MAA RESIDENCY

By GRM CONSTRUCTION

RG-GJ-34495 · RERA PR/GJ/BHARUCH/BHARUCH/Others/MAA07368/EX1/EX3/011026/291027 · Last updated on GujRERA portal: 1 Sep 2026

Source: official GujRERA filing

Red flags

  • Completion date moved by 40 months
  • 3 extensions taken

Clear

  • Nothing verified clear yet
Oct 2027Possession promisedmoved 40 months from the original
26 of 36Construction stages doneacross 4 buildings; furthest along: Internal walls, 95%
120 of 328Units unsoldnot recorded sold or booked
Jump to the 44 documents Report an error

MAA RESIDENCY is a Mixed Development project by GRM CONSTRUCTION in Bharuch, Gujarat, registered with GujRERA as PR/GJ/BHARUCH/BHARUCH/Others/MAA07368/EX1/EX3/011026/291027 on 24 Aug 2020. Possession is promised by 29 Oct 2027. The completion date has moved by 40 months from the original filing. 208 of the 328 units on this registration are recorded sold or booked, and 26 of 36 construction stages are filed complete.

At a glance

Project

  • NameMAA RESIDENCY
  • TypeMixed Development
  • Location
    • MAA RESIDENCY R.S. NO 38
    • RAHADPOR
    • Rahadpor
    • Bharuch
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/BHARUCH/BHARUCH/Others/MAA07368/EX1/EX3/011026/291027
  • ReraGenie IDRG-GJ-34495

Builder

  • NameGRM CONSTRUCTION
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredAug 2020First promiseJun 2024Revised toOct 2027

Key facts

Registration and timeline

  • StatusValid until 29 Oct 2027
  • Registered on24 Aug 2020
  • Promised completion29 Oct 2027
  • Revised completionRevised to 29 Oct 2027 (originally 30 Jun 2024)
  • Buildings4 building records
  • Documents filed44 files

Current status

63%208 of 328 units booked
96.3%Of the estimated cost spent so far

Figures as on 1 Sep 2026, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLOCK A B C D---741084
BLOCK E F G H---80080
BLOCK I J K L---80080
BLOCK M N O P---741084

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building4

As on 1 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

26 of 36 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 95%.

BLOCK A B C D89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BLOCK E F G H89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BLOCK I J K L83%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing50%
BLOCK M N O P65%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats95%
Sanitary fittings within the flats10%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing90%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%

Progress on shared amenities19

As on 1 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes50%
Water supplyYes75%
Sewerage (chamber, lines, septic tank, STP)Yes75%
Storm water drainsNoNot applicable
Landscaping and tree plantingYes50%
Street lightingYes50%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxYes50%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,576 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 16.67 cr
Cost incurredRs 16.05 cr
Spent of the estimate96.31%
BuildingWingEstimatedIncurred
BLOCK E F G HNARs 4.24 crRs 4.24 cr
BLOCK I J K LNARs 4.24 crRs 4.24 cr
BLOCK A B C DNARs 4.10 crRs 4.10 cr
BLOCK M N O PNARs 4.10 crRs 3.48 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBRIJKUMAR J. PATEL (BHUMI ARCHITECTS)
EngineerANILBHAI S. MISTRY

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/BHARUCH/BHARUCH/Others/MAA07368/EX1/020724/290625Applied May 2024; approved Jul 2024
PR/GJ/BHARUCH/BHARUCH/Others/MAA07368/EX1/EX2/091225/290626Applied Jun 2025; approved Dec 2025
PR/GJ/BHARUCH/BHARUCH/Others/MAA07368/EX1/EX3/011026/291027Applied Jun 2026; approved Oct 2026

Documents filed44

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/BHARUCH/BHARUCH/Others/MAA07368/EX1/EX3/011026/291027 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)1 Sep 2026
Architect's certificate (Form 1)31 Aug 2026
Engineer's certificate (Form 2)31 Aug 2026
Engineer's certificate annexure31 Aug 2026
Site photograph, BLOCK A B C D25 Aug 2026
Site photograph, BLOCK E F G H25 Aug 2026
Site photograph, BLOCK I J K L25 Aug 2026
Site photograph, BLOCK M N O P25 Aug 2026
RERA registration certificate24 Aug 2020
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Bharuch

63%of this project is bookeddistrict median 52%
20%of Bharuch projects moved their completion datethis one moved by 40 months

Computed across the 200+ Bharuch projects on ReraGenie, from their own filings.

Keep MAA RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Rahadpor200+ in Bharuch

2 kmMAA RESIDENCYOther 26Dot size: filed unitsN

Filed coordinates, straight-line distance. 26 registered projects within 2 km.

Builder: GRM CONSTRUCTION

GRM CONSTRUCTION has 1 registration on GujRERA, including MAA RESIDENCY. Read the full track record. See more projects on the Bharuch district page.

Frequently asked questions

What are my rights if MAA RESIDENCY is delayed beyond 29 Oct 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of MAA RESIDENCY?

The registered promoter entity is GRM CONSTRUCTION, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in MAA RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at MAA RESIDENCY?

The professionals named in the filing: Architect: BRIJKUMAR J. PATEL (BHUMI ARCHITECTS); Engineer: ANILBHAI S. MISTRY. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAA RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAA RESIDENCY. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAA RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.