ReraGenieLog inGet a buyer report

Home / Browse projects / Jamnagar, Gujarat / MAHA LAXMI GRAND

Valid until 31 Mar 2020 Residential/Group Housing project

MAHA LAXMI GRAND

By JAMNABEN NATHULAL LAVTI

RG-GJ-55620 · RERA PR/GJ/JAMNAGAR/JAMNAGAR/Others/RAA03622/EX1/181119 · Last updated on GujRERA portal: 28 Sep 2020

Source: official GujRERA filing

Red flags

  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • Separate project account declared
Mar 2020Possession promisedmoved 6 months from the original
90 of 90Construction stages doneacross 10 buildings; every applicable stage filed complete
5 of 10Units unsoldnot recorded sold or booked
Jump to the 47 documents Report an error

MAHA LAXMI GRAND is a Residential/Group Housing project by JAMNABEN NATHULAL LAVTI in Jamnagar, Gujarat, registered with GujRERA as PR/GJ/JAMNAGAR/JAMNAGAR/Others/RAA03622/EX1/181119 on 8 Oct 2018. Possession is promised by 31 Mar 2020. The completion date has moved by 6 months from the original filing. 5 of the 10 units on this registration are recorded sold or booked, and 90 of 90 construction stages are filed complete.

At a glance

Project

  • NameMAHA LAXMI GRAND
  • TypeResidential/Group Housing
  • Location
    • PLOT NO. 3. AND 4.
    • VALKESHWARI
    • Jamnagar
    • 361001
  • Pincode361001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/JAMNAGAR/JAMNAGAR/Others/RAA03622/EX1/181119
  • ReraGenie IDRG-GJ-55620

Builder

  • NameJAMNABEN NATHULAL LAVTI
  • Entity typeIndividual/Propritorship

Key dates

this monthRegisteredOct 2018First promiseSep 2019Revised toMar 2020

Key facts

Registration and timeline

  • StatusValid until 31 Mar 2020
  • Registered on8 Oct 2018
  • Promised completion31 Mar 2020
  • Revised completionRevised to 31 Mar 2020 (originally 30 Sep 2019)
  • Buildings10 building records
  • Documents filed47 files

Current status

50%5 of 10 units booked
99.1%Of the estimated cost spent so far

Figures as on 28 Sep 2020, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A201---101
B201---101
A301---101
B301---101
A401---101
B401---101
A501------
B501---101
A101---202
B101---101

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building10

As on 28 Sep 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

90 of 90 construction stages are filed complete across 10 buildings.

A201100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
B201100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A301100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
B301100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A401100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
B401100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A501100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
B501100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A101100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
B101100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 28 Sep 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsNoNot applicable
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes100%
Landscaping and tree plantingNoNot applicable
Street lightingNoNot applicable
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingNoNot applicable
Drinking water facilitiesYes100%
Emergency evacuationYes100%
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area506 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 1.88 cr
Cost incurredRs 1.86 cr
Spent of the estimate99.09%
BuildingWingEstimatedIncurred
A101NARs 18.75 lakhRs 18.58 lakh
B101NARs 18.75 lakhRs 18.58 lakh
A201NARs 18.75 lakhRs 18.58 lakh
B201NARs 18.75 lakhRs 18.58 lakh
A301NARs 18.75 lakhRs 18.58 lakh
B301NARs 18.75 lakhRs 18.58 lakh
A401NARs 18.75 lakhRs 18.58 lakh
B401NARs 18.75 lakhRs 18.58 lakh
A501NARs 18.75 lakhRs 18.58 lakh
B501NARs 18.75 lakhRs 18.58 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHAILESH H JOSHI
EngineerVARUN SUCHAK

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/JAMNAGAR/JAMNAGAR/Others/RAA03622/EX1/181119Applied Oct 2019; approved Nov 2019

Documents filed47

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/JAMNAGAR/JAMNAGAR/Others/RAA03622/EX1/181119 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer's certificate (Form 2)28 Sep 2020
Engineer's certificate annexure28 Sep 2020
Accountant's certificate (Form 3)28 Sep 2020
Architect's certificate (Form 1)27 Sep 2020
Site photograph, A20127 Sep 2020
Site photograph, B20127 Sep 2020
Site photograph, A30127 Sep 2020
Site photograph, B30127 Sep 2020
Site photograph, A40127 Sep 2020
Site photograph, B40127 Sep 2020
Site photograph, A50127 Sep 2020
Site photograph, B50127 Sep 2020
Site photograph, A10127 Sep 2020
Site photograph, B10127 Sep 2020
RERA registration certificate8 Oct 2018
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Jamnagar

50%of this project is bookeddistrict median 24%
7%of Jamnagar projects moved their completion datethis one moved by 6 months

Computed across the 220+ Jamnagar projects on ReraGenie, from their own filings.

Keep MAHA LAXMI GRAND on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Jamnagar220+ in Jamnagar

2 kmMAHA LAXMI GRANDOther 92Dot size: filed unitsN

Filed coordinates, straight-line distance. 92 registered projects within 2 km.

Builder: JAMNABEN NATHULAL LAVTI

JAMNABEN NATHULAL LAVTI has 1 registration on GujRERA, including MAHA LAXMI GRAND. Read the full track record. See more projects on the Jamnagar district page.

Frequently asked questions

What are my rights if MAHA LAXMI GRAND is delayed beyond 31 Mar 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of MAHA LAXMI GRAND?

The registered promoter entity is JAMNABEN NATHULAL LAVTI, an individual/propritorship as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in MAHA LAXMI GRAND?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at MAHA LAXMI GRAND?

The professionals named in the filing: Architect: SHAILESH H JOSHI; Engineer: VARUN SUCHAK. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAHA LAXMI GRAND?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAHA LAXMI GRAND. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAHA LAXMI GRAND to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one