Home / Browse projects / Vadodara, Gujarat / REVA CLUBLIFE

Valid until 30 Apr 2029 Residential/Group Housing project

REVA CLUBLIFE

By ASPIRE ELITE

RG-GJ-52920 · RERA PR/GJ/VADODARA/VADODARA/Vadodara Urban Development Authority/RAA13101/070324/311228 · Last updated on GujRERA portal: 9 Sep 2024

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Apr 2029Possession promisedno revision filed
1 of 27Construction stages doneacross 3 buildings; furthest along: Excavation, 96%
36 of 52Units unsoldnot recorded sold or booked
Jump to the 36 documents Report an error

REVA CLUBLIFE is a Residential/Group Housing project by ASPIRE ELITE in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Vadodara Urban Development Authority/RAA13101/070324/311228 on 7 Mar 2024. Possession is promised by 30 Apr 2029. 16 of the 52 units on this registration are recorded sold or booked, and 1 of 27 construction stages are filed complete.

At a glance

Project

  • NameREVA CLUBLIFE
  • TypeResidential/Group Housing
  • Location
    • TP 28/C
    • FP 7
    • 8
    • 9
    • Sikandarpura
    • Waghodia Road
    • SIKANDARPURA
    • Vadodara
    • 390019
  • Pincode390019
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Vadodara Urban Development Authority/RAA13101/070324/311228
  • ReraGenie IDRG-GJ-52920

Builder

  • NameASPIRE ELITE
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredMar 2024PromisedApr 2029

Key facts

Registration and timeline

  • StatusValid until 30 Apr 2029
  • Registered on7 Mar 2024
  • Promised completion30 Apr 2029
  • Revised completionNone
  • Buildings3 building records
  • Documents filed36 files

Current status

31%16 of 52 units booked
29.9%Of the estimated cost spent so far

Figures as on 9 Sep 2024, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---25025
P 01---101
A MIRROR---26026

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building3

As on 9 Sep 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 27 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 96%.

A40%
ActivityProgress
Excavation96%
Podiums (if any)Not applicable
Plinth68%
Stilt Floor24%
Slabs of Super Structure50%
Internal walls, internal plaster, floorings, doors and windows within flats72%
Sanitary fittings within the flats8%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks28%
External plumbing and external plaster, elevation, completion of terraces with waterproofing4%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing8%
P 0111%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
A MIRROR32%
ActivityProgress
Excavation96%
Podiums (if any)Not applicable
Plinth64%
Stilt Floor4%
Slabs of Super Structure46%
Internal walls, internal plaster, floorings, doors and windows within flats29%
Sanitary fittings within the flats4%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks38%
External plumbing and external plaster, elevation, completion of terraces with waterproofing4%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing4%

Progress on shared amenities23

As on 9 Sep 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes0%
Water supplyYes0%
Sewerage (chamber, lines, septic tank, STP)Yes0%
Storm water drainsYes0%
Landscaping and tree plantingYes0%
Street lightingYes0%
Community buildingsYes0%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Fire fightingNoNot applicable
Drinking water facilitiesYes0%
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityYes0%
Letter boxNoNot applicable
Compound wallYes0%
Plinth protectionYes0%
Water tankYes0%
Other requirementsYes0%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area15,561 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 15.94 cr
Cost incurredRs 4.77 cr
Spent of the estimate29.91%
BuildingWingEstimatedIncurred
A MIRRORNARs 7.91 crRs 2.34 cr
ANARs 7.65 crRs 2.43 cr
P 01NARs 38.00 lakh-

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKirankumar Rasikbhai Ramjiyani
EngineerHARDIKKUMAR NARENDRABHAI PATEL

Documents filed36

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Vadodara Urban Development Authority/RAA13101/070324/311228 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer's certificate (Form 2)9 Sep 2024
Engineer's certificate annexure9 Sep 2024
RERA registration certificate7 Mar 2024
Proforma agreement for sale-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Drainage affidavit-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Approved sanctioned plan-
Approved layout plan-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Declaration in Form B-
Declaration in Form B1-
Declaration in Form B2-
Approved building or plotting plan-
NOCs from authorities-
Title clearance certificate-
Title report-
Property card-
Statutory document-
Project photograph-
Proforma sale deed-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Vadodara

31%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one has not

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep REVA CLUBLIFE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near SIKANDARPURA2,900+ in Vadodara

2 kmREVA CLUBLIFEOther 45Dot size: filed unitsN

Filed coordinates, straight-line distance. 45 registered projects within 2 km.

Builder: ASPIRE ELITE

ASPIRE ELITE has 1 registration on GujRERA, including REVA CLUBLIFE. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if REVA CLUBLIFE is delayed beyond 30 Apr 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of REVA CLUBLIFE?

The registered promoter entity is ASPIRE ELITE, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in REVA CLUBLIFE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at REVA CLUBLIFE?

The professionals named in the filing: Architect: Kirankumar Rasikbhai Ramjiyani; Engineer: HARDIKKUMAR NARENDRABHAI PATEL. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in REVA CLUBLIFE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About REVA CLUBLIFE. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save REVA CLUBLIFE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.