ReraGenieLog inGet a buyer report

Home / Browse projects / Surat, Gujarat / SANGINI TERRAZA

Valid until 31 Oct 2020 Residential/Group Housing project

SANGINI TERRAZA

By VEE AAR LIFE SPACE LLP

RG-GJ-98017 · RERA PR/GJ/SURAT/SURAT CITY/SUDA/RAA00106/A1R/EX1/180919 · Last updated on GujRERA portal: 30 Sep 2020

Source: official GujRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Separate project account declared
Oct 2020Possession promisedmoved 12 months from the original
18 of 18Construction stages doneacross 2 buildings; every applicable stage filed complete
10 of 46Units unsoldnot recorded sold or booked
Jump to the 49 documents Report an error

SANGINI TERRAZA is a Residential/Group Housing project by VEE AAR LIFE SPACE LLP in Surat, Gujarat, registered with GujRERA as PR/GJ/SURAT/SURAT CITY/SUDA/RAA00106/A1R/EX1/180919 on 8 Sep 2017. Possession is promised by 31 Oct 2020. The completion date has moved by 12 months from the original filing. 36 of the 46 units on this registration are recorded sold or booked, and 18 of 18 construction stages are filed complete.

At a glance

Project

  • NameSANGINI TERRAZA
  • TypeResidential/Group Housing
  • Location
    • F.P.71
    • T.P.5 ( VESU-BHIMRAD)
    • CANAL ROAD
    • VESU
    • SURAT
    • Vesu
    • Surat City
    • Surat
    • 395007
  • Pincode395007
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/SURAT/SURAT CITY/SUDA/RAA00106/A1R/EX1/180919
  • ReraGenie IDRG-GJ-98017

Builder

  • NameVEE AAR LIFE SPACE LLP
  • Entity typeLIMITED LIABILITY PARTNERSHIP FIRM
  • Other registrations8 more →

Key dates

this monthRegisteredSep 2017First promiseOct 2019Revised toOct 2020

Key facts

Registration and timeline

  • StatusValid until 31 Oct 2020
  • Registered on8 Sep 2017
  • Promised completion31 Oct 2020
  • Revised completionRevised to 31 Oct 2020 (originally 31 Oct 2019)
  • Buildings2 building records
  • Documents filed49 files

Current status

78%36 of 46 units booked
104.0%Of the estimated cost spent so far

Figures as on 30 Sep 2020, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---23023
B---23023

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building2

As on 30 Sep 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 18 construction stages are filed complete across 2 buildings.

A100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
B100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 30 Sep 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes100%
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsYes100%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityYes100%
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,092 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 20.62 cr
Cost incurredRs 21.45 cr
Spent of the estimate104.0%
BuildingWingEstimatedIncurred
ANARs 10.31 crRs 10.72 cr
BNARs 10.31 crRs 10.72 cr

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/SURAT/SURAT CITY/SUDA/RAA00106/A1R/EX1/180919Applied Aug 2019; approved Sep 2019

Documents filed49

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/SURAT/SURAT CITY/SUDA/RAA00106/A1R/EX1/180919 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)30 Sep 2020
Architect's certificate (Form 1)28 Sep 2020
Engineer's certificate (Form 2)28 Sep 2020
Engineer's certificate annexure28 Sep 2020
Site photograph, A28 Sep 2020
Site photograph, A28 Sep 2020
Site photograph, A28 Sep 2020
Site photograph, A28 Sep 2020
Site photograph, A28 Sep 2020
Site photograph, A28 Sep 2020
Site photograph, B28 Sep 2020
Site photograph, B28 Sep 2020
Site photograph, B28 Sep 2020
Site photograph, B28 Sep 2020
Site photograph, B28 Sep 2020
Site photograph, B28 Sep 2020
RERA registration certificate8 Sep 2017
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Surat

78%of this project is bookeddistrict median 39%
15%of Surat projects moved their completion datethis one moved by 12 months

Computed across the 2,600+ Surat projects on ReraGenie, from their own filings.

Keep SANGINI TERRAZA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Vesu2,600+ in Surat

2 kmSANGINI TERRAZAOther 230Dot size: filed unitsN

Filed coordinates, straight-line distance. 230 registered projects within 2 km.

Builder: VEE AAR LIFE SPACE LLP

VEE AAR LIFE SPACE LLP has 9 registrations on GujRERA, including SANGINI TERRAZA and SANGINI ARISE. Read the full track record. See more projects on the Surat district page.

Frequently asked questions

What are my rights if SANGINI TERRAZA is delayed beyond 31 Oct 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of SANGINI TERRAZA?

The registered promoter entity is VEE AAR LIFE SPACE LLP, a limited liability partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in SANGINI TERRAZA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in SANGINI TERRAZA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SANGINI TERRAZA. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SANGINI TERRAZA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.