Home / Browse projects / Vadodara, Gujarat / PANCHAMRUT RESIDENCY

Valid until 31 Jan 2022 Mixed Development project

PANCHAMRUT RESIDENCY

By JAY AMBE DEVELOPERS

RG-GJ-64792 · RERA PR/GJ/VADODARA/VADODARA/Others/MAA04323/EX1/240122 · Last updated on GujRERA portal: 27 Aug 2021

Source: official GujRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Separate project account declared
Jan 2022Possession promisedmoved 12 months from the original
30 of 41Construction stages doneacross 5 buildings; furthest along: Sanitary fittings within the flats, 90%
81 of 122Units unsoldnot recorded sold or booked
Jump to the 42 documents Report an error

PANCHAMRUT RESIDENCY is a Mixed Development project by JAY AMBE DEVELOPERS in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Others/MAA04323/EX1/240122 on 12 Dec 2018. Possession is promised by 31 Jan 2022. The completion date has moved by 12 months from the original filing. 41 of the 122 units on this registration are recorded sold or booked, and 30 of 41 construction stages are filed complete.

At a glance

Project

  • NamePANCHAMRUT RESIDENCY
  • TypeMixed Development
  • Location
    • NEAR SIDDHARTH BUNGLOWS
    • B/H SHRAVAN GREEN
    • AMIT NAGAR-SAMA ROAD
    • Harni
    • Vadodara
    • 390022
  • Pincode390022
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Others/MAA04323/EX1/240122
  • ReraGenie IDRG-GJ-64792

Builder

  • NameJAY AMBE DEVELOPERS
  • Entity typePARTNERSHIP FIRM
  • Other registrations6 more →

Key dates

this monthRegisteredDec 2018First promiseJan 2021Revised toJan 2022

Key facts

Registration and timeline

  • StatusValid until 31 Jan 2022
  • Registered on12 Dec 2018
  • Promised completion31 Jan 2022
  • Revised completionRevised to 31 Jan 2022 (originally 31 Jan 2021)
  • Buildings5 building records
  • Documents filed42 files

Current status

34%41 of 122 units booked
76.6%Of the estimated cost spent so far

Figures as on 27 Aug 2021, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---40040
I---20020
J---20020
K---20020
L---02222

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building5

As on 27 Aug 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

30 of 41 construction stages are filed complete across 5 buildings. The stage furthest along is Sanitary fittings within the flats, at 90%.

A100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
I99%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats90%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
J98%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats80%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
K96%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats70%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
L18%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth30%
Stilt Floor0%
Slabs of Super Structure30%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%

Progress on shared amenities19

As on 27 Aug 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes0%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes100%
Landscaping and tree plantingNoNot applicable
Street lightingYes100%
Community buildingsYes100%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,461 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 10.91 cr
Cost incurredRs 8.36 cr
Spent of the estimate76.64%
BuildingWingEstimatedIncurred
ANARs 2.18 crRs 1.67 cr
INARs 2.18 crRs 1.67 cr
JNARs 2.18 crRs 1.67 cr
KNARs 2.18 crRs 1.67 cr
LNARs 2.18 crRs 1.67 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRUCHIR SHETH (DESIGN STUDIO)
EngineerASHOK SHAH & ASSOCIATES (CHIRAG SHAH)

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/VADODARA/VADODARA/Others/MAA04323/EX1/240122Applied Aug 2021; approved Jan 2022

Documents filed42

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Others/MAA04323/EX1/240122 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)27 Aug 2021
Architect's certificate (Form 1)24 Aug 2021
Site photograph, A24 Aug 2021
Site photograph, I24 Aug 2021
Site photograph, J24 Aug 2021
Site photograph, K24 Aug 2021
Site photograph, L24 Aug 2021
RERA registration certificate12 Dec 2018
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-
Engineer's certificate (Form 2)-
Engineer's certificate annexure-

How this compares with Vadodara

34%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one moved by 12 months

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep PANCHAMRUT RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Harni2,900+ in Vadodara

2 kmPANCHAMRUT RESIDENCYOther 178Dot size: filed unitsN

Filed coordinates, straight-line distance. 178 registered projects within 2 km.

Builder: JAY AMBE DEVELOPERS

JAY AMBE DEVELOPERS has 7 registrations on GujRERA, including PANCHAMRUT RESIDENCY and VENICE BUNGLOWS. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if PANCHAMRUT RESIDENCY is delayed beyond 31 Jan 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of PANCHAMRUT RESIDENCY?

The registered promoter entity is JAY AMBE DEVELOPERS, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in PANCHAMRUT RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at PANCHAMRUT RESIDENCY?

The professionals named in the filing: Architect: RUCHIR SHETH (DESIGN STUDIO); Engineer: ASHOK SHAH & ASSOCIATES (CHIRAG SHAH). Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PANCHAMRUT RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PANCHAMRUT RESIDENCY. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PANCHAMRUT RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.