Home / Browse projects / Vadodara, Gujarat / Mangla Greens (Tower No. A-7 to A-13, B-8, 9, 20, 21)
Mangla Greens (Tower No. A-7 to A-13, B-8, 9, 20, 21)
By Manish Kiritbhai Patel ( Proprietor of Mangla Enterprise)
RG-GJ-46099 · RERA PR/GJ/VADODARA/VADODARA/Others/RAA00529/251017 · Last updated on GujRERA portal: 27 Dec 2021
Source: official GujRERA filing
Red flags
- No red flags in this filing
Clear
- Completion date never moved
- Separate project account declared
Saved.
Mangla Greens (Tower No. A-7 to A-13, B-8, 9, 20, 21) is a Residential/Group Housing project by Manish Kiritbhai Patel ( Proprietor of Mangla Enterprise) in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Others/RAA00529/251017 on 25 Oct 2017. Possession is promised by 30 Dec 2021. 194 of the 215 units on this registration are recorded sold or booked, and 88 of 88 construction stages are filed complete.
At a glance
Project
- NameMangla Greens (Tower No. A-7 to A-13, B-8, 9, 20, 21)
- TypeResidential/Group Housing
- Location
- Nr Uma Vidhayalaya
- Tarsali Vadodara
- Tarsali
- Vadodara
- 390010
- Pincode390010
- MapView location on Google Maps (as filed on RERA)
- RERA no.PR/GJ/VADODARA/VADODARA/Others/RAA00529/251017
- ReraGenie IDRG-GJ-46099
Builder
- NameManish Kiritbhai Patel ( Proprietor of Mangla Enterprise)
- Entity typeIndividual/Propritorship
Key dates
Key facts
Registration and timeline
- StatusValid until 30 Dec 2021
- Registered on25 Oct 2017
- Promised completion30 Dec 2021
- Revised completionNone
- Buildings11 building records
- Documents filed114 files
Current status
Figures as on 27 Dec 2021, this project's latest GujRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| B21 | - | - | - | 20 | 0 | 20 |
| A7 | - | - | - | 20 | 0 | 20 |
| A8 | - | - | - | 20 | 0 | 20 |
| A9 | - | - | - | 20 | 0 | 20 |
| A10 | - | - | - | 20 | 0 | 20 |
| A11 | - | - | - | 20 | 0 | 20 |
| A12 | - | - | - | 20 | 0 | 20 |
| A13 | - | - | - | 20 | 0 | 20 |
| B8 | - | - | - | 20 | 0 | 20 |
| B9 | - | - | - | 15 | 0 | 15 |
| B20 | - | - | - | 20 | 0 | 20 |
The full filing
Everything below is from the project's own GujRERA filing, free to read.
Construction progress by building11
As on 27 Dec 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
88 of 88 construction stages are filed complete across 11 buildings.
B21100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A7100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A8100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A9100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A10100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A11100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A12100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A13100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
B8100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
B9100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
B20100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
Progress on shared amenities19
As on 27 Dec 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal roads and footpaths | Yes | 100% |
| Water supply | Yes | 100% |
| Sewerage (chamber, lines, septic tank, STP) | Yes | 100% |
| Storm water drains | Yes | 100% |
| Landscaping and tree planting | Yes | 100% |
| Street lighting | Yes | 100% |
| Community buildings | Yes | 100% |
| Treatment and disposal of sewage and sullage water | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Water conservation, rain water harvesting | Yes | 100% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Fire fighting | No | Not applicable |
| Drinking water facilities | Yes | 100% |
| Emergency evacuation | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Security | No | Not applicable |
| Letter box | Yes | 100% |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A7 | NA | Rs 2.78 cr | Rs 2.68 cr |
| A8 | NA | Rs 2.78 cr | Rs 2.68 cr |
| A9 | NA | Rs 2.78 cr | Rs 2.68 cr |
| A10 | NA | Rs 2.78 cr | Rs 2.68 cr |
| A11 | NA | Rs 2.78 cr | Rs 2.68 cr |
| A12 | NA | Rs 2.78 cr | Rs 2.68 cr |
| A13 | NA | Rs 2.78 cr | Rs 2.68 cr |
| B8 | NA | Rs 2.78 cr | Rs 2.68 cr |
| B9 | NA | Rs 2.78 cr | Rs 2.68 cr |
| B20 | NA | Rs 2.78 cr | Rs 2.68 cr |
| B21 | NA | Rs 2.78 cr | Rs 2.68 cr |
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Kirit C Patel & Associates |
| Engineer | Hariyani Associates |
Documents filed114
As listed on the registration, under the names the promoter filed them with; the newest 80 of 114 are shown. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Others/RAA00529/251017 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect's certificate (Form 1) | 27 Dec 2021 |
| Engineer's certificate (Form 2) | 27 Dec 2021 |
| Engineer's certificate annexure | 27 Dec 2021 |
| Accountant's certificate (Form 3) | 27 Dec 2021 |
| Site photograph, B21 | 27 Dec 2021 |
| Site photograph, B21 | 27 Dec 2021 |
| Site photograph, B21 | 27 Dec 2021 |
| Site photograph, B21 | 27 Dec 2021 |
| Site photograph, B21 | 27 Dec 2021 |
| Site photograph, B21 | 27 Dec 2021 |
| Site photograph, B21 | 27 Dec 2021 |
| Site photograph, A7 | 27 Dec 2021 |
| Site photograph, A7 | 27 Dec 2021 |
| Site photograph, A7 | 27 Dec 2021 |
| Site photograph, A7 | 27 Dec 2021 |
| Site photograph, A7 | 27 Dec 2021 |
| Site photograph, A7 | 27 Dec 2021 |
| Site photograph, A7 | 27 Dec 2021 |
| Site photograph, A8 | 27 Dec 2021 |
| Site photograph, A8 | 27 Dec 2021 |
| Site photograph, A8 | 27 Dec 2021 |
| Site photograph, A8 | 27 Dec 2021 |
| Site photograph, A8 | 27 Dec 2021 |
| Site photograph, A8 | 27 Dec 2021 |
| Site photograph, A8 | 27 Dec 2021 |
| Site photograph, A9 | 27 Dec 2021 |
| Site photograph, A9 | 27 Dec 2021 |
| Site photograph, A9 | 27 Dec 2021 |
| Site photograph, A9 | 27 Dec 2021 |
| Site photograph, A9 | 27 Dec 2021 |
| Site photograph, A9 | 27 Dec 2021 |
| Site photograph, A9 | 27 Dec 2021 |
| Site photograph, A10 | 27 Dec 2021 |
| Site photograph, A10 | 27 Dec 2021 |
| Site photograph, A10 | 27 Dec 2021 |
| Site photograph, A10 | 27 Dec 2021 |
| Site photograph, A10 | 27 Dec 2021 |
| Site photograph, A10 | 27 Dec 2021 |
| Site photograph, A10 | 27 Dec 2021 |
| Site photograph, A11 | 27 Dec 2021 |
| Site photograph, A11 | 27 Dec 2021 |
| Site photograph, A11 | 27 Dec 2021 |
| Site photograph, A11 | 27 Dec 2021 |
| Site photograph, A11 | 27 Dec 2021 |
| Site photograph, A11 | 27 Dec 2021 |
| Site photograph, A11 | 27 Dec 2021 |
| Site photograph, A12 | 27 Dec 2021 |
| Site photograph, A12 | 27 Dec 2021 |
| Site photograph, A12 | 27 Dec 2021 |
| Site photograph, A12 | 27 Dec 2021 |
| Site photograph, A12 | 27 Dec 2021 |
| Site photograph, A12 | 27 Dec 2021 |
| Site photograph, A12 | 27 Dec 2021 |
| Site photograph, A13 | 27 Dec 2021 |
| Site photograph, A13 | 27 Dec 2021 |
| Site photograph, A13 | 27 Dec 2021 |
| Site photograph, A13 | 27 Dec 2021 |
| Site photograph, A13 | 27 Dec 2021 |
| Site photograph, A13 | 27 Dec 2021 |
| Site photograph, A13 | 27 Dec 2021 |
| Site photograph, B8 | 27 Dec 2021 |
| Site photograph, B8 | 27 Dec 2021 |
| Site photograph, B8 | 27 Dec 2021 |
| Site photograph, B8 | 27 Dec 2021 |
| Site photograph, B8 | 27 Dec 2021 |
| Site photograph, B8 | 27 Dec 2021 |
| Site photograph, B8 | 27 Dec 2021 |
| Site photograph, B9 | 27 Dec 2021 |
| Site photograph, B9 | 27 Dec 2021 |
| Site photograph, B9 | 27 Dec 2021 |
| Site photograph, B9 | 27 Dec 2021 |
| Site photograph, B9 | 27 Dec 2021 |
| Site photograph, B9 | 27 Dec 2021 |
| Site photograph, B9 | 27 Dec 2021 |
| Site photograph, B20 | 27 Dec 2021 |
| Site photograph, B20 | 27 Dec 2021 |
| Site photograph, B20 | 27 Dec 2021 |
| Site photograph, B20 | 27 Dec 2021 |
| Site photograph, B20 | 27 Dec 2021 |
| Site photograph, B20 | 27 Dec 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Vadodara
Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.
Keep Mangla Greens (Tower No. A-7 to A-13, B-8, 9 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Tarsali2,900+ in Vadodara
Filed coordinates, straight-line distance. 134 registered projects within 2 km.
Joyos Hubtown Vadodara
HUBTOWN BUS TERMINAL (VADODARA) PRIVATE LI
DREAM AATMAN
NEELA DEVELOPERS
SHALIGRAM HOMES AND SHALIGRAM SKYLINE
SHRI GANESH CONSTRUCTION
DIYA GRAND CITY
RIA REALITY
FORTUNE PRIME
VARNIRAJ REALTORS
VAKRATUND RESIDENCY
SHREE VAKRATUND DEVELOPERS
See every Vadodara project, with the district possession charts
Builder: Manish Kiritbhai Patel ( Proprietor of Mangla Enterprise)
Manish Kiritbhai Patel ( Proprietor of Mangla Enterprise) has 1 registration on GujRERA, including Mangla Greens (Tower No. A-7 to A-13, B-8, 9, 20, 21). Read the full track record. See more projects on the Vadodara district page.
Frequently asked questions
What are my rights if Mangla Greens (Tower No. A-7 to A-13, B-8, 9, 20, 21) is delayed beyond 30 Dec 2021?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.
How do I verify and contact the developer of Mangla Greens (Tower No. A-7 to A-13, B-8, 9, 20, 21)?
The registered promoter entity is Manish Kiritbhai Patel ( Proprietor of Mangla Enterprise), an individual/propritorship as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.
Is my payment protected in Mangla Greens (Tower No. A-7 to A-13, B-8, 9, 20, 21)?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Mangla Greens (Tower No. A-7 to A-13, B-8, 9, 20, 21)?
The professionals named in the filing: Architect: Kirit C Patel & Associates; Engineer: Hariyani Associates. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Mangla Greens (Tower No. A-7 to A-13, B-8, 9, 20, 21)?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.
Report an error Share feedback