ReraGenieLog inGet a buyer report

Home / Browse projects / Surat, Gujarat / RAGHUVIR SHERON

Valid until 30 Apr 2028 Residential/Group Housing project

RAGHUVIR SHERON

By RAGHUVIR CORPORATION

RG-GJ-30247 · RERA PR/GJ/SURAT/SURAT CITY/Surat Municipal Corporation/RN198AA10098/A1R/200323 · Last updated on GujRERA portal: 7 Aug 2023

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Apr 2028Possession promisedno revision filed
23 of 103Construction stages doneacross 11 buildings; furthest along: Plinth, 60%
485 of 490Units unsoldnot recorded sold or booked
Jump to the 38 documents Report an error

RAGHUVIR SHERON is a Residential/Group Housing project by RAGHUVIR CORPORATION in Surat, Gujarat, registered with GujRERA as PR/GJ/SURAT/SURAT CITY/Surat Municipal Corporation/RN198AA10098/A1R/200323 on 22 Sep 2022. Possession is promised by 30 Apr 2028. 5 of the 490 units on this registration are recorded sold or booked, and 23 of 103 construction stages are filed complete.

At a glance

Project

  • NameRAGHUVIR SHERON
  • TypeResidential/Group Housing
  • Location
    • BLOCK NO 128 TO 145 PAIKY SUB PLOT No. (5+6+7)/C
    • TALUKA : MAJURA
    • MOJE : SARASANA
    • SARSANA
    • Surat City
    • Surat
    • 395007
  • Pincode395007
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/SURAT/SURAT CITY/Surat Municipal Corporation/RN198AA10098/A1R/200323
  • ReraGenie IDRG-GJ-30247

Builder

  • NameRAGHUVIR CORPORATION
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredSep 2022PromisedApr 2028

Key facts

Registration and timeline

  • StatusValid until 30 Apr 2028
  • Registered on22 Sep 2022
  • Promised completion30 Apr 2028
  • Revised completionNone
  • Buildings11 building records
  • Documents filed38 files

Current status

1%5 of 490 units booked
11.4%Of the estimated cost spent so far

Figures as on 7 Aug 2023, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
LM---1040104
AB---1040104
C---50050
D---26026
E---26026
F---26026
G---26026
H---26026
I---26026
J---26026
K---50050

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building11

As on 7 Aug 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

23 of 103 construction stages are filed complete across 11 buildings. The stage furthest along is Plinth, at 60%.

LM23%
ActivityProgress
Excavation100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure29%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
AB26%
ActivityProgress
Excavation100%
Podiums (if any)20%
Plinth100%
Stilt Floor0%
Slabs of Super Structure36%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
C23%
ActivityProgress
Excavation100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure29%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
D39%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats38%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
E38%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor8%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats15%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
F40%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor4%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats38%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
G24%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth50%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, internal plaster, floorings, doors and windows within flats15%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
H28%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure36%
Internal walls, internal plaster, floorings, doors and windows within flats8%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks8%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
I23%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth60%
Stilt Floor0%
Slabs of Super Structure36%
Internal walls, internal plaster, floorings, doors and windows within flats8%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks8%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
J25%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure29%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
K23%
ActivityProgress
Excavation100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure29%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%

Progress on shared amenities23

As on 7 Aug 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes0%
Water supplyYes0%
Sewerage (chamber, lines, septic tank, STP)Yes0%
Storm water drainsYes0%
Landscaping and tree plantingYes0%
Street lightingYes0%
Community buildingsYes0%
Treatment and disposal of sewage and sullage waterYes0%
Solid waste management and disposalYes0%
Water conservation, rain water harvestingYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Fire fightingYes0%
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable
Compound wallYes0%
Plinth protectionYes0%
Water tankYes0%
Other requirementsYes0%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area15,906 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 133.84 cr
Cost incurredRs 15.26 cr
Spent of the estimate11.4%
BuildingWingEstimatedIncurred
ABNARs 20.59 crRs 75.50 lakh
LMNARs 20.59 crRs 50.00 lakh
CNARs 10.29 crRs 35.60 lakh
DNARs 10.29 crRs 2.25 cr
ENARs 10.29 crRs 1.95 cr
FNARs 10.29 crRs 1.95 cr
GNARs 10.29 crRs 1.95 cr
HNARs 10.29 crRs 1.95 cr
INARs 10.29 crRs 1.90 cr
JNARs 10.29 crRs 1.20 cr
KNARs 10.29 crRs 50.00 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBhavdip Vallabhbhai Hirani
EngineerPRATIK SHIVLAL PONKIA

Documents filed38

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/SURAT/SURAT CITY/Surat Municipal Corporation/RN198AA10098/A1R/200323 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer's certificate (Form 2)7 Aug 2023
Engineer's certificate annexure7 Aug 2023
RERA registration certificate22 Sep 2022
Alteration certificate-
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Approved sanctioned plan-
Approved layout plan-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Declaration in Form B-
Approved building or plotting plan-
Title clearance certificate-
Title report-
Property card-
Proforma sale deed-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Surat

1%of this project is bookeddistrict median 39%
15%of Surat projects moved their completion datethis one has not

Computed across the 2,600+ Surat projects on ReraGenie, from their own filings.

Keep RAGHUVIR SHERON on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near SARSANA2,600+ in Surat

2 kmRAGHUVIR SHERONOther 76Dot size: filed unitsN

Filed coordinates, straight-line distance. 76 registered projects within 2 km.

Builder: RAGHUVIR CORPORATION

RAGHUVIR CORPORATION has 1 registration on GujRERA, including RAGHUVIR SHERON. Read the full track record. See more projects on the Surat district page.

Frequently asked questions

What are my rights if RAGHUVIR SHERON is delayed beyond 30 Apr 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of RAGHUVIR SHERON?

The registered promoter entity is RAGHUVIR CORPORATION, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in RAGHUVIR SHERON?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at RAGHUVIR SHERON?

The professionals named in the filing: Architect: Bhavdip Vallabhbhai Hirani; Engineer: PRATIK SHIVLAL PONKIA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RAGHUVIR SHERON?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RAGHUVIR SHERON. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RAGHUVIR SHERON to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.