Valid until 31 Jul 2019 Residential/Group Housing project

Maruti Greenland

By Meghavarsha Estate Developers Private Limited

RG-GJ-57820 · RERA PR/GJ/AHMEDABAD/SANAND/AUDA/RAA01265/090118 · Last updated on GujRERA portal: 11 Dec 2021

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
  • Separate project account declared
Jul 2019Possession promisedno revision filed
532 of 834Construction stages doneacross 86 buildings; furthest along: Podiums (if any), 99%
10 of 86Units unsoldnot recorded sold or booked
Jump to the 123 documents Report an error

Maruti Greenland is a Residential/Group Housing project by Meghavarsha Estate Developers Private Limited in Ahmedabad, Gujarat, registered with GujRERA as PR/GJ/AHMEDABAD/SANAND/AUDA/RAA01265/090118 on 9 Jan 2018. Possession is promised by 31 Jul 2019. 76 of the 86 units on this registration are recorded sold or booked, and 532 of 834 construction stages are filed complete.

At a glance

Project

  • NameMaruti Greenland
  • TypeResidential/Group Housing
  • Location
    • SURVEY NO 162 OPP SAFRONI PARK
    • MOJE TELAV TAL SANAND
    • Telav
    • Sanand
    • Ahmedabad
    • 382210
  • Pincode382210
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/AHMEDABAD/SANAND/AUDA/RAA01265/090118
  • ReraGenie IDRG-GJ-57820

Builder

  • NameMeghavarsha Estate Developers Private Limited
  • Entity typeCOMPANY

Key dates

this monthRegisteredJan 2018PromisedJul 2019

Key facts

Registration and timeline

  • StatusValid until 31 Jul 2019
  • Registered on9 Jan 2018
  • Promised completion31 Jul 2019
  • Revised completionNone
  • Buildings86 building records
  • Documents filed123 files

Current status

88%76 of 86 units booked
100.0%Of the estimated cost spent so far

Figures as on 11 Dec 2021, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
1---001
2---001
3---001
4---001
5---101
6---101
7---101
8---101
9---101
10---101
11---101
12---101
13---101
14---101
15---101
16---101
17---101
18---101
19---101
20---101
21---101
22---101
23---101
24---101
25---101
26---101
27---101
28---101
29---101
30---101
31---101
32---101
33---101
34---101
35---101
36---101
37---101
38---001
39---001
40---001
41---001
42---101
43---101
44---101
45---101
46---101
47---101
48---101
49---101
50---001
51---001
52---001
53---001
54---001
55---001
56---001
57---001
58---001
59---001
60---001
61---001
62---001
63---001
64---001
65---001
66---001
67---101
68---101
69---101
70---101
71---101
72---101
73---101
74---101
75---101
76---101
77---101
78---101
79---101
80---001
81---101
82---101
83---101
84---101
85---101
86---101

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building20

As on 11 Dec 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 86 buildings; the table lists the first 20.

532 of 834 construction stages are filed complete across 86 buildings. The stage furthest along is Podiums (if any), at 99%.

10%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
20%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
30%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
40%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
590%
ActivityProgress
Excavation100%
Podiums (if any)99%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats99%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing99%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing99%
690%
ActivityProgress
Excavation100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
790%
ActivityProgress
Excavation100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
890%
ActivityProgress
Excavation100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
990%
ActivityProgress
Excavation100%
Podiums (if any)99%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats99%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing99%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing99%
1090%
ActivityProgress
Excavation100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
1190%
ActivityProgress
Excavation100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
1290%
ActivityProgress
Excavation100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
1390%
ActivityProgress
Excavation100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
1490%
ActivityProgress
Excavation100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
1590%
ActivityProgress
Excavation100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
1690%
ActivityProgress
Excavation100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
1790%
ActivityProgress
Excavation100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
1890%
ActivityProgress
Excavation100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
1990%
ActivityProgress
Excavation100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
2090%
ActivityProgress
Excavation100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 11 Dec 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes100%
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsYes100%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes0%
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingNoNot applicable
Drinking water facilitiesYes100%
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityYes0%
Letter boxYes0%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area42,600 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 13.50 cr
Cost incurredRs 13.50 cr
Spent of the estimate100.0%
BuildingWingEstimatedIncurred
1NARs 15.70 lakhRs 15.70 lakh
2NARs 15.70 lakhRs 15.70 lakh
3NARs 15.70 lakhRs 15.70 lakh
4NARs 15.70 lakhRs 15.70 lakh
5NARs 15.70 lakhRs 15.70 lakh
6NARs 15.70 lakhRs 15.70 lakh
7NARs 15.70 lakhRs 15.70 lakh
8NARs 15.70 lakhRs 15.70 lakh
9NARs 15.70 lakhRs 15.70 lakh
10NARs 15.70 lakhRs 15.70 lakh
11NARs 15.70 lakhRs 15.70 lakh
12NARs 15.70 lakhRs 15.70 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVajubhai Chhanabhai Kantariya
EngineerKetav P.Joshi

Documents filed123

As listed on the registration, under the names the promoter filed them with; the newest 80 of 123 are shown. The files themselves are available at source: search the registration number PR/GJ/AHMEDABAD/SANAND/AUDA/RAA01265/090118 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)11 Dec 2021
Engineer's certificate (Form 2)11 Dec 2021
Engineer's certificate annexure11 Dec 2021
Accountant's certificate (Form 3)11 Dec 2021
Site photograph, 111 Dec 2021
Site photograph, 211 Dec 2021
Site photograph, 311 Dec 2021
Site photograph, 411 Dec 2021
Site photograph, 511 Dec 2021
Site photograph, 611 Dec 2021
Site photograph, 711 Dec 2021
Site photograph, 811 Dec 2021
Site photograph, 911 Dec 2021
Site photograph, 1011 Dec 2021
Site photograph, 1111 Dec 2021
Site photograph, 1211 Dec 2021
Site photograph, 1311 Dec 2021
Site photograph, 1411 Dec 2021
Site photograph, 1511 Dec 2021
Site photograph, 1611 Dec 2021
Site photograph, 1711 Dec 2021
Site photograph, 1811 Dec 2021
Site photograph, 1911 Dec 2021
Site photograph, 2011 Dec 2021
Site photograph, 2111 Dec 2021
Site photograph, 2211 Dec 2021
Site photograph, 2311 Dec 2021
Site photograph, 2411 Dec 2021
Site photograph, 2511 Dec 2021
Site photograph, 2611 Dec 2021
Site photograph, 2711 Dec 2021
Site photograph, 2811 Dec 2021
Site photograph, 2911 Dec 2021
Site photograph, 3011 Dec 2021
Site photograph, 3111 Dec 2021
Site photograph, 3211 Dec 2021
Site photograph, 3311 Dec 2021
Site photograph, 3411 Dec 2021
Site photograph, 3511 Dec 2021
Site photograph, 3611 Dec 2021
Site photograph, 3711 Dec 2021
Site photograph, 3811 Dec 2021
Site photograph, 3911 Dec 2021
Site photograph, 4011 Dec 2021
Site photograph, 4111 Dec 2021
Site photograph, 4211 Dec 2021
Site photograph, 4311 Dec 2021
Site photograph, 4411 Dec 2021
Site photograph, 4511 Dec 2021
Site photograph, 4611 Dec 2021
Site photograph, 4711 Dec 2021
Site photograph, 4811 Dec 2021
Site photograph, 4911 Dec 2021
Site photograph, 5011 Dec 2021
Site photograph, 5111 Dec 2021
Site photograph, 5211 Dec 2021
Site photograph, 5311 Dec 2021
Site photograph, 5411 Dec 2021
Site photograph, 5511 Dec 2021
Site photograph, 5611 Dec 2021
Site photograph, 5711 Dec 2021
Site photograph, 5811 Dec 2021
Site photograph, 5911 Dec 2021
Site photograph, 6011 Dec 2021
Site photograph, 6111 Dec 2021
Site photograph, 6211 Dec 2021
Site photograph, 6311 Dec 2021
Site photograph, 6411 Dec 2021
Site photograph, 6511 Dec 2021
Site photograph, 6611 Dec 2021
Site photograph, 6711 Dec 2021
Site photograph, 6811 Dec 2021
Site photograph, 6911 Dec 2021
Site photograph, 7011 Dec 2021
Site photograph, 7111 Dec 2021
Site photograph, 7211 Dec 2021
Site photograph, 7311 Dec 2021
Site photograph, 7411 Dec 2021
Site photograph, 7511 Dec 2021
Site photograph, 7611 Dec 2021

How this compares with Ahmedabad

88%of this project is bookeddistrict median 53%
14%of Ahmedabad projects moved their completion datethis one has not

Computed across the 5,400+ Ahmedabad projects on ReraGenie, from their own filings.

Keep Maruti Greenland on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Telav5,400+ in Ahmedabad

Builder: Meghavarsha Estate Developers Private Limited

Meghavarsha Estate Developers Private Limited has 1 registration on GujRERA, including Maruti Greenland. Read the full track record. See more projects on the Ahmedabad district page.

Frequently asked questions

What are my rights if Maruti Greenland is delayed beyond 31 Jul 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of Maruti Greenland?

The registered promoter entity is Meghavarsha Estate Developers Private Limited, a company as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in Maruti Greenland?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Maruti Greenland?

The professionals named in the filing: Architect: Vajubhai Chhanabhai Kantariya; Engineer: Ketav P.Joshi. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Maruti Greenland?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Maruti Greenland. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Maruti Greenland to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.