ReraGenieLog inGet a buyer report

Home / Browse projects / Vadodara, Gujarat / SHANTIKUNJ RESIDENCY 2

Valid until 30 Apr 2030 Residential/Group Housing project

SHANTIKUNJ RESIDENCY 2

By SHANTIKUNJ ENTERPRISE

RG-GJ-31266 · RERA PR/GJ/VADODARA/KARJAN/Karjan Municipality/RAA14720/230125/301229 · Last updated on GujRERA portal: 28 May 2026

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Apr 2030Possession promisedno revision filed
15 of 81Construction stages doneacross 9 buildings; furthest along: Excavation, 75%
51 of 72Units unsoldnot recorded sold or booked
Jump to the 109 documents Report an error

SHANTIKUNJ RESIDENCY 2 is a Residential/Group Housing project by SHANTIKUNJ ENTERPRISE in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/KARJAN/Karjan Municipality/RAA14720/230125/301229 on 23 Jan 2025. Possession is promised by 30 Apr 2030. 21 of the 72 units on this registration are recorded sold or booked, and 15 of 81 construction stages are filed complete.

At a glance

Project

  • NameSHANTIKUNJ RESIDENCY 2
  • TypeResidential/Group Housing
  • Location
    • SHANTIKUNJ RESIDENCY 2
    • Nr.Dhyan Vidhyalaya
    • Anastu Road
    • Nava Bazar
    • ta.karjan
    • Dist.Vadodara-391240
    • KARJAN
    • Vadodara
    • 391240
  • Pincode391240
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/KARJAN/Karjan Municipality/RAA14720/230125/301229
  • ReraGenie IDRG-GJ-31266

Builder

  • NameSHANTIKUNJ ENTERPRISE
  • Entity typePARTNERSHIP FIRM
  • Other registrations1 more →

Key dates

this monthRegisteredJan 2025PromisedApr 2030

Key facts

Registration and timeline

  • StatusValid until 30 Apr 2030
  • Registered on23 Jan 2025
  • Promised completion30 Apr 2030
  • Revised completionNone
  • Buildings9 building records
  • Documents filed109 files

Current status

29%21 of 72 units booked
29.2%Of the estimated cost spent so far

Figures as on 28 May 2026, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Type-B3---15015
Type-B2---15015
Type-C1---404
Type-B4---101
Type-C3---101
Type-C2---303
Type-A1---16016
Type-B1---101
Type-A2---16016

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building9

As on 28 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 81 construction stages are filed complete across 9 buildings. The stage furthest along is Excavation, at 75%.

Type-B336%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure47%
Internal walls, internal plaster, floorings, doors and windows within flats30%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks23%
External plumbing and external plaster, elevation, completion of terraces with waterproofing20%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Type-B238%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure54%
Internal walls, internal plaster, floorings, doors and windows within flats35%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks26%
External plumbing and external plaster, elevation, completion of terraces with waterproofing26%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Type-C117%
ActivityProgress
Excavation75%
Podiums (if any)Not applicable
Plinth75%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Type-B422%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Type-C30%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Type-C222%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Type-A135%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure56%
Internal walls, internal plaster, floorings, doors and windows within flats20%
Sanitary fittings within the flats3%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks28%
External plumbing and external plaster, elevation, completion of terraces with waterproofing5%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Type-B157%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats70%
Sanitary fittings within the flats50%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing40%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Type-A235%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure56%
Internal walls, internal plaster, floorings, doors and windows within flats20%
Sanitary fittings within the flats3%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks28%
External plumbing and external plaster, elevation, completion of terraces with waterproofing5%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%

Progress on shared amenities19

As on 28 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes0%
Water supplyYes0%
Sewerage (chamber, lines, septic tank, STP)Yes0%
Storm water drainsYes0%
Landscaping and tree plantingYes0%
Street lightingYes0%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes0%
Water conservation, rain water harvestingYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Fire fightingNoNot applicable
Drinking water facilitiesYes0%
Emergency evacuationNoNot applicable
Use of renewable energyYes0%
SecurityYes0%
Letter boxYes0%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,612 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 8.00 cr
Cost incurredRs 2.34 cr
Spent of the estimate29.25%
BuildingWingEstimatedIncurred
Type-A2NARs 2.22 crRs 71.17 lakh
Type-A1NARs 2.22 crRs 71.17 lakh
Type-B2NARs 1.18 crRs 37.86 lakh
Type-B3NARs 1.18 crRs 37.86 lakh
Type-C1NARs 51.35 lakhRs 5.13 lakh
Type-C2NARs 38.55 lakhRs 3.47 lakh
Type-C3NARs 14.37 lakh-
Type-B1NARs 7.83 lakhRs 6.51 lakh
Type-B4NARs 7.82 lakhRs 78,215

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAbhilash Ketankumar Pandya
EngineerNITIN SURESH KAPADI

Documents filed109

As listed on the registration, under the names the promoter filed them with; the newest 80 of 109 are shown. The files themselves are available at source: search the registration number PR/GJ/VADODARA/KARJAN/Karjan Municipality/RAA14720/230125/301229 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)28 May 2026
Architect's certificate (Form 1)27 May 2026
Engineer's certificate (Form 2)27 May 2026
Engineer's certificate annexure27 May 2026
Site photograph, Type-B331 Mar 2026
Site photograph, Type-B231 Mar 2026
Site photograph, Type-B231 Mar 2026
Site photograph, Type-B231 Mar 2026
Site photograph, Type-B231 Mar 2026
Site photograph, Type-B231 Mar 2026
Site photograph, Type-B231 Mar 2026
Site photograph, Type-B231 Mar 2026
Site photograph, Type-B231 Mar 2026
Site photograph, Type-B231 Mar 2026
Site photograph, Type-B231 Mar 2026
Site photograph, Type-B231 Mar 2026
Site photograph, Type-B231 Mar 2026
Site photograph, Type-B231 Mar 2026
Site photograph, Type-B231 Mar 2026
Site photograph, Type-B231 Mar 2026
Site photograph, Type-C131 Mar 2026
Site photograph, Type-C131 Mar 2026
Site photograph, Type-C131 Mar 2026
Site photograph, Type-B431 Mar 2026
Site photograph, Type-C331 Mar 2026
Site photograph, Type-C231 Mar 2026
Site photograph, Type-C231 Mar 2026
Site photograph, Type-C231 Mar 2026
Site photograph, Type-A131 Mar 2026
Site photograph, Type-A131 Mar 2026
Site photograph, Type-A131 Mar 2026
Site photograph, Type-A131 Mar 2026
Site photograph, Type-A131 Mar 2026
Site photograph, Type-A131 Mar 2026
Site photograph, Type-A131 Mar 2026
Site photograph, Type-A131 Mar 2026
Site photograph, Type-A131 Mar 2026
Site photograph, Type-A131 Mar 2026
Site photograph, Type-A131 Mar 2026
Site photograph, Type-A131 Mar 2026
Site photograph, Type-A131 Mar 2026
Site photograph, Type-A131 Mar 2026
Site photograph, Type-A131 Mar 2026
Site photograph, Type-A131 Mar 2026
Site photograph, Type-B131 Mar 2026
Site photograph, Type-B131 Mar 2026
Site photograph, Type-B131 Mar 2026
Site photograph, Type-B131 Mar 2026
Site photograph, Type-B131 Mar 2026
Site photograph, Type-B131 Mar 2026
Site photograph, Type-B131 Mar 2026
Site photograph, Type-B131 Mar 2026
Site photograph, Type-B131 Mar 2026
Site photograph, Type-B131 Mar 2026
Site photograph, Type-B131 Mar 2026
Site photograph, Type-B131 Mar 2026
Site photograph, Type-B131 Mar 2026
Site photograph, Type-B131 Mar 2026
Site photograph, Type-A231 Mar 2026
Site photograph, Type-A231 Mar 2026
Site photograph, Type-A231 Mar 2026
Site photograph, Type-A231 Mar 2026
Site photograph, Type-A231 Mar 2026
Site photograph, Type-A231 Mar 2026
Site photograph, Type-A231 Mar 2026
Site photograph, Type-A231 Mar 2026
Site photograph, Type-A231 Mar 2026
Site photograph, Type-A231 Mar 2026
Site photograph, Type-A231 Mar 2026
Site photograph, Type-A231 Mar 2026
Site photograph, Type-A231 Mar 2026
RERA registration certificate23 Jan 2025
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-

How this compares with Vadodara

29%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one has not

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep SHANTIKUNJ RESIDENCY 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near KARJAN2,900+ in Vadodara

2 kmSHANTIKUNJ RESIDENCY 2Other 33Dot size: filed unitsN

Filed coordinates, straight-line distance. 33 registered projects within 2 km.

Builder: SHANTIKUNJ ENTERPRISE

SHANTIKUNJ ENTERPRISE has 2 registrations on GujRERA, including SHANTIKUNJ RESIDENCY and SHANTIKUNJ RESIDENCY 2. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if SHANTIKUNJ RESIDENCY 2 is delayed beyond 30 Apr 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of SHANTIKUNJ RESIDENCY 2?

The registered promoter entity is SHANTIKUNJ ENTERPRISE, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in SHANTIKUNJ RESIDENCY 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SHANTIKUNJ RESIDENCY 2?

The professionals named in the filing: Architect: Abhilash Ketankumar Pandya; Engineer: NITIN SURESH KAPADI. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHANTIKUNJ RESIDENCY 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHANTIKUNJ RESIDENCY 2. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHANTIKUNJ RESIDENCY 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.