ReraGenieLog inGet a buyer report

Home / Browse projects / Vadodara, Gujarat / RAAMA ELINA AND RAAMA ESQUIRE

Valid until 30 Sep 2021 Mixed Development project

RAAMA ELINA AND RAAMA ESQUIRE

By Raama Realcon

RG-GJ-84940 · RERA PR/GJ/VADODARA/VADODARA/Others/MAA03367/A1M/100619 · Last updated on GujRERA portal: 30 Jun 2021

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
  • Separate project account declared
Sep 2021Possession promisedno revision filed
23 of 24Construction stages doneacross 3 buildings; furthest along: Plinth, 0%
81 of 262Units unsoldnot recorded sold or booked
Jump to the 40 documents Report an error

RAAMA ELINA AND RAAMA ESQUIRE is a Mixed Development project by Raama Realcon in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Others/MAA03367/A1M/100619 on 5 Sep 2018. Possession is promised by 30 Sep 2021. 181 of the 262 units on this registration are recorded sold or booked, and 23 of 24 construction stages are filed complete.

At a glance

Project

  • NameRAAMA ELINA AND RAAMA ESQUIRE
  • TypeMixed Development
  • Location
    • Besides Tithi Heights
    • Nr Old Octroi Post
    • Gotri
    • Vadodara
    • Gotri
    • Vadodara
    • 390021
  • Pincode390021
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Others/MAA03367/A1M/100619
  • ReraGenie IDRG-GJ-84940

Builder

  • NameRaama Realcon
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredSep 2018PromisedSep 2021

Key facts

Registration and timeline

  • StatusValid until 30 Sep 2021
  • Registered on5 Sep 2018
  • Promised completion30 Sep 2021
  • Revised completionNone
  • Buildings3 building records
  • Documents filed40 files

Current status

69%181 of 262 units booked
101.1%Of the estimated cost spent so far

Figures as on 30 Jun 2021, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower A---48048
Tower B---36036
Tower D---0178178

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building3

As on 30 Jun 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

23 of 24 construction stages are filed complete across 3 buildings. The stage furthest along is Plinth, at 0%.

Tower A100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Tower B88%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Tower D100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 30 Jun 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsNoNot applicable
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsYes100%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingYes100%
Drinking water facilitiesYes100%
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityYes100%
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,901 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 16.50 cr
Cost incurredRs 16.68 cr
Spent of the estimate101.09%
BuildingWingEstimatedIncurred
Tower ANARs 5.50 crRs 5.56 cr
Tower BNARs 5.50 crRs 5.56 cr
Tower DNARs 5.50 crRs 5.56 cr

Documents filed40

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Others/MAA03367/A1M/100619 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)30 Jun 2021
Engineer's certificate (Form 2)30 Jun 2021
Engineer's certificate annexure30 Jun 2021
Accountant's certificate (Form 3)30 Jun 2021
Site photograph, Tower A30 Jun 2021
Site photograph, Tower B30 Jun 2021
Site photograph, Tower D30 Jun 2021
RERA registration certificate5 Sep 2018
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Vadodara

69%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one has not

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep RAAMA ELINA AND RAAMA ESQUIRE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Gotri2,900+ in Vadodara

2 kmRAAMA ELINA AND RAAMA ESOther 263Dot size: filed unitsN

Filed coordinates, straight-line distance. 263 registered projects within 2 km.

Builder: Raama Realcon

Raama Realcon has 1 registration on GujRERA, including RAAMA ELINA AND RAAMA ESQUIRE. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if RAAMA ELINA AND RAAMA ESQUIRE is delayed beyond 30 Sep 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of RAAMA ELINA AND RAAMA ESQUIRE?

The registered promoter entity is Raama Realcon, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in RAAMA ELINA AND RAAMA ESQUIRE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in RAAMA ELINA AND RAAMA ESQUIRE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RAAMA ELINA AND RAAMA ESQUIRE. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RAAMA ELINA AND RAAMA ESQUIRE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.