Home / Browse projects / Bharuch, Gujarat / ROYAL PARARDISE

Valid until 30 Jun 2024 Residential/Group Housing project

ROYAL PARARDISE

By YOGI INFRASTRUCTURE

RG-GJ-67609 · RERA PR/GJ/BHARUCH/AMOD/Others/RAA03073/030718 · Last updated on GujRERA portal: 13 Mar 2023

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
  • Separate project account declared
Jun 2024Possession promisedno revision filed
2 of 24Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 70%
128 of 168Units unsoldnot recorded sold or booked
Jump to the 44 documents Report an error

ROYAL PARARDISE is a Residential/Group Housing project by YOGI INFRASTRUCTURE in Bharuch, Gujarat, registered with GujRERA as PR/GJ/BHARUCH/AMOD/Others/RAA03073/030718 on 3 Jul 2018. Possession is promised by 30 Jun 2024. 40 of the 168 units on this registration are recorded sold or booked, and 2 of 24 construction stages are filed complete.

At a glance

Project

  • NameROYAL PARARDISE
  • TypeResidential/Group Housing
  • Location
    • ROYAL PARADISE
    • SURVEY NO. 491/1/2
    • 507/2
    • AACHHOD ROAD
    • AMOD
    • Amod
    • Bharuch
    • 392110
  • Pincode392110
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/BHARUCH/AMOD/Others/RAA03073/030718
  • ReraGenie IDRG-GJ-67609

Builder

  • NameYOGI INFRASTRUCTURE
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredJul 2018PromisedJun 2024

Key facts

Registration and timeline

  • StatusValid until 30 Jun 2024
  • Registered on3 Jul 2018
  • Promised completion30 Jun 2024
  • Revised completionNone
  • Buildings3 building records
  • Documents filed44 files

Current status

24%40 of 168 units booked
21.4%Of the estimated cost spent so far

Figures as on 13 Mar 2023, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---62062
B---75075
C---31031

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building3

As on 13 Mar 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 24 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 70%.

A34%
ActivityProgress
Excavation47%
Podiums (if any)Not applicable
Plinth47%
Stilt FloorNot applicable
Slabs of Super Structure32%
Internal walls, internal plaster, floorings, doors and windows within flats30%
Sanitary fittings within the flats30%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing30%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing26%
B4%
ActivityProgress
Excavation4%
Podiums (if any)Not applicable
Plinth4%
Stilt FloorNot applicable
Slabs of Super Structure4%
Internal walls, internal plaster, floorings, doors and windows within flats4%
Sanitary fittings within the flats4%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks4%
External plumbing and external plaster, elevation, completion of terraces with waterproofing4%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing4%
C76%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure70%
Internal walls, internal plaster, floorings, doors and windows within flats70%
Sanitary fittings within the flats62%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing67%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing67%

Progress on shared amenities19

As on 13 Mar 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes40%
Water supplyYes0%
Sewerage (chamber, lines, septic tank, STP)Yes0%
Storm water drainsNoNot applicable
Landscaping and tree plantingYes5%
Street lightingYes0%
Community buildingsYes0%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area20,000 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 7.12 cr
Cost incurredRs 1.52 cr
Spent of the estimate21.4%
BuildingWingEstimatedIncurred
ANARs 2.38 crRs 50.82 lakh
BNARs 2.38 crRs 50.82 lakh
CNARs 2.38 crRs 50.82 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSPACE PLUS - AR. KIRAN PATEL
EngineerNANDKISHORE HARIRAMANI

Documents filed44

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/BHARUCH/AMOD/Others/RAA03073/030718 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)13 Mar 2023
Engineer's certificate (Form 2)13 Mar 2023
Engineer's certificate annexure13 Mar 2023
Accountant's certificate (Form 3)13 Mar 2023
Site photograph, A13 Mar 2023
Site photograph, A13 Mar 2023
Site photograph, A13 Mar 2023
Site photograph, A13 Mar 2023
Site photograph, A13 Mar 2023
Site photograph, B13 Mar 2023
Site photograph, C13 Mar 2023
RERA registration certificate3 Jul 2018
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Bharuch

24%of this project is bookeddistrict median 52%
20%of Bharuch projects moved their completion datethis one has not

Computed across the 200+ Bharuch projects on ReraGenie, from their own filings.

Keep ROYAL PARARDISE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Amod200+ in Bharuch

Builder: YOGI INFRASTRUCTURE

YOGI INFRASTRUCTURE has 1 registration on GujRERA, including ROYAL PARARDISE. Read the full track record. See more projects on the Bharuch district page.

Frequently asked questions

What are my rights if ROYAL PARARDISE is delayed beyond 30 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of ROYAL PARARDISE?

The registered promoter entity is YOGI INFRASTRUCTURE, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in ROYAL PARARDISE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at ROYAL PARARDISE?

The professionals named in the filing: Architect: SPACE PLUS - AR. KIRAN PATEL; Engineer: NANDKISHORE HARIRAMANI. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ROYAL PARARDISE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ROYAL PARARDISE. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ROYAL PARARDISE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.