meera 26 residency

By SAMARTH SURESHBHAI PATEL Proprietorship of S P BUILDERS

RG-GJ-42520 · RERA PR/GJ/VADODARA/PADRA/Others/RAA04551/010119 · Last updated on GujRERA portal: 31 Mar 2019

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
  • Separate project account declared
Dec 2020Possession promisedno revision filed
32 of 36Construction stages doneacross 4 buildings; furthest along: Stilt Floor, 0%
Jump to the 19 documents Report an error

meera 26 residency is a Residential/Group Housing project by SAMARTH SURESHBHAI PATEL Proprietorship of S P BUILDERS in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/PADRA/Others/RAA04551/010119 on 1 Jan 2019. Possession is promised by 31 Dec 2020.

At a glance

Project

  • Namemeera 26 residency
  • TypeResidential/Group Housing
  • Location
    • sr. no. 1244/p
    • padra kasba
    • b/h western ceramic
    • padra
    • Padra
    • Vadodara
    • 391440
  • Pincode391440
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/PADRA/Others/RAA04551/010119
  • ReraGenie IDRG-GJ-42520

Builder

  • NameSAMARTH SURESHBHAI PATEL Proprietorship of S P BUILDERS
  • Entity typeIndividual/Propritorship
  • Other registrations2 more →

Key dates

this monthRegisteredJan 2019PromisedDec 2020

Key facts

Registration and timeline

  • StatusValid until 31 Dec 2020
  • Registered on1 Jan 2019
  • Promised completion31 Dec 2020
  • Revised completionNone
  • Buildings4 building records
  • Documents filed19 files

Current status

142.4%Of the estimated cost spent so far

Figures as on 31 Mar 2019, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
type A-----2
type B-----1
type C-----1
type D-----22

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building4

As on 31 Mar 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

32 of 36 construction stages are filed complete across 4 buildings. The stage furthest along is Stilt Floor, at 0%.

type A89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
type B89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
type C89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
type D89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 31 Mar 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsNoNot applicable
Landscaping and tree plantingYes100%
Street lightingNoNot applicable
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,600 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 52.65 lakh
Cost incurredRs 75.00 lakh
Spent of the estimate142.45%
BuildingWingEstimatedIncurred
type ANARs 13.16 lakhRs 18.75 lakh
type BNARs 13.16 lakhRs 18.75 lakh
type CNARs 13.16 lakhRs 18.75 lakh
type DNARs 13.16 lakhRs 18.75 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architectrahul patel
Engineersnehal patel

Documents filed19

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/PADRA/Others/RAA04551/010119 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)31 Mar 2019
Engineer's certificate (Form 2)31 Mar 2019
Site photograph, type A31 Mar 2019
Site photograph, type A31 Mar 2019
Site photograph, type B31 Mar 2019
Site photograph, type B31 Mar 2019
Site photograph, type C31 Mar 2019
Site photograph, type C31 Mar 2019
Site photograph, type D31 Mar 2019
Site photograph, type D31 Mar 2019
RERA registration certificate1 Jan 2019
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-

How this compares with Vadodara

23%of Vadodara projects moved their completion datethis one has not

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep meera 26 residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Padra2,900+ in Vadodara

2 kmmeera 26 residencyOther 32Dot size: filed unitsN

Filed coordinates, straight-line distance. 32 registered projects within 2 km.

Builder: SAMARTH SURESHBHAI PATEL Proprietorship of S P BUILDERS

SAMARTH SURESHBHAI PATEL Proprietorship of S P BUILDERS has 3 registrations on GujRERA, including meera 26 residency and Meera 48 residency. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if meera 26 residency is delayed beyond 31 Dec 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of meera 26 residency?

The registered promoter entity is SAMARTH SURESHBHAI PATEL Proprietorship of S P BUILDERS, an individual/propritorship as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in meera 26 residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at meera 26 residency?

The professionals named in the filing: Architect: rahul patel; Engineer: snehal patel. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in meera 26 residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About meera 26 residency. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save meera 26 residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.