SHAMIYANA PARK

By SEJALKUMAR PANNALAL SHAH

RG-GJ-12706 · RERA PR/GJ/BHARUCH/BHARUCH/Others/MAA01113/271217 · Last updated on GujRERA portal: 13 Feb 2025

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Sep 2027Possession promisedno revision filed
367 of 468Construction stages doneacross 52 buildings; furthest along: Plinth, 0%
106 of 226Units unsoldnot recorded sold or booked
Jump to the 89 documents Report an error

SHAMIYANA PARK is a Mixed Development project by SEJALKUMAR PANNALAL SHAH in Bharuch, Gujarat, registered with GujRERA as PR/GJ/BHARUCH/BHARUCH/Others/MAA01113/271217 on 27 Dec 2017. Possession is promised by 30 Sep 2027. 120 of the 226 units on this registration are recorded sold or booked, and 367 of 468 construction stages are filed complete.

At a glance

Project

  • NameSHAMIYANA PARK
  • TypeMixed Development
  • Location
    • 326 UMARAJ
    • UMARAJ BHARUCH
    • Umraj
    • Bharuch
    • 392020
  • Pincode392020
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/BHARUCH/BHARUCH/Others/MAA01113/271217
  • ReraGenie IDRG-GJ-12706

Builder

  • NameSEJALKUMAR PANNALAL SHAH
  • Entity typeIndividual/Propritorship
  • Other registrations2 more →

Key dates

this monthRegisteredDec 2017PromisedSep 2027

Key facts

Registration and timeline

  • StatusValid until 30 Sep 2027
  • Registered on27 Dec 2017
  • Promised completion30 Sep 2027
  • Revised completionNone
  • Buildings52 building records
  • Documents filed89 files

Current status

53%120 of 226 units booked
100.0%Of the estimated cost spent so far

Figures as on 13 Feb 2025, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUNGLOW NO 10---101
BUNGLOW NO 11---101
BUNGLOW NO 12---101
BUNGLOW NO 13---101
BUNGLOW NO 14---101
BUNGLOW NO 15---101
BUNGLOW NO 16---101
BUNGLOW NO 17---101
BUNGLOW NO 18---101
BUNGLOW NO 19---101
BUNGLOW NO 20---101
BUNGLOW NO 21---101
BUNGLOW NO 22---101
BUNGLOW NO 23---101
BUNGLOW NO 24---101
BUNGLOW NO 25---101
BUNGLOW NO 26---101
BUNGLOW NO 27---101
BUNGLOW NO 28---101
BUNGLOW NO 29---101
BUNGLOW NO 30---101
BUNGLOW NO 31---101
BUNGLOW NO 32---101
BUNGLOW NO 33---101
BUNGLOW NO 34---101
BUNGLOW NO 35---101
BUNGLOW NO 36---101
BUNGLOW NO 37---101
BUNGLOW NO 38---101
BUNGLOW NO 39---101
BUNGLOW NO 40---101
BUNGLOW NO 41---101
BUNGLOW NO 42---101
BUNGLOW NO 43---101
BUNGLOW NO 44---101
BUNGLOW NO 45---101
BUNGLOW NO 46---101
BUNGLOW NO 47---101
BUNGLOW NO 48---101
BUNGLOW NO 49---101
BUNGLOW NO 50---101
TOWER A---602080
TOWER B---722496
BUNGLOW NO 1---101
BUNGLOW NO 2---101
BUNGLOW NO 3---101
BUNGLOW NO 4---101
BUNGLOW NO 5---101
BUNGLOW NO 6---101
BUNGLOW NO 7---101
BUNGLOW NO 8---101
BUNGLOW NO 9---101

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building20

As on 13 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 52 buildings; the table lists the first 20.

367 of 468 construction stages are filed complete across 52 buildings. The stage furthest along is Plinth, at 0%.

BUNGLOW NO 1078%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BUNGLOW NO 1178%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BUNGLOW NO 1278%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BUNGLOW NO 1378%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BUNGLOW NO 1478%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BUNGLOW NO 1578%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BUNGLOW NO 1678%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BUNGLOW NO 1778%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BUNGLOW NO 1878%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BUNGLOW NO 1978%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BUNGLOW NO 2078%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BUNGLOW NO 2178%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BUNGLOW NO 2278%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BUNGLOW NO 2378%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BUNGLOW NO 2478%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BUNGLOW NO 2578%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BUNGLOW NO 2678%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BUNGLOW NO 2778%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BUNGLOW NO 2878%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BUNGLOW NO 2978%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 13 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes100%
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsYes100%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes100%
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,545 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 10.57 cr
Cost incurredRs 10.57 cr
Spent of the estimate100.0%
BuildingWingEstimatedIncurred
BUNGLOW NO 1NARs 20.32 lakhRs 20.32 lakh
BUNGLOW NO 10NARs 20.32 lakhRs 20.32 lakh
BUNGLOW NO 11NARs 20.32 lakhRs 20.32 lakh
BUNGLOW NO 12NARs 20.32 lakhRs 20.32 lakh
BUNGLOW NO 13NARs 20.32 lakhRs 20.32 lakh
BUNGLOW NO 14NARs 20.32 lakhRs 20.32 lakh
BUNGLOW NO 15NARs 20.32 lakhRs 20.32 lakh
BUNGLOW NO 16NARs 20.32 lakhRs 20.32 lakh
BUNGLOW NO 17NARs 20.32 lakhRs 20.32 lakh
BUNGLOW NO 18NARs 20.32 lakhRs 20.32 lakh
BUNGLOW NO 19NARs 20.32 lakhRs 20.32 lakh
BUNGLOW NO 2NARs 20.32 lakhRs 20.32 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectASHWIN DALAL
EngineerANIL MISTRY

Documents filed89

As listed on the registration, under the names the promoter filed them with; the newest 80 of 89 are shown. The files themselves are available at source: search the registration number PR/GJ/BHARUCH/BHARUCH/Others/MAA01113/271217 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)13 Feb 2025
Architect's certificate (Form 1)6 Feb 2025
Site photograph, BUNGLOW NO 101 Feb 2025
Site photograph, BUNGLOW NO 111 Feb 2025
Site photograph, BUNGLOW NO 121 Feb 2025
Site photograph, BUNGLOW NO 131 Feb 2025
Site photograph, BUNGLOW NO 141 Feb 2025
Site photograph, BUNGLOW NO 151 Feb 2025
Site photograph, BUNGLOW NO 161 Feb 2025
Site photograph, BUNGLOW NO 171 Feb 2025
Site photograph, BUNGLOW NO 181 Feb 2025
Site photograph, BUNGLOW NO 191 Feb 2025
Site photograph, BUNGLOW NO 201 Feb 2025
Site photograph, BUNGLOW NO 211 Feb 2025
Site photograph, BUNGLOW NO 221 Feb 2025
Site photograph, BUNGLOW NO 231 Feb 2025
Site photograph, BUNGLOW NO 241 Feb 2025
Site photograph, BUNGLOW NO 251 Feb 2025
Site photograph, BUNGLOW NO 261 Feb 2025
Site photograph, BUNGLOW NO 271 Feb 2025
Site photograph, BUNGLOW NO 281 Feb 2025
Site photograph, BUNGLOW NO 291 Feb 2025
Site photograph, BUNGLOW NO 301 Feb 2025
Site photograph, BUNGLOW NO 311 Feb 2025
Site photograph, BUNGLOW NO 321 Feb 2025
Site photograph, BUNGLOW NO 331 Feb 2025
Site photograph, BUNGLOW NO 341 Feb 2025
Site photograph, BUNGLOW NO 351 Feb 2025
Site photograph, BUNGLOW NO 361 Feb 2025
Site photograph, BUNGLOW NO 371 Feb 2025
Site photograph, BUNGLOW NO 381 Feb 2025
Site photograph, BUNGLOW NO 391 Feb 2025
Site photograph, BUNGLOW NO 401 Feb 2025
Site photograph, BUNGLOW NO 411 Feb 2025
Site photograph, BUNGLOW NO 421 Feb 2025
Site photograph, BUNGLOW NO 431 Feb 2025
Site photograph, BUNGLOW NO 441 Feb 2025
Site photograph, BUNGLOW NO 451 Feb 2025
Site photograph, BUNGLOW NO 461 Feb 2025
Site photograph, BUNGLOW NO 471 Feb 2025
Site photograph, BUNGLOW NO 481 Feb 2025
Site photograph, BUNGLOW NO 491 Feb 2025
Site photograph, BUNGLOW NO 501 Feb 2025
Site photograph, TOWER A1 Feb 2025
Site photograph, TOWER B1 Feb 2025
Site photograph, BUNGLOW NO 11 Feb 2025
Site photograph, BUNGLOW NO 21 Feb 2025
Site photograph, BUNGLOW NO 31 Feb 2025
Site photograph, BUNGLOW NO 41 Feb 2025
Site photograph, BUNGLOW NO 51 Feb 2025
Site photograph, BUNGLOW NO 61 Feb 2025
Site photograph, BUNGLOW NO 71 Feb 2025
Site photograph, BUNGLOW NO 81 Feb 2025
Site photograph, BUNGLOW NO 91 Feb 2025
Engineer's certificate (Form 2)6 Mar 2024
Engineer's certificate annexure6 Mar 2024
RERA registration certificate27 Dec 2017
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-

How this compares with Bharuch

53%of this project is bookeddistrict median 52%
20%of Bharuch projects moved their completion datethis one has not

Computed across the 200+ Bharuch projects on ReraGenie, from their own filings.

Keep SHAMIYANA PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Umraj200+ in Bharuch

2 kmSHAMIYANA PARKOther 24Dot size: filed unitsN

Filed coordinates, straight-line distance. 24 registered projects within 2 km.

Builder: SEJALKUMAR PANNALAL SHAH

SEJALKUMAR PANNALAL SHAH has 3 registrations on GujRERA, including SUNDARAM RESIDENCY and SHAMIYANA PARK. Read the full track record. See more projects on the Bharuch district page.

Frequently asked questions

What are my rights if SHAMIYANA PARK is delayed beyond 30 Sep 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of SHAMIYANA PARK?

The registered promoter entity is SEJALKUMAR PANNALAL SHAH, an individual/propritorship as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in SHAMIYANA PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SHAMIYANA PARK?

The professionals named in the filing: Architect: ASHWIN DALAL; Engineer: ANIL MISTRY. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHAMIYANA PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHAMIYANA PARK. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHAMIYANA PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.