Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Apr 2029Possession promisedno revision filed
44 of 54Construction stages doneacross 6 buildings; furthest along: Internal walls, 90%
21 of 55Units unsoldnot recorded sold or booked
Jump to the 30 documents Report an error

SAMRUDDHI TENAMENTS is a Residential/Group Housing project by SHREE RANG DEVELOPERS in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/KARJAN/Karjan Municipality/RAA13641/100624/311228 on 10 Jun 2024. Possession is promised by 30 Apr 2029. 34 of the 55 units on this registration are recorded sold or booked, and 44 of 54 construction stages are filed complete.

At a glance

Project

  • NameSAMRUDDHI TENAMENTS
  • TypeResidential/Group Housing
  • Location
    • SAMRUDDHI TENAMENTS
    • BEHIND PRAMUKHRAJ
    • ANASTU ROAD
    • KARJAN
    • KARJAN
    • Vadodara
    • 391240
  • Pincode391240
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/KARJAN/Karjan Municipality/RAA13641/100624/311228
  • ReraGenie IDRG-GJ-97572

Builder

  • NameSHREE RANG DEVELOPERS
  • Entity typePARTNERSHIP FIRM
  • Other registrations2 more →

Key dates

this monthRegisteredJun 2024PromisedApr 2029

Key facts

Registration and timeline

  • StatusValid until 30 Apr 2029
  • Registered on10 Jun 2024
  • Promised completion30 Apr 2029
  • Revised completionNone
  • Buildings6 building records
  • Documents filed30 files

Current status

62%34 of 55 units booked
89.4%Of the estimated cost spent so far

Figures as on 19 May 2026, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TYPE-B(1)---20020
TYPE-A(1)---707
TYPE-B(2)---20020
TYPE-A(2)---606
TYPE-D---101
TYPE-C---101

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building6

As on 19 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

44 of 54 construction stages are filed complete across 6 buildings. The stage furthest along is Internal walls, at 90%.

TYPE-B(1)87%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats90%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing90%
TYPE-A(1)89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
TYPE-B(2)87%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats90%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing90%
TYPE-A(2)89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
TYPE-D89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
TYPE-C89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 19 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes75%
Sewerage (chamber, lines, septic tank, STP)Yes75%
Storm water drainsYes70%
Landscaping and tree plantingYes100%
Street lightingYes60%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes0%
Water conservation, rain water harvestingYes50%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes60%
Fire fightingYes0%
Drinking water facilitiesYes20%
Emergency evacuationNoNot applicable
Use of renewable energyYes0%
SecurityYes0%
Letter boxYes20%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,689 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 3.30 cr
Cost incurredRs 2.95 cr
Spent of the estimate89.44%
BuildingWingEstimatedIncurred
TYPE-B(1)NARs 1.10 crRs 96.78 lakh
TYPE-B(2)NARs 1.10 crRs 97.10 lakh
TYPE-A(1)NARs 52.44 lakhRs 48.04 lakh
TYPE-A(2)NARs 44.95 lakhRs 40.56 lakh
TYPE-CNARs 6.66 lakhRs 6.66 lakh
TYPE-DNARs 6.01 lakhRs 6.01 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDHARMIK Harishbhai Chauhan
EngineerNIRMAL PRAVINBHAI RAJPUT

Documents filed30

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/KARJAN/Karjan Municipality/RAA13641/100624/311228 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)19 May 2026
Architect's certificate (Form 1)18 May 2026
Engineer's certificate (Form 2)18 May 2026
Engineer's certificate annexure18 May 2026
Site photograph, TYPE-B(1)20 Mar 2026
Site photograph, TYPE-A(1)20 Mar 2026
Site photograph, TYPE-B(2)20 Mar 2026
Site photograph, TYPE-A(2)20 Mar 2026
Site photograph, TYPE-D20 Mar 2026
Site photograph, TYPE-C20 Mar 2026
RERA registration certificate10 Jun 2024
Proforma agreement for sale-
Project specific document-
Drainage affidavit-
Approved sanctioned plan-
Approved layout plan-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Declaration in Form B-
Approved building or plotting plan-
NOCs from authorities-
Title clearance certificate-
Title report-
Property card-
Statutory document-
Project photograph-
Proforma sale deed-

How this compares with Vadodara

62%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one has not

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep SAMRUDDHI TENAMENTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near KARJAN2,900+ in Vadodara

2 kmSAMRUDDHI TENAMENTSOther 36Dot size: filed unitsN

Filed coordinates, straight-line distance. 36 registered projects within 2 km.

Builder: SHREE RANG DEVELOPERS

Shree Rang Developers has 3 registrations on GujRERA, including Shree Rang Nagar & Mall and SHREE RANG VATIKA. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if SAMRUDDHI TENAMENTS is delayed beyond 30 Apr 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of SAMRUDDHI TENAMENTS?

The registered promoter entity is SHREE RANG DEVELOPERS, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in SAMRUDDHI TENAMENTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SAMRUDDHI TENAMENTS?

The professionals named in the filing: Architect: DHARMIK Harishbhai Chauhan; Engineer: NIRMAL PRAVINBHAI RAJPUT. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAMRUDDHI TENAMENTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAMRUDDHI TENAMENTS. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAMRUDDHI TENAMENTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.