RG-KA-08687 · RERA PRM/KA/RERA/1259/479/PR/280126/008429 · Last updated on RERA Karnataka portal: 14 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Mar 2029Possession promisedno revision filed
5 of 18Construction stages donefurthest along: RCC or MS Framed structure, 80%
16 of 16Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 75 documents Report an error

Navarna Heights is a Residential/Group Housing project by Vinod K Patil in Dharwad, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1259/479/PR/280126/008429 on 28 Jan 2026. Possession is promised by 31 Mar 2029. 0 of the 16 units on this registration are recorded sold or booked, and 5 of 18 construction stages are filed complete.

At a glance

Project

  • NameNavarna Heights
  • TypeResidential/Group Housing
  • Location
    • Hubballi
    • Dharwad
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1259/479/PR/280126/008429
  • ReraGenie IDRG-KA-08687

Builder

  • NameVinod K Patil
  • Entity typeOther ( Joint Land Owners )
  • GSTIN29ADZPP6705D1ZZ
  • Authorized SignatoryVinod K Patil

Key dates

this monthRegisteredJan 2026PromisedMar 2029

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on28 Jan 2026
  • Promised completion31 Mar 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed75 files

Current status

0%0 of 16 units booked
80.6%Of the estimated cost spent so far

Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Navarna Heights---16016

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 18 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 80%.

Building: 36% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)100%
Retaining wall (All types)100%
RCC or MS Framed structure80%
Masonry Construction40%
Plastering inside , outside & Ceiling30%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with network0%
Weather Proof work(tile,concrete)0%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes50%
Sewage and Drainage SystemYes50%
Water conservation/rain water harvesting/recharge of ground waterYes50%
Energy managementYes50%
Fire protection and fire safety requirementsYes50%
Solid waste management and disposalYes50%
Emergency Evacuation servicesYes50%
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes50%
Storm water drainsYes50%
Use of renewable energyYes50%
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes50%
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationYes50%
Air ConditioningNoNot applicable
StaircasesYes80%
LiftsYes80%
Corridor/LobbiesYes80%
Fire escapesYes50%
Common entrance and exit for the building/common portico/foyer/verandahYes50%
BasementNoNot applicable
TerraceYes50%
Outer WallYes60%
Open parking areasYes50%
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes60%
Common storage spacesNoNot applicable

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners2
LandownerVillageDistrict
Girish Krishnappa Timmapur--
Vinod K Patil--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 3.77 cr
Cost incurredRs 3.04 cr
Spent of the estimate80.63%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 3.64 crRs 2.97 cr
On-site expenditure-Consultants FeesRs 8.00 lakhRs 7.00 lakh
On-site expenditure-Site OverheadRs 5.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNehal Nidagudi
EngineerEr Santosh M Achatageri
Chartered AccountantSiddalingappa Betageri

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed75

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1259/479/PR/280126/008429 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Q2 2026-2027 Form 4 CA_compressed.pdf14 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Q2 2026-2027 Form 5 Arch.pdf14 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Q2 2026-2027 Form 6 Eng.pdf14 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: FORM 4 Q1 2026-27.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Q1 2026-27.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: FORM 6 Q12026-27.pdf15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate.pdf10 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate.pdf10 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate.pdf10 Apr 2026
AOS Navarna HeightsFile: AOS Navarna Heights.pdf14 Jan 2026
No Litigation affidavitFile: No Litigation Affidavit.pdf14 Jan 2026
Registerd GPAFile: General Power of Attorney (GPA).pdf17 Dec 2025
Building LicenceFile: 4 Building Approval Letter.pdf17 Dec 2025
Approved Building PlanFile: 2 Approved Building Plan.pdf17 Dec 2025
Statbility CertifiaceFile: Structural Stability Certificate.pdf17 Dec 2025
Strucutual Engineer LicenceFile: Structural Engineer License.pdf17 Dec 2025
Water NocFile: 17 Affidavit for Water Noc.pdf17 Dec 2025
Guidance Value CertificateFile: Guidance Value Certificate.jpeg17 Dec 2025
Estimated Cost of ConstructionFile: 19 Estimated Cost of Construction.pdf17 Dec 2025
CDP MaptFile: 5 CDP Map.pdf17 Dec 2025
Sectional PlanFile: 7 Section Plan.pdf17 Dec 2025
ECFile: 8 EC up to 8 9 2025.pdf17 Dec 2025
CTS UtarFile: CTS Uttar.pdf17 Dec 2025
PT Sheet or Site Map by CTSFile: P T Sheet.pdf17 Dec 2025
Registration CertificateFile: GST Reg Certificate.pdf-
GST CertificateFile: GST Reg Certificate.pdf-
Certificate issued by CA Form 1File: Reg 1 CA Certificate.pdf-
Certificate issued by Architect Form 2File: Form 2 Architect Certificate.pdf-
Certificate issued by Engineer Form 3File: Form 3 Engineer Certificate.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Affidavit For Non Litigation.pdf-
Balance Sheet 2024 - 2025File: Balance Sheet 2024-25.pdf-
Audited Profit and Loss Statement 2024 - 2025File: Profit and Loss Account 2024-25.pdf-
Income Tax Return Acknowledgement 2024 - 2025File: ITR Ack 2021-22.pdf-
Income Tax Return Acknowledgement 2023 - 2024File: ITR Ack 2022-23.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: ITR Ack 2021-22.pdf-
Building Approval Letter-
Building Approval Letter-
Section Plan-
Structural Stability Certificate-
Project Specifications-
Project Specifications-
General Power of Attorney (GPA)-
Agreement For Sale-
Allotmet Letter-
Affidavit Form B-
Affidavits Section 3-
Ligal Opinion-
HESCOM NOC-
Water NOC-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Baksish Deed 1-
Bakshis Deed 2-
General Power of Attorney (GPA)-
Gift Deed-
Mother Deed-
P T Sheet-
Master Plan-
Village Map-
Cash Flow Certificate-
Land Cost Calculation-
Affidavits For HESCOM Noc-
Form 6 Engineer Certificate-

How this compares with Dharwad

0%of this project is bookeddistrict median 38%
29%of Dharwad projects moved their completion datethis one has not
0%of Dharwad registrations are shown as withdrawn or revokedthis one is not

Computed across the 250+ Dharwad projects on ReraGenie, from their own filings.

Keep Navarna Heights on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dharwad250+ in Dharwad

Builder: Vinod K Patil

Vinod K Patil has 1 registration on RERA Karnataka, including Navarna Heights. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dharwad district page.

Frequently asked questions

What are my rights if Navarna Heights is delayed beyond 31 Mar 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Navarna Heights?

The registered promoter entity is Vinod K Patil, an other ( joint land owners ) as per the filing. Its GSTIN 29ADZPP6705D1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Navarna Heights?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Navarna Heights?

The professionals named in the filing: Architect: Nehal Nidagudi; Engineer: Er Santosh M Achatageri; Chartered Accountant: Siddalingappa Betageri. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Navarna Heights?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Navarna Heights. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Navarna Heights to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.