NIKETAN PLATINUM
RG-KA-99474 · RERA PRM/KA/RERA/1259/410/PR/010126/008372 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
NIKETAN PLATINUM is a Residential/Group Housing project by NIKETAN PLATINUM in Dharwad, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1259/410/PR/010126/008372 on 1 Jan 2026. Possession is promised by 15 Oct 2028. 2 of the 12 units on this registration are recorded sold or booked, and 5 of 17 construction stages are filed complete.
At a glance
Project
- NameNIKETAN PLATINUM
- TypeResidential/Group Housing
- Location
- Dharwad
- 580032
- Pincode580032
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1259/410/PR/010126/008372
- ReraGenie IDRG-KA-99474
Builder
- NameNIKETAN PLATINUM
- Entity typeCompany
- GSTIN29AAACN6740P1ZV
- Authorized SignatoryVISHNU MEHARWADE
- Managing DirectorVISHNU MEHARWADE
- DirectorMEENAKASHI KOTHARI
- Project HeadATUL KOTHARI
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on1 Jan 2026
- Promised completion15 Oct 2028
- Revised completionNone
- Buildings1 building record
- Documents filed76 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| NIKETAN PLATINUM’ | - | - | - | 12 | 0 | 12 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 17 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 25%.
Building: 31% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 25% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | No | Not applicable |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| RADHIKA MUTGI | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 2.44 cr | Rs 30.32 lakh |
| stamp duty | Rs 11.60 lakh | - |
| Payment of taxes | Rs 5.37 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sanjaykumar L Biranur |
| Engineer | Suryakant Madivalappa Kotagi |
| Chartered Accountant | M R JOSHI |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed76
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1259/410/PR/010126/008372 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: C A FORM 4.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: A C FORM 5Niketan Platinum.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Engineer Certificare From 6.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: form 4 niketan platinum ca.pdf | 14 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: form 5 archite engg.pdf | 14 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate Niketan Platinum 30062026.pdf | 14 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 14 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 14 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: form 4 chartered accountant NL.pdf | 9 Jul 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: form 5 archite engg Niketan Luxuria.pdf | 9 Jul 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate Niketan Luxuria.pdf | 9 Jul 2026 |
| Q4 2025-26 Water supply and sewage board | 9 Jul 2026 |
| Q4 2025-26 KPTCL- BESCOM | 9 Jul 2026 |
| Master plan along with demarcation of plotFile: Master plan along with demarcation of plot.jpeg | 23 Dec 2025 |
| 1. Upload the bank affidavit in the prescribed format documents. 2. Bank 100%, 70%, and 30% accountFile: bank letter and bank affidavit.pdf | 16 Dec 2025 |
| B 1)Approved Original Single Plot layout planFile: b 1 Approved Original Single Plot layout plan.pdf | 16 Dec 2025 |
| B 2)Approved Original Single Plot layout plan order.File: b 2 Approved Original Single Plot layout plan order.pdf | 16 Dec 2025 |
| b 3 ADLR Certified survey sketch Certifying the Boundary of the Proposed land-Original survey sketcFile: b 3 ADLR Certified survey sketch Certifying the Boundary of the Proposed land-Original sur | 16 Dec 2025 |
| B 4)Location details of the projectFile: b 4)Location details of the project.pdf | 16 Dec 2025 |
| B 5)Upload commencement certificateFile: b 5 Buildeing Permision.pdf | 16 Dec 2025 |
| B 6)Demarcation of proposed land in Approved Master plan Certified by the competent authorityFile: B 6)Demarcation of proposed land in Approved Master plan Certified by the competent.pdf | 16 Dec 2025 |
| B 7)Demarcation of proposed land in original Village map certified by the competent authorityFile: B 7)Demarcation of proposed land in original Village map certified by the competent author | 16 Dec 2025 |
| B 8)KSPCB NOCFile: B 8)KSPCB NOC.pdf | 16 Dec 2025 |
| B 9)Approval NOC under section 14 of the KTCP Act from competent AuthorityFile: B 9) ApprovalNOC under section 14 of the KTCP Act from competent Authority.pdf | 16 Dec 2025 |
| c1)Not updated the project address as per the approved layout planFile: c1) Not updated the project address as per the approved layout plan.pdf | 16 Dec 2025 |
| C 2)Kindly update the Project Engineer details along with the self-attested copy of the Engineer licFile: C 2 Engineer Reg Certificate AND ADHARD.pdf | 16 Dec 2025 |
| C 3)Kindly upload the engineeer certificate form 3 for duly signed byFile: C 3)Kindly upload the engineeer certificate form 3 for duly signed by.pdf | 16 Dec 2025 |
| C 4)Kindly upload a structural stability certificate clearly stating the building s safetyFile: C 4)Kindly upload a structural stability certificate clearly stating the building s safety | 16 Dec 2025 |
| C 5 Upload proforma Alloment letterFile: C5 Alloment letter.pdf | 16 Dec 2025 |
| C 6)Kindly upload the brief project estimation with engineer signatureFile: C 6)Kindly upload the brief project estimation with engineer.pdf | 16 Dec 2025 |
| c 7)Kindly upload the Land cost calculation sheet as per the guidance value Self attested copyFile: c 7)Kindly upload the Land cost calculation sheet as per the guidance value Self attested | 16 Dec 2025 |
| c 8)Kindly clarify the source of water supply to the project along with the supporting documents andFile: c 8) Kindly upload the STPSeptic tanksoak pitsewer line drawing certified by the Engineer | 16 Dec 2025 |
| Valuation reportFile: valuation report.pdf | 16 Dec 2025 |
| RTC, survey 1720 | - |
| Mutation, survey 1720 | - |
| Encumbrance Certificate, survey 1720 | - |
| Sale/Title/Gift Deed, survey 1720 | - |
| JDA, survey 1720 | - |
| Khatha, survey 1720 | - |
| Registration CertificateFile: COMPANY CERTIFICATE.pdf | - |
| Memorandum of AssociationFile: MOA AND AOA.pdf | - |
| Article of AssociationFile: MOA6.pdf | - |
| GST CertificateFile: GST CERTIFICATE.pdf | - |
| Organization StructureFile: Organazation strcuture.pdf | - |
| Certificate issued by CA Form 1File: CA CERTIFICAGTE-1.pdf | - |
| Certificate issued by Architect Form 2File: Certificate by architect (1).pdf | - |
| Certificate issued by Engineer Form 3File: Engineer Certificate.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: NON LITIGATION AFFIDAVIT.pdf | - |
| Balance Sheet 2024 - 2025File: nbpl balance sheet 25.pdf | - |
| Balance Sheet 2023 - 2024File: nbpl balance sheet 24.pdf | - |
| Balance Sheet 2022 - 2023File: NBPL BALANCE SHEET 23.pdf | - |
| Audited Profit and Loss Statement 2024 - 2025File: NBPL PROFIT LOSS 25.pdf | - |
| Audited Profit and Loss Statement 2023 - 2024File: NBPL profit loss 24.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: NBPL PROFIT LOSS 23.pdf | - |
| Income Tax Return Acknowledgement 2024 - 2025File: IT RETURN 25.pdf | - |
| Income Tax Return Acknowledgement 2023 - 2024File: IT RETURN 24.pdf | - |
| Income Tax Return Acknowledgement 2022 - 2023File: IT RETURN 23.pdf | - |
| Buildeing Permision | - |
| Building Plan | - |
| Building Plan | - |
| Building specifications project | - |
| sale deed | - |
| SALE AGREEMENT | - |
| allotment letter | - |
| FORM -B | - |
| AFFIDAVIT | - |
| AFFIDAVIT CUM DECLARATION | - |
| advacate serach report | - |
| NOC Electricity | - |
| WATER NOC N P | - |
| Correction Deed | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Dharwad
Computed across the 250+ Dharwad projects on ReraGenie, from their own filings.
Keep NIKETAN PLATINUM on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dharwad250+ in Dharwad
Filed coordinates, straight-line distance. 19 registered projects within 2 km.
construction of 1248 houses at Hubli
Commissioner
Akshay Town Tarihal Sector A
Suresh Enterprises Pvt.Ltd
ONE HUBLI PHASE-1
SHETTY-PATIL DEVELOPERS LLP
construction of 784 houses at Hubli
Commissioner
M/s. PRIDE IKON
M/s. PRIDE GROUP
Pourakarmikas Gruha Bhagya Yojane
Hubli Dharwad Municipal Corporation
See every Dharwad project, with the district possession charts
Builder: NIKETAN PLATINUM
NIKETAN PLATINUM has 1 registration on RERA Karnataka, including NIKETAN PLATINUM. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dharwad district page.
Frequently asked questions
What are my rights if NIKETAN PLATINUM is delayed beyond 15 Oct 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of NIKETAN PLATINUM?
The registered promoter entity is NIKETAN PLATINUM, a company as per the filing. Its GSTIN 29AAACN6740P1ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in NIKETAN PLATINUM?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at NIKETAN PLATINUM?
The professionals named in the filing: Architect: Sanjaykumar L Biranur; Engineer: Suryakant Madivalappa Kotagi; Chartered Accountant: M R JOSHI. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NIKETAN PLATINUM?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.