NILKANTH GREEN BUNGALOWS

By MARUTI INFRA

RG-GJ-01436 · RERA PR/GJ/VADODARA/VADODARA/Vadodara Municipal Corporation/RN237AA10137/281022 · Last updated on GujRERA portal: 30 Sep 2024

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Jun 2026Possession promisedno revision filed
0 of 18Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 93%
6 of 18Units unsoldnot recorded sold or booked
Jump to the 21 documents Report an error

NILKANTH GREEN BUNGALOWS is a Residential/Group Housing project by MARUTI INFRA in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Vadodara Municipal Corporation/RN237AA10137/281022 on 28 Oct 2022. Possession is promised by 30 Jun 2026. 12 of the 18 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete.

At a glance

Project

  • NameNILKANTH GREEN BUNGALOWS
  • TypeResidential/Group Housing
  • Location
    • OPP KRISHNA PRIME NEAR GALAXY HEIGHTS
    • CHHANI VADOARA
    • CHHANI
    • Vadodara
    • 390002
  • Pincode390002
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Vadodara Municipal Corporation/RN237AA10137/281022
  • ReraGenie IDRG-GJ-01436

Builder

  • NameMARUTI INFRA
  • Entity typePARTNERSHIP FIRM
  • Other registrations6 more →

Key dates

this monthRegisteredOct 2022PromisedJun 2026

Key facts

Registration and timeline

  • StatusValid until 30 Jun 2026
  • Registered on28 Oct 2022
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed21 files

Current status

67%12 of 18 units booked
58.1%Of the estimated cost spent so far

Figures as on 30 Sep 2024, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TYPE A---909
TYPE A1---909

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building2

As on 30 Sep 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 18 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 93%.

TYPE A58%
ActivityProgress
Excavation85%
Podiums (if any)Not applicable
Plinth85%
Stilt Floor33%
Slabs of Super Structure93%
Internal walls, internal plaster, floorings, doors and windows within flats89%
Sanitary fittings within the flats22%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks89%
External plumbing and external plaster, elevation, completion of terraces with waterproofing30%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
TYPE A156%
ActivityProgress
Excavation80%
Podiums (if any)Not applicable
Plinth80%
Stilt Floor33%
Slabs of Super Structure89%
Internal walls, internal plaster, floorings, doors and windows within flats89%
Sanitary fittings within the flats22%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks89%
External plumbing and external plaster, elevation, completion of terraces with waterproofing20%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%

Progress on shared amenities23

As on 30 Sep 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes0%
Water supplyYes25%
Sewerage (chamber, lines, septic tank, STP)NoNot applicable
Storm water drainsNoNot applicable
Landscaping and tree plantingYes0%
Street lightingYes0%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable
Compound wallYes0%
Plinth protectionYes0%
Water tankYes25%
Other requirementsYes0%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,532 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 4.30 cr
Cost incurredRs 2.50 cr
Spent of the estimate58.14%
BuildingWingEstimatedIncurred
TYPE ANARs 2.15 crRs 1.47 cr
TYPE A1NARs 2.15 crRs 1.03 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRAVINCHANDRA R. PATEL
EngineerCHIRAG ASHOKBHAI SHAH

Documents filed21

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Vadodara Municipal Corporation/RN237AA10137/281022 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer's certificate (Form 2)30 Sep 2024
Engineer's certificate annexure30 Sep 2024
RERA registration certificate28 Oct 2022
Proforma agreement for sale-
Project specific document-
Drainage affidavit-
Approved sanctioned plan-
Approved layout plan-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Declaration in Form B-
Approved building or plotting plan-
NOCs from authorities-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Proforma sale deed-

How this compares with Vadodara

67%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one has not

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep NILKANTH GREEN BUNGALOWS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near CHHANI2,900+ in Vadodara

2 kmNILKANTH GREEN BUNGALOWSOther 130Dot size: filed unitsN

Filed coordinates, straight-line distance. 130 registered projects within 2 km.

Builder: MARUTI INFRA

MARUTI INFRA has 7 registrations on GujRERA, including KRISHNA VILLA and NILKANTH GREEN BUNGALOWS. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if NILKANTH GREEN BUNGALOWS is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of NILKANTH GREEN BUNGALOWS?

The registered promoter entity is MARUTI INFRA, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in NILKANTH GREEN BUNGALOWS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at NILKANTH GREEN BUNGALOWS?

The professionals named in the filing: Architect: PRAVINCHANDRA R. PATEL; Engineer: CHIRAG ASHOKBHAI SHAH. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NILKANTH GREEN BUNGALOWS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NILKANTH GREEN BUNGALOWS. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NILKANTH GREEN BUNGALOWS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.