  • No red flags in this filing

Clear

  • Completion date never moved
Sep 2025Possession promisedno revision filed
313 of 351Construction stages doneacross 39 buildings; furthest along: Plinth, 0%
0 of 150Units unsoldnot recorded sold or booked
Jump to the 76 documents Report an error

SENTOSA HEIGHTS is a Mixed Development project by SENTOSA HEIGHTS in Bharuch, Gujarat, registered with GujRERA as PR/GJ/BHARUCH/BHARUCH/Others/MAA00593/061117 on 6 Nov 2017. Possession is promised by 30 Sep 2025. 150 of the 150 units on this registration are recorded sold or booked, and 313 of 351 construction stages are filed complete.

At a glance

Project

  • NameSENTOSA HEIGHTS
  • TypeMixed Development
  • Location
    • 20/2 VADADLA BHARUCH
    • VADADLA BHARUCH
    • Vadadala
    • Bharuch
    • 392001
  • Pincode392001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/BHARUCH/BHARUCH/Others/MAA00593/061117
  • ReraGenie IDRG-GJ-10966

Builder

  • NameSENTOSA HEIGHTS
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredNov 2017PromisedSep 2025

Key facts

Registration and timeline

  • StatusValid until 30 Sep 2025
  • Registered on6 Nov 2017
  • Promised completion30 Sep 2025
  • Revised completionNone
  • Buildings39 building records
  • Documents filed76 files

Current status

100%150 of 150 units booked
10.2%Of the estimated cost spent so far

Figures as on 26 Apr 2025, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING 1---8428112
Bunglow No 1---101
Bunglow No 2---101
Bunglow No 3---101
Bunglow No 4---101
Bunglow No 5---101
Bunglow No 6---101
Bunglow No 7---101
Bunglow No 8---101
Bunglow No 9---101
Bunglow No 10---101
Bunglow No 11---101
Bunglow No 12---101
Bunglow No 13---101
Bunglow No 14---101
Bunglow No 15---101
Bunglow No 16---101
Bunglow No 17---101
Bunglow No 18---101
Bunglow No 19---101
Bunglow No 20---101
Bunglow No 21---101
Bunglow No 22---101
Bunglow No 23---101
Bunglow No 24---101
Bunglow No 25---101
Bunglow No 26---101
Bunglow No 27---101
Bunglow No 28---101
Bunglow No 29---101
Bunglow No 30---101
Bunglow No 31---101
Bunglow No 32---101
Bunglow No 33---101
Bunglow No 34---101
Bunglow No 35---101
Bunglow No 36---101
Bunglow No 37---101
Bunglow No 38---101

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building20

As on 26 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 39 buildings; the table lists the first 20.

313 of 351 construction stages are filed complete across 39 buildings. The stage furthest along is Plinth, at 0%.

BUILDING 189%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Bunglow No 189%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Bunglow No 289%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Bunglow No 389%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Bunglow No 489%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Bunglow No 589%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Bunglow No 6100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Bunglow No 789%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Bunglow No 889%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Bunglow No 989%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Bunglow No 1089%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Bunglow No 1189%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Bunglow No 1289%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Bunglow No 1389%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Bunglow No 1489%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Bunglow No 1589%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Bunglow No 1689%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Bunglow No 1789%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Bunglow No 1889%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Bunglow No 1989%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 26 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes100%
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsYes0%
Treatment and disposal of sewage and sullage waterYes0%
Solid waste management and disposalYes0%
Water conservation, rain water harvestingYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityYes0%
Letter boxYes0%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,632 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 7.33 cr
Cost incurredRs 75.01 lakh
Spent of the estimate10.23%
BuildingWingEstimatedIncurred
BUILDING 1NARs 18.80 lakhRs 1.92 lakh
Bunglow No 1NARs 18.80 lakhRs 1.92 lakh
Bunglow No 2NARs 18.80 lakhRs 1.92 lakh
Bunglow No 3NARs 18.80 lakhRs 1.92 lakh
Bunglow No 4NARs 18.80 lakhRs 1.92 lakh
Bunglow No 5NARs 18.80 lakhRs 1.92 lakh
Bunglow No 6NARs 18.80 lakhRs 1.92 lakh
Bunglow No 7NARs 18.80 lakhRs 1.92 lakh
Bunglow No 8NARs 18.80 lakhRs 1.92 lakh
Bunglow No 9NARs 18.80 lakhRs 1.92 lakh
Bunglow No 10NARs 18.80 lakhRs 1.92 lakh
Bunglow No 11NARs 18.80 lakhRs 1.92 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSURESH RAJPUT
EngineerANIL MISTRY

Documents filed76

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/BHARUCH/BHARUCH/Others/MAA00593/061117 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)26 Apr 2025
Architect's certificate (Form 1)22 Mar 2025
Site photograph, BUILDING 118 Mar 2025
Site photograph, Bunglow No 118 Mar 2025
Site photograph, Bunglow No 218 Mar 2025
Site photograph, Bunglow No 318 Mar 2025
Site photograph, Bunglow No 418 Mar 2025
Site photograph, Bunglow No 518 Mar 2025
Site photograph, Bunglow No 618 Mar 2025
Site photograph, Bunglow No 718 Mar 2025
Site photograph, Bunglow No 818 Mar 2025
Site photograph, Bunglow No 918 Mar 2025
Site photograph, Bunglow No 1018 Mar 2025
Site photograph, Bunglow No 1118 Mar 2025
Site photograph, Bunglow No 1218 Mar 2025
Site photograph, Bunglow No 1318 Mar 2025
Site photograph, Bunglow No 1418 Mar 2025
Site photograph, Bunglow No 1518 Mar 2025
Site photograph, Bunglow No 1618 Mar 2025
Site photograph, Bunglow No 1718 Mar 2025
Site photograph, Bunglow No 1818 Mar 2025
Site photograph, Bunglow No 1918 Mar 2025
Site photograph, Bunglow No 2018 Mar 2025
Site photograph, Bunglow No 2118 Mar 2025
Site photograph, Bunglow No 2218 Mar 2025
Site photograph, Bunglow No 2318 Mar 2025
Site photograph, Bunglow No 2418 Mar 2025
Site photograph, Bunglow No 2518 Mar 2025
Site photograph, Bunglow No 2618 Mar 2025
Site photograph, Bunglow No 2718 Mar 2025
Site photograph, Bunglow No 2818 Mar 2025
Site photograph, Bunglow No 2918 Mar 2025
Site photograph, Bunglow No 3018 Mar 2025
Site photograph, Bunglow No 3118 Mar 2025
Site photograph, Bunglow No 3218 Mar 2025
Site photograph, Bunglow No 3318 Mar 2025
Site photograph, Bunglow No 3418 Mar 2025
Site photograph, Bunglow No 3518 Mar 2025
Site photograph, Bunglow No 3618 Mar 2025
Site photograph, Bunglow No 3718 Mar 2025
Site photograph, Bunglow No 3818 Mar 2025
Engineer's certificate (Form 2)4 Mar 2022
Engineer's certificate annexure4 Mar 2022
RERA registration certificate6 Nov 2017
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Bharuch

100%of this project is bookeddistrict median 52%
20%of Bharuch projects moved their completion datethis one has not

Computed across the 200+ Bharuch projects on ReraGenie, from their own filings.

Keep SENTOSA HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Vadadala200+ in Bharuch

2 kmSENTOSA HEIGHTSOther 30Dot size: filed unitsN

Filed coordinates, straight-line distance. 30 registered projects within 2 km.

Builder: SENTOSA HEIGHTS

SENTOSA HEIGHTS has 1 registration on GujRERA, including SENTOSA HEIGHTS. Read the full track record. See more projects on the Bharuch district page.

Frequently asked questions

What are my rights if SENTOSA HEIGHTS is delayed beyond 30 Sep 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of SENTOSA HEIGHTS?

The registered promoter entity is SENTOSA HEIGHTS, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in SENTOSA HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SENTOSA HEIGHTS?

The professionals named in the filing: Architect: SURESH RAJPUT; Engineer: ANIL MISTRY. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SENTOSA HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SENTOSA HEIGHTS. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SENTOSA HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.