Valid until 30 Apr 2030 Residential/Group Housing project

RIVIERA PALACIO

By SAFAL GOYAL REALTY LLP

RG-GJ-87479 · RERA PR/GJ/AHMEDABAD/SANAND/AUDA/RAA12709/161123 · Last updated on GujRERA portal: 31 Jan 2026

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Apr 2030Possession promisedno revision filed
2 of 9Construction stages donefurthest along: Slabs of Super Structure, 60%
75 of 140Units unsoldnot recorded sold or booked
Jump to the 41 documents Report an error

RIVIERA PALACIO is a Residential/Group Housing project by SAFAL GOYAL REALTY LLP in Ahmedabad, Gujarat, registered with GujRERA as PR/GJ/AHMEDABAD/SANAND/AUDA/RAA12709/161123 on 16 Nov 2023. Possession is promised by 30 Apr 2030. 65 of the 140 units on this registration are recorded sold or booked, and 2 of 9 construction stages are filed complete.

At a glance

Project

  • NameRIVIERA PALACIO
  • TypeResidential/Group Housing
  • Location
    • SKYCITY
    • NEAR CLUB 07
    • S.P.RING ROAD
    • BLOCK NOS.215
    • 251
    • 305
    • 306
    • F.P NO. 21
    • TP SCHME NO . 1(SHELA)
    • Sanand
    • Ahmedabad
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/AHMEDABAD/SANAND/AUDA/RAA12709/161123
  • ReraGenie IDRG-GJ-87479

Builder

  • NameSAFAL GOYAL REALTY LLP
  • Entity typeLIMITED LIABILITY PARTNERSHIP FIRM
  • Other registrations15 more →

Key dates

this monthRegisteredNov 2023PromisedApr 2030

Key facts

Registration and timeline

  • StatusValid until 30 Apr 2030
  • Registered on16 Nov 2023
  • Promised completion30 Apr 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed41 files

Current status

46%65 of 140 units booked
56.7%Of the estimated cost spent so far

Figures as on 31 Jan 2026, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Z11---1400140

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building1

As on 31 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 9 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 60%.

Z11: 43% average across the applicable activities

ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure60%
Internal walls, internal plaster, floorings, doors and windows within flats50%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing25%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%

Progress on shared amenities19

As on 31 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes0%
Water supplyYes0%
Sewerage (chamber, lines, septic tank, STP)Yes0%
Storm water drainsYes0%
Landscaping and tree plantingYes0%
Street lightingYes0%
Community buildingsYes0%
Treatment and disposal of sewage and sullage waterYes0%
Solid waste management and disposalYes0%
Water conservation, rain water harvestingYes0%
Energy managementYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Fire fightingYes0%
Drinking water facilitiesYes0%
Emergency evacuationYes0%
Use of renewable energyYes0%
SecurityYes0%
Letter boxYes0%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,138 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 258.52 cr
Cost incurredRs 146.53 cr
Spent of the estimate56.68%
BuildingWingEstimatedIncurred
Z11NARs 258.52 crRs 146.53 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAPURVA AMIN ARCHITECT
EngineerN K SHAH CONSULTING ENGINEERS LLP

Documents filed41

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/AHMEDABAD/SANAND/AUDA/RAA12709/161123 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)31 Jan 2026
Engineer's certificate (Form 2)31 Jan 2026
Engineer's certificate annexure31 Jan 2026
Accountant's certificate (Form 3)31 Jan 2026
Site photograph, Z1131 Jan 2026
RERA registration certificate16 Nov 2023
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Ahmedabad

46%of this project is bookeddistrict median 53%
14%of Ahmedabad projects moved their completion datethis one has not

Computed across the 5,400+ Ahmedabad projects on ReraGenie, from their own filings.

Keep RIVIERA PALACIO on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Ahmedabad5,400+ in Ahmedabad

2 kmRIVIERA PALACIOOther 195Dot size: filed unitsN

Filed coordinates, straight-line distance. 195 registered projects within 2 km.

Builder: SAFAL GOYAL REALTY LLP

SAFAL GOYAL REALTY LLP has 16 registrations on GujRERA, including VERNIS VILLA and FLORIS VILLA. Read the full track record. See more projects on the Ahmedabad district page.

Frequently asked questions

What are my rights if RIVIERA PALACIO is delayed beyond 30 Apr 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of RIVIERA PALACIO?

The registered promoter entity is SAFAL GOYAL REALTY LLP, a limited liability partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in RIVIERA PALACIO?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at RIVIERA PALACIO?

The professionals named in the filing: Architect: APURVA AMIN ARCHITECT; Engineer: N K SHAH CONSULTING ENGINEERS LLP. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RIVIERA PALACIO?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RIVIERA PALACIO. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RIVIERA PALACIO to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.