With Self Attested Copy of Applied For NOCFile: Water Board NOC Application.pdf | 18 Mar 2024 |
| Uploaded Declaration Letter for KSPCB NOCFile: Declaration Letter for KSPCB NOC.pdf | 18 Mar 2024 |
| Declaration regarding Sources of funds to complete the project with supporting documentFile: Declaration regarding Sources of funds to complete the project with supporting document.pd | 23 Feb 2024 |
| Uploaded Declaration Letter for Registration fees paid as per total plot area measurementFile: Declaration Letter for Registration fees paid as per total plot area measurement.pdf | 23 Feb 2024 |
| Uploaded Affidavit Cum Declaration For HESCOM NOC and Water Board NOCFile: Affidavit Cum Declaration For HESCOM NOC and Water Board NOC.pdf | 23 Feb 2024 |
| Uploaded STP drawing certified by the Engineer per the KSPCB NOCFile: STP drawing certified by the Engineer per the KSPCB NOC.pdf | 23 Feb 2024 |
| Uploaded Form 6 Engineer certificate in the prescribed formatFile: Form 6 Engineer certificate in the prescribed format.pdf | 23 Feb 2024 |
| Uploaded Sources of funds to complete the projectFile: Declaration regarding Sources of funds to complete the project.pdf | 9 Feb 2024 |
| Uploaded EC from 15-7-2022 to till dateFile: EC 15-07-2022 to till date.pdf | 9 Feb 2024 |
| Uploaded Calculation sheet certified by the EngineerFile: Calculation sheet certified by the Engineer.pdf | 9 Feb 2024 |
| Uploaded Form-6 Engineer certificate in the prescribed formatFile: Form-6 Engineer certificate in the prescribed format.pdf | 9 Feb 2024 |
| Uploaded Form-5 Architect certificate in the prescribed formatFile: Form-5 Architect certificate in the prescribed format.pdf | 9 Feb 2024 |
| Uploaded Declaration letter Power supply NOC and Water supply NOCFile: Declaration letter Power supply NOC and Water supply NOC.pdf | 9 Feb 2024 |
| Uploaded Declaration letter STP drawing certified by the Engineer as per the KSPCB NOCFile: Declaration letter STP drawing certified by the Engineer per the KSPCB NOC.pdf | 9 Feb 2024 |
| Letter for Registration fees paid as per total plot area measurementFile: Letter for Registration fees paid as per total plot area measurement.pdf | 9 Feb 2024 |
| Profit and loss account and balance sheet 2022-23 with CA UDINFile: Profit and loss account and balance sheet 2022-23 with CA UDIN.pdf | 13 Jan 2024 |
| Declaration letter regarding Sources of funds to complete the projectFile: Declaration regarding Sources of funds to complete the project.pdf | 13 Jan 2024 |
| EC from 15/7/2022 to till dateFile: EC Applied receipt & Letter.pdf | 13 Jan 2024 |
| Architects certificate with valid COA numberFile: Architects certificate with valid COA number.pdf | 13 Jan 2024 |
| Declaration letter regarding KSPCB CFEFile: Declaration letter regarding KSPCB.pdf | 13 Jan 2024 |
| Certified Carpet area calculationFile: Certified Carpet area calculation.pdf | 13 Jan 2024 |
| Calculation sheet certified by the EngineerFile: Calculation sheet certified by the Engineer.pdf | 13 Jan 2024 |
| Amenities and Common area detailsFile: Amenities and Common area details.jpeg | 13 Jan 2024 |
| Self attested Engineer license certificateFile: Self attested Engineer license certificate.pdf | 13 Jan 2024 |
| Declaration letter regarding New Project LaunchFile: New Project Launch.pdf | 13 Jan 2024 |
| Declaration letter regarding Power supply NOC and Water supply NOCFile: Declaration Power supply NOC and Water supply NOC.pdf | 13 Jan 2024 |
| Declaration letter regarding STP drawing certified by the EngineerFile: Declaration STP drawing certified by the Engineer.pdf | 13 Jan 2024 |
| Section 3 of 1 Notirized AffidavitFile: Section 3 of 1 Notirized Affidavit.pdf | 13 Jan 2024 |
| Bank affidavitFile: Bank Affidavit.pdf | 23 Dec 2023 |
| Profit and loss account and balance sheet 2020-21File: Profit and loss account and balance sheet 2020-21.pdf | 23 Dec 2023 |
| Profit and loss account and balance sheet 2021-22File: Profit and loss account and balance sheet 2021-22.pdf | 23 Dec 2023 |
| Profit and loss account and balance sheet 2022-23File: Profit and loss account and balance sheet 2022-23.pdf | 23 Dec 2023 |
| Sources of funds to complete the projectFile: Sources of funds to complete the project.pdf | 23 Dec 2023 |
| Estimated cost of the project is matched with the CA certificateFile: Estimated cost of the project is matched with the CA certificate.pdf | 23 Dec 2023 |
| Connected MRFile: Connected MR Mutation.pdf | 23 Dec 2023 |
| ECFile: EC.pdf | 23 Dec 2023 |
| latest katha extract obtained from municipalityFile: Latest katha extract obtained from municipality.pdf | 23 Dec 2023 |
| Clear FORM-BFile: Clear FORM B.pdf | 23 Dec 2023 |
| Architects certificate with valid COA numberFile: Architects certificate with valid COA number.pdf | 23 Dec 2023 |
| Declaration Regarding KSPCB NOCFile: Declaration Regarding KSPCB NOC.pdf | 23 Dec 2023 |
| Single plot layoutFile: Single Plot Layout.pdf | 23 Dec 2023 |
| Single plot layout orderFile: Single Plot Layout order.pdf | 23 Dec 2023 |
| CDP map showing the proposed siteFile: CDP map showing the proposed site.pdf | 23 Dec 2023 |
| Village map showing the proposed siteFile: Village map showing the proposed site.pdf | 23 Dec 2023 |
| Occupancy of existing buildingFile: Occupancy Certificate Issued By the Planning Authority.pdf | 23 Dec 2023 |
| Engineer license issued by the concerned local development planning AuthorityFile: Engineer license issued by the concerned local development planning Authority.pdf | 23 Dec 2023 |
| Declaration New Project LaunchFile: New Project Launch.pdf | 23 Dec 2023 |
| Engineer certificateFile: Engineer certificate.pdf | 23 Dec 2023 |
| Original Structural Stability CertificateFile: Original Structural Stability Certificate.pdf | 23 Dec 2023 |
| Declaration Power supply NOC and Water supply NOCFile: Declaration Power supply NOC and Water supply NOC.pdf | 23 Dec 2023 |
| Land cost calculation sheet as per the guidance value Self-attested copyFile: Land cost calculation sheet as per the guidance value Self-attested copy.pdf | 23 Dec 2023 |
| Registration CertificateFile: Company Registration Certificate.pdf | - |
| Organization StructureFile: Orgnization Structure.pdf | - |
| Certificate issued by CA Form 1File: Certificate issued by CA Form 1.pdf | - |
| Certificate issued by Architect Form 2File: Certificate issued by Architect Form 2.pdf | - |
| Certificate issued by Engineer Form 3File: Certificate issued by Engineer Form 3.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Non Litigation Affidavit.pdf | - |
| Certificate from Chartered AccountFile: Certificate from CA.pdf | - |
| Balance Sheet 2022 - 2023File: Balance Sheet 2019-20.pdf | - |
| Balance Sheet 2021 - 2022File: Balance Sheet 2021-22.pdf | - |
| Balance Sheet 2020 - 2021File: Balance Sheet 2020-21.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: Profit & Loss 2019-20.pdf | - |
| Audited Profit and Loss Statement 2021 - 2022File: Profit & Loss 2021-22.pdf | - |
| Audited Profit and Loss Statement 2020 - 2021File: Profit & Loss 2020-21.pdf | - |
| Director's Report 2022 - 2023File: Audit & Director Report 2019-20.pdf | - |
| Director's Report 2021 - 2022File: Audit & Director Report 2021-22.pdf | - |
| Director's Report 2020 - 2021File: Audit & Director Report 2020-21.pdf | - |
| Auditor's Report 2022 - 2023File: Audit & Director Report 2019-20.pdf | - |
| Auditor's Report 2021 - 2022File: Audit & Director Report 2021-22.pdf | - |
| Auditor's Report 2020 - 2021File: Audit & Director Report 2020-21.pdf | - |
| Income Tax Return Acknowledgement 2022 - 2023File: ITR ACKNOWLEDGEMENT 2022-23.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Dharwad
Computed across the 250+ Dharwad projects on ReraGenie, from their own filings.
Keep “SHARAN RESIDENCY BLOCK C” on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dharwad250+ in Dharwad
construction of 1248 houses at Hubli
Commissioner
Akshay Town Tarihal Sector A
Suresh Enterprises Pvt.Ltd
ONE HUBLI PHASE-1
SHETTY-PATIL DEVELOPERS LLP
construction of 784 houses at Hubli
Commissioner
M/s. PRIDE IKON
M/s. PRIDE GROUP
Pourakarmikas Gruha Bhagya Yojane
Hubli Dharwad Municipal Corporation
See every Dharwad project, with the district possession charts
Builder: R R LANDMARKS PRIVATE LIMITED
R R LANDMARKS PRIVATE LIMITED has 1 registration on RERA Karnataka, including “SHARAN RESIDENCY BLOCK C”. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dharwad district page.
Frequently asked questions
What are my rights if “SHARAN RESIDENCY BLOCK C” is delayed beyond 31 Mar 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of “SHARAN RESIDENCY BLOCK C”?
The registered promoter entity is R R LANDMARKS PRIVATE LIMITED, a company as per the filing. Its CIN U45200PN2010PTC136255 and GSTIN 29AAFCR0170A1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in “SHARAN RESIDENCY BLOCK C”?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at “SHARAN RESIDENCY BLOCK C”?
The professionals named in the filing: Architect: M/S VASUDEV A PATIL & ASSOCIATES; Engineer: VASUDEV ANANTRAO PATIL; Chartered Accountant: Mukesh Mansukhlal Mehta. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in “SHARAN RESIDENCY BLOCK C”?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.