Registration approved No litigation declared Residential/Group Housing project

NIKETAN PLATINUM

By NIKETAN PLATINUM

RG-KA-99474 · RERA PRM/KA/RERA/1259/410/PR/010126/008372 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Oct 2028Possession promisedno revision filed
5 of 17Construction stages donefurthest along: RCC or MS Framed structure, 25%
10 of 12Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 76 documents Report an error

NIKETAN PLATINUM is a Residential/Group Housing project by NIKETAN PLATINUM in Dharwad, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1259/410/PR/010126/008372 on 1 Jan 2026. Possession is promised by 15 Oct 2028. 2 of the 12 units on this registration are recorded sold or booked, and 5 of 17 construction stages are filed complete.

At a glance

Project

  • NameNIKETAN PLATINUM
  • TypeResidential/Group Housing
  • Location
    • Dharwad
    • 580032
  • Pincode580032
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1259/410/PR/010126/008372
  • ReraGenie IDRG-KA-99474

Builder

  • NameNIKETAN PLATINUM
  • Entity typeCompany
  • GSTIN29AAACN6740P1ZV
  • Authorized SignatoryVISHNU MEHARWADE
  • Managing DirectorVISHNU MEHARWADE
  • DirectorMEENAKASHI KOTHARI
  • Project HeadATUL KOTHARI

Key dates

this monthRegisteredJan 2026PromisedOct 2028

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on1 Jan 2026
  • Promised completion15 Oct 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed76 files

Current status

17%2 of 12 units booked
11.6%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NIKETAN PLATINUM’---12012

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 17 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 25%.

Building: 31% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)100%
Retaining wall (All types)100%
RCC or MS Framed structure25%
Masonry Construction0%
Plastering inside , outside & Ceiling0%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)0%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes0%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes0%
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes0%
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes0%
Piped GasNoNot applicable
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes0%
LiftsYes0%
Corridor/LobbiesYes0%
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes0%
TerraceYes0%
Outer WallYes0%
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes0%
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area543 sq m
Named landowners1
LandownerVillageDistrict
RADHIKA MUTGI--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 2.61 cr
Cost incurredRs 30.32 lakh
Spent of the estimate11.62%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 2.44 crRs 30.32 lakh
stamp dutyRs 11.60 lakh-
Payment of taxesRs 5.37 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSanjaykumar L Biranur
EngineerSuryakant Madivalappa Kotagi
Chartered AccountantM R JOSHI

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed76

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1259/410/PR/010126/008372 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: C A FORM 4.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: A C FORM 5Niketan Platinum.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Engineer Certificare From 6.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: form 4 niketan platinum ca.pdf14 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: form 5 archite engg.pdf14 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate Niketan Platinum 30062026.pdf14 Jul 2026
Q1 2026-27 Water supply and sewage board14 Jul 2026
Q1 2026-27 KPTCL- BESCOM14 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: form 4 chartered accountant NL.pdf9 Jul 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: form 5 archite engg Niketan Luxuria.pdf9 Jul 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate Niketan Luxuria.pdf9 Jul 2026
Q4 2025-26 Water supply and sewage board9 Jul 2026
Q4 2025-26 KPTCL- BESCOM9 Jul 2026
Master plan along with demarcation of plotFile: Master plan along with demarcation of plot.jpeg23 Dec 2025
1. Upload the bank affidavit in the prescribed format documents. 2. Bank 100%, 70%, and 30% accountFile: bank letter and bank affidavit.pdf16 Dec 2025
B 1)Approved Original Single Plot layout planFile: b 1 Approved Original Single Plot layout plan.pdf16 Dec 2025
B 2)Approved Original Single Plot layout plan order.File: b 2 Approved Original Single Plot layout plan order.pdf16 Dec 2025
b 3 ADLR Certified survey sketch Certifying the Boundary of the Proposed land-Original survey sketcFile: b 3 ADLR Certified survey sketch Certifying the Boundary of the Proposed land-Original sur16 Dec 2025
B 4)Location details of the projectFile: b 4)Location details of the project.pdf16 Dec 2025
B 5)Upload commencement certificateFile: b 5 Buildeing Permision.pdf16 Dec 2025
B 6)Demarcation of proposed land in Approved Master plan Certified by the competent authorityFile: B 6)Demarcation of proposed land in Approved Master plan Certified by the competent.pdf16 Dec 2025
B 7)Demarcation of proposed land in original Village map certified by the competent authorityFile: B 7)Demarcation of proposed land in original Village map certified by the competent author16 Dec 2025
B 8)KSPCB NOCFile: B 8)KSPCB NOC.pdf16 Dec 2025
B 9)Approval NOC under section 14 of the KTCP Act from competent AuthorityFile: B 9) ApprovalNOC under section 14 of the KTCP Act from competent Authority.pdf16 Dec 2025
c1)Not updated the project address as per the approved layout planFile: c1) Not updated the project address as per the approved layout plan.pdf16 Dec 2025
C 2)Kindly update the Project Engineer details along with the self-attested copy of the Engineer licFile: C 2 Engineer Reg Certificate AND ADHARD.pdf16 Dec 2025
C 3)Kindly upload the engineeer certificate form 3 for duly signed byFile: C 3)Kindly upload the engineeer certificate form 3 for duly signed by.pdf16 Dec 2025
C 4)Kindly upload a structural stability certificate clearly stating the building s safetyFile: C 4)Kindly upload a structural stability certificate clearly stating the building s safety16 Dec 2025
C 5 Upload proforma Alloment letterFile: C5 Alloment letter.pdf16 Dec 2025
C 6)Kindly upload the brief project estimation with engineer signatureFile: C 6)Kindly upload the brief project estimation with engineer.pdf16 Dec 2025
c 7)Kindly upload the Land cost calculation sheet as per the guidance value Self attested copyFile: c 7)Kindly upload the Land cost calculation sheet as per the guidance value Self attested 16 Dec 2025
c 8)Kindly clarify the source of water supply to the project along with the supporting documents andFile: c 8) Kindly upload the STPSeptic tanksoak pitsewer line drawing certified by the Engineer 16 Dec 2025
Valuation reportFile: valuation report.pdf16 Dec 2025
RTC, survey 1720-
Mutation, survey 1720-
Encumbrance Certificate, survey 1720-
Sale/Title/Gift Deed, survey 1720-
JDA, survey 1720-
Khatha, survey 1720-
Registration CertificateFile: COMPANY CERTIFICATE.pdf-
Memorandum of AssociationFile: MOA AND AOA.pdf-
Article of AssociationFile: MOA6.pdf-
GST CertificateFile: GST CERTIFICATE.pdf-
Organization StructureFile: Organazation strcuture.pdf-
Certificate issued by CA Form 1File: CA CERTIFICAGTE-1.pdf-
Certificate issued by Architect Form 2File: Certificate by architect (1).pdf-
Certificate issued by Engineer Form 3File: Engineer Certificate.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: NON LITIGATION AFFIDAVIT.pdf-
Balance Sheet 2024 - 2025File: nbpl balance sheet 25.pdf-
Balance Sheet 2023 - 2024File: nbpl balance sheet 24.pdf-
Balance Sheet 2022 - 2023File: NBPL BALANCE SHEET 23.pdf-
Audited Profit and Loss Statement 2024 - 2025File: NBPL PROFIT LOSS 25.pdf-
Audited Profit and Loss Statement 2023 - 2024File: NBPL profit loss 24.pdf-
Audited Profit and Loss Statement 2022 - 2023File: NBPL PROFIT LOSS 23.pdf-
Income Tax Return Acknowledgement 2024 - 2025File: IT RETURN 25.pdf-
Income Tax Return Acknowledgement 2023 - 2024File: IT RETURN 24.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: IT RETURN 23.pdf-
Buildeing Permision-
Building Plan-
Building Plan-
Building specifications project-
sale deed-
SALE AGREEMENT-
allotment letter-
FORM -B-
AFFIDAVIT-
AFFIDAVIT CUM DECLARATION-
advacate serach report-
NOC Electricity-
WATER NOC N P-
Correction Deed-

How this compares with Dharwad

17%of this project is bookeddistrict median 38%
29%of Dharwad projects moved their completion datethis one has not
0%of Dharwad registrations are shown as withdrawn or revokedthis one is not

Computed across the 250+ Dharwad projects on ReraGenie, from their own filings.

Keep NIKETAN PLATINUM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dharwad250+ in Dharwad

2 kmNIKETAN PLATINUMOther 19Dot size: filed unitsN

Filed coordinates, straight-line distance. 19 registered projects within 2 km.

Builder: NIKETAN PLATINUM

NIKETAN PLATINUM has 1 registration on RERA Karnataka, including NIKETAN PLATINUM. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dharwad district page.

Frequently asked questions

What are my rights if NIKETAN PLATINUM is delayed beyond 15 Oct 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of NIKETAN PLATINUM?

The registered promoter entity is NIKETAN PLATINUM, a company as per the filing. Its GSTIN 29AAACN6740P1ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in NIKETAN PLATINUM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at NIKETAN PLATINUM?

The professionals named in the filing: Architect: Sanjaykumar L Biranur; Engineer: Suryakant Madivalappa Kotagi; Chartered Accountant: M R JOSHI. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NIKETAN PLATINUM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NIKETAN PLATINUM. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NIKETAN PLATINUM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.