ReraGenieLog inGet a buyer report

Home / Browse projects / Dharwad, Karnataka / NAVEEN RESIDENCY

Registration approved Residential/Group Housing project

NAVEEN RESIDENCY

By Hosmath Infrastructure

RG-KA-79379 · RERA PRM/KA/RERA/1259/410/PR/180120/001334

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Dec 2019Possession promisedmoved 12 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 56 documents Report an error

NAVEEN RESIDENCY is a Residential/Group Housing project by Hosmath Infrastructure in Dharwad, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1259/410/PR/180120/001334 on 20 Jan 2018. Possession is promised by 31 Dec 2019. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameNAVEEN RESIDENCY
  • TypeResidential/Group Housing
  • Location
    • Dharwad
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1259/410/PR/180120/001334
  • ReraGenie IDRG-KA-79379

Builder

  • NameHosmath Infrastructure
  • Entity typeTrust
  • Authorized SignatoryKumarswamy S Hosmath
  • DirectorKumarswamy S Hosmath

Key dates

this monthRegisteredJan 2018First promiseDec 2018Revised toDec 2019

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on20 Jan 2018
  • Promised completion31 Dec 2019
  • Revised completionRevised to 31 Dec 2019 (originally 31 Dec 2018)
  • Buildings1 building record
  • Documents filed56 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Naveen Residency---36036

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etcNot applicable
Plastering inside , outside & CeilingNot applicable
Joinery: Doors, Windows, Ventilators etcNot applicable
Basic work of Water supply, Sanitary and ElectrificationNot applicable
Dadoing, Skirting, Flooring, Tiles work (All types)Not applicable
Railing and Grill fixingNot applicable
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
PaintingNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemNoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationNoNot applicable
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
GasNoNot applicable
Water and SanitationNoNot applicable
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,385 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 5.00 cr

Certifying professionals and partners1

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
EngineerVaishnavi Consultant

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1259/410/PR/200117/001334Dec 2018 → Dec 2019

Reason as filed by the promoterothers

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed56

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1259/410/PR/180120/001334 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: REGISTRATION CERTIFICATE.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Architect certificate of completion.PDF-
Engineer Certificate for Work Completion Schedule till DateFile: Engineer certificate completion.PDF-
CA Certificate for Funds UtilizationFile: CA certificate Fund completion.PDF-
Architect Certificate for Pending Work Completion Schedule.File: Architect certificate Pending.PDF-
Engineer Certificate for Pending Work Completion Schedule.File: Engineer certificate Pending.PDF-
CA Certificate for Funds required for Project CompletionFile: CA certificate of pending.PDF-
AffidavitFile: Form b.pdf-
Latest Encumbrance CertificateFile: Latest encumbrance.PDF-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
Document 1File: Bank Statement (Jan to June 19).PDF-
Document 2File: Consent letters from allottees.PDF-
Document 3File: Notarized Affidavit.PDF-
Document 4File: Renewal application Acknowledgem.PDF-
Document 5File: Compensation letter.PDF-
Commencement Certificate-
Approved Building Plan-
layout-
Sale Deed-
Sale Agreement (Proforma)-
Sale Deed-
Approved Building Plan-
Area Development-
Proforma - Allotment letter-
Brochures-
Declaration for NOC- Naveen--
Specification-
EC-
Katha (CTS No 429B Plot No 62 to 69)-
Joint Development Agreement-
Conversion Order-
Balance Sheet 2015 - 2016File: Balance Sheet 2016.pdf-
Balance Sheet 2014 - 2015File: Balance Sheet 2015.pdf-
Balance Sheet 2013 - 2014File: Balance Sheet 2014.pdf-
Audited Profit and Loss Statement 2015 - 2016File: P & L consolidated 2016.pdf-
Audited Profit and Loss Statement 2014 - 2015File: Profit and Loss 2015.pdf-
Audited Profit and Loss Statement 2013 - 2014File: profit and loss 2014.pdf-
Director's Report 2015 - 2016File: Directors Declaration.PDF-
Director's Report 2014 - 2015File: Directors Declaration.PDF-
Director's Report 2013 - 2014File: Directors Declaration.PDF-
Cash Flow Statement 2015 - 2016File: Cashflow Declaration.PDF-
Cash Flow Statement 2014 - 2015File: Cashflow Declaration.PDF-
Auditor's Report 2015 - 2016File: Auditors Report 2016.pdf-
Auditor's Report 2014 - 2015File: Audit Report Declaration.PDF-
Auditor's Report 2013 - 2014File: Audit Report Declaration.PDF-
Income Tax Return Acknowledgement 2015 - 2016File: ITR 2016.jpg-
Income Tax Return Acknowledgement 2014 - 2015File: ITR 2015.jpg-
Income Tax Return Acknowledgement 2013 - 2014File: ITR 2014.jpg-
Form-B-
Prospectus/BrochureFile: NAVEEN BOUCHER (1).pdf-
Advertisement Copy 1File: NAVEEN BOUCHER (1).pdf-
Tower Excel SheetFile: PRM_KA_RERA_1259_410_PR_180120_001334.xlsx-
Occupancy CertificateFile: Ack letter of HDMC for CC.PDF-
Completion certificateFile: Ack letter of HDMC for CC.PDF-
Registered Agreement of SaleFile: aggrement for sale.pdf-
Registered conveyance deed for an individual unitFile: aggrement for sale.pdf-

How this compares with Dharwad

29%of Dharwad projects moved their completion datethis one moved by 12 months
0%of Dharwad registrations are shown as withdrawn or revokedthis one is not

Computed across the 250+ Dharwad projects on ReraGenie, from their own filings.

Keep NAVEEN RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dharwad250+ in Dharwad

Builder: Hosmath Infrastructure

Hosmath Infrastructure has 1 registration on RERA Karnataka, including NAVEEN RESIDENCY. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dharwad district page.

Frequently asked questions

What are my rights if NAVEEN RESIDENCY is delayed beyond 31 Dec 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of NAVEEN RESIDENCY?

The registered promoter entity is Hosmath Infrastructure, a trust as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in NAVEEN RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at NAVEEN RESIDENCY?

The professionals named in the filing: Engineer: Vaishnavi Consultant. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NAVEEN RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NAVEEN RESIDENCY. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NAVEEN RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.