Home / Browse projects / Ahmedabad, Gujarat / NARODA SMART CITY

Valid until 31 Dec 2019 Mixed Development project

NARODA SMART CITY

By KESHAVPRIYA CORP PRIVATE LIMITED

RG-GJ-82511 · RERA PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/MAA02006/EX1/A1M/070319 · Last updated on GujRERA portal: 30 Dec 2019

Source: official GujRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Separate project account declared
Dec 2019Possession promisedmoved 12 months from the original
23 of 27Construction stages doneacross 3 buildings; furthest along: Sanitary fittings within the flats, 95%
5 of 197Units unsoldnot recorded sold or booked
Jump to the 44 documents Report an error

NARODA SMART CITY is a Mixed Development project by KESHAVPRIYA CORP PRIVATE LIMITED in Ahmedabad, Gujarat, registered with GujRERA as PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/MAA02006/EX1/A1M/070319 on 15 Mar 2018. Possession is promised by 31 Dec 2019. The completion date has moved by 12 months from the original filing. 192 of the 197 units on this registration are recorded sold or booked, and 23 of 27 construction stages are filed complete.

At a glance

Project

  • NameNARODA SMART CITY
  • TypeMixed Development
  • Location
    • Besides Hanspura Residency
    • Nr. Vraj Residency Bunglows
    • Muthiya
    • Ahmedabad City
    • Ahmedabad
    • 382330
  • Pincode382330
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/MAA02006/EX1/A1M/070319
  • ReraGenie IDRG-GJ-82511

Builder

  • NameKESHAVPRIYA CORP PRIVATE LIMITED
  • Entity typeCOMPANY
  • Other registrations4 more →

Key dates

this monthRegisteredMar 2018First promiseDec 2018Revised toDec 2019

Key facts

Registration and timeline

  • StatusValid until 31 Dec 2019
  • Registered on15 Mar 2018
  • Promised completion31 Dec 2019
  • Revised completionRevised to 31 Dec 2019 (originally 31 Dec 2018)
  • Buildings3 building records
  • Documents filed44 files

Current status

97%192 of 197 units booked
100.0%Of the estimated cost spent so far

Figures as on 30 Dec 2019, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
D+E---56056
F+G---49453
A+B+C---84488

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building3

As on 30 Dec 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

23 of 27 construction stages are filed complete across 3 buildings. The stage furthest along is Sanitary fittings within the flats, at 95%.

D+E100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
F+G96%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats95%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing90%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing90%
A+B+C100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 30 Dec 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsNoNot applicable
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityYes100%
Letter boxYes100%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,296 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 11.55 cr
Cost incurredRs 11.55 cr
Spent of the estimate100.0%
BuildingWingEstimatedIncurred
A+B+CNARs 3.85 crRs 3.85 cr
D+ENARs 3.85 crRs 3.85 cr
F+GNARs 3.85 crRs 3.85 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSanjay B. Parekh
EngineerJayesh D desai

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/MAA02006/EX1/230119Applied Dec 2018; approved Jan 2019

Documents filed44

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/MAA02006/EX1/A1M/070319 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)30 Dec 2019
Engineer's certificate (Form 2)30 Dec 2019
Engineer's certificate annexure30 Dec 2019
Accountant's certificate (Form 3)30 Dec 2019
Site photograph, D+E30 Dec 2019
Site photograph, D+E30 Dec 2019
Site photograph, F+G30 Dec 2019
Site photograph, F+G30 Dec 2019
Site photograph, A+B+C30 Dec 2019
Site photograph, A+B+C30 Dec 2019
Site photograph, A+B+C30 Dec 2019
RERA registration certificate15 Mar 2018
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Ahmedabad

97%of this project is bookeddistrict median 53%
14%of Ahmedabad projects moved their completion datethis one moved by 12 months

Computed across the 5,400+ Ahmedabad projects on ReraGenie, from their own filings.

Keep NARODA SMART CITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Muthiya5,400+ in Ahmedabad

2 kmNARODA SMART CITYOther 266Dot size: filed unitsN

Filed coordinates, straight-line distance. 266 registered projects within 2 km.

Builder: KESHAVPRIYA CORP PRIVATE LIMITED

KESHAVPRIYA CORP PRIVATE LIMITED has 5 registrations on GujRERA, including Sahaj Greens and NARODA SMART CITY-2. Read the full track record. See more projects on the Ahmedabad district page.

Frequently asked questions

What are my rights if NARODA SMART CITY is delayed beyond 31 Dec 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of NARODA SMART CITY?

The registered promoter entity is KESHAVPRIYA CORP PRIVATE LIMITED, a company as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in NARODA SMART CITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at NARODA SMART CITY?

The professionals named in the filing: Architect: Sanjay B. Parekh; Engineer: Jayesh D desai. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NARODA SMART CITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NARODA SMART CITY. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NARODA SMART CITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.