Valid until 30 Jun 2022 Mixed Development project

NEELKANTH GOLD

By JALARAM BUILDCON

RG-GJ-86070 · RERA PR/GJ/VADODARA/VADODARA/Others/MAA04493/281218 · Last updated on GujRERA portal: 5 Jan 2021

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
  • Separate project account declared
Jun 2022Possession promisedno revision filed
3 of 8Construction stages donefurthest along: Internal walls, 90%
35 of 56Units unsoldnot recorded sold or booked
Jump to the 42 documents Report an error

NEELKANTH GOLD is a Mixed Development project by JALARAM BUILDCON in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Others/MAA04493/281218 on 28 Dec 2018. Possession is promised by 30 Jun 2022. 21 of the 56 units on this registration are recorded sold or booked, and 3 of 8 construction stages are filed complete.

At a glance

Project

  • NameNEELKANTH GOLD
  • TypeMixed Development
  • Location
    • NEAR NILAMBER 1
    • BHAYLI GOTRI ROAD
    • Vasana-Bhayli
    • Vadodara
    • 390007
  • Pincode390007
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Others/MAA04493/281218
  • ReraGenie IDRG-GJ-86070

Builder

  • NameJALARAM BUILDCON
  • Entity typePARTNERSHIP FIRM
  • Other registrations1 more →

Key dates

this monthRegisteredDec 2018PromisedJun 2022

Key facts

Registration and timeline

  • StatusValid until 30 Jun 2022
  • Registered on28 Dec 2018
  • Promised completion30 Jun 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed42 files

Current status

38%21 of 56 units booked
389.9%Of the estimated cost spent so far

Figures as on 5 Jan 2021, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER 1---441256

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building1

As on 5 Jan 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 8 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

TOWER 1: 94% average across the applicable activities

ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats90%
Sanitary fittings within the flats90%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing90%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing90%

Progress on shared amenities19

As on 5 Jan 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes0%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes40%
Storm water drainsNoNot applicable
Landscaping and tree plantingYes20%
Street lightingYes0%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityYes0%
Letter boxYes0%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,553 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 6.75 cr
Cost incurredRs 26.32 cr
Spent of the estimate389.85%
BuildingWingEstimatedIncurred
TOWER 1NARs 6.75 crRs 26.32 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDHARMESH PATEL
EngineerAKASH SHAH

Documents filed42

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Others/MAA04493/281218 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)5 Jan 2021
Engineer's certificate (Form 2)5 Jan 2021
Engineer's certificate annexure5 Jan 2021
Accountant's certificate (Form 3)5 Jan 2021
Site photograph, TOWER 15 Jan 2021
Site photograph, TOWER 15 Jan 2021
Site photograph, TOWER 15 Jan 2021
Site photograph, TOWER 15 Jan 2021
Site photograph, TOWER 15 Jan 2021
RERA registration certificate28 Dec 2018
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Vadodara

38%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one has not

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep NEELKANTH GOLD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Vasana-Bhayli2,900+ in Vadodara

2 kmNEELKANTH GOLDOther 331Dot size: filed unitsN

Filed coordinates, straight-line distance. 331 registered projects within 2 km.

Builder: JALARAM BUILDCON

JALARAM BUILDCON has 2 registrations on GujRERA, including NEELKANTH GOLD and PAARIJAT HARMONY. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if NEELKANTH GOLD is delayed beyond 30 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of NEELKANTH GOLD?

The registered promoter entity is JALARAM BUILDCON, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in NEELKANTH GOLD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at NEELKANTH GOLD?

The professionals named in the filing: Architect: DHARMESH PATEL; Engineer: AKASH SHAH. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NEELKANTH GOLD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NEELKANTH GOLD. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NEELKANTH GOLD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.