Red flags

  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • Separate project account declared
Jun 2020Possession promisedmoved 6 months from the original
284 of 286Construction stages doneacross 82 buildings; furthest along: Internal walls, 90%
19 of 82Units unsoldnot recorded sold or booked
Jump to the 119 documents Report an error

Lavanya Banglows Phase-1 (Tena. No. 1 to 61, 145 to 166) is a Residential/Group Housing project by GURU REALITY in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Others/RAA00395/EX1/211219 on 10 Oct 2017. Possession is promised by 30 Jun 2020. The completion date has moved by 6 months from the original filing. 63 of the 82 units on this registration are recorded sold or booked, and 284 of 286 construction stages are filed complete.

At a glance

Project

  • NameLavanya Banglows Phase-1 (Tena. No. 1 to 61, 145 to 166)
  • TypeResidential/Group Housing
  • Location
    • ankhol
    • new waghodiya road
    • new waghodiya road
    • Ankhol
    • Vadodara
    • 390019
  • Pincode390019
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Others/RAA00395/EX1/211219
  • ReraGenie IDRG-GJ-18142

Builder

  • NameGURU REALITY
  • Entity typePARTNERSHIP FIRM
  • Other registrations1 more →

Key dates

this monthRegisteredOct 2017First promiseDec 2019Revised toJun 2020

Key facts

Registration and timeline

  • StatusValid until 30 Jun 2020
  • Registered on10 Oct 2017
  • Promised completion30 Jun 2020
  • Revised completionRevised to 30 Jun 2020 (originally 31 Dec 2019)
  • Buildings82 building records
  • Documents filed119 files

Current status

77%63 of 82 units booked
88.7%Of the estimated cost spent so far

Figures as on 31 Oct 2020, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B147---101
B163---101
B11---101
B32---101
B49---101
B148---101
B164---101
B12---101
B33---101
A50---101
B149---101
A165---101
B13---101
B34---101
B51---101
B150---101
B166---101
B14 15---101
B35---101
B52---101
B151---101
B24---101
B16---101
B36---101
B53---101
A152---101
B25---101
B17---101
B37---101
B54---101
A153---101
B26---101
B18---101
B38---101
A01---101
B19---101
B39---101
A55---101
B154---101
B02---101
B20---101
A40---101
A56---101
B155---101
B03---101
B21---101
A41---101
B57---101
B156---101
B04---101
A22---101
B42---101
B58---101
B157---101
B05---101
A23---101
B43---101
B59---101
A158---101
A06---101
B27---101
B44---101
B60---101
A159---101
A07---101
B28---101
B45---101
A61---101
B160---101
B08---101
B29---101
B46---101
A145---101
B161---101
B09---101
B30---101
B47---101
B146---101
B162---101
B10---101
B31---101
B48---101

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building20

As on 31 Oct 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 82 buildings; the table lists the first 20.

284 of 286 construction stages are filed complete across 82 buildings. The stage furthest along is Internal walls, at 90%.

B147100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
B163100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
B11100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
B32100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
B49100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
B148100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
B164100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
B12100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
B33100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
A50100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
B149100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
A165100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
B13100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
B34100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
B51100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
B150100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
B166100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
B14 15100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
B35100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
B52100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable

Progress on shared amenities19

As on 31 Oct 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyNoNot applicable
Sewerage (chamber, lines, septic tank, STP)NoNot applicable
Storm water drainsNoNot applicable
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsYes100%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes95%
Fire fightingNoNot applicable
Drinking water facilitiesYes90%
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityYes75%
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area20,086 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 15.72 cr
Cost incurredRs 13.94 cr
Spent of the estimate88.7%
BuildingWingEstimatedIncurred
A01NARs 19.17 lakhRs 17.00 lakh
B19NARs 19.17 lakhRs 17.00 lakh
B39NARs 19.17 lakhRs 17.00 lakh
A55NARs 19.17 lakhRs 17.00 lakh
B154NARs 19.17 lakhRs 17.00 lakh
B02NARs 19.17 lakhRs 17.00 lakh
B20NARs 19.17 lakhRs 17.00 lakh
A40NARs 19.17 lakhRs 17.00 lakh
A56NARs 19.17 lakhRs 17.00 lakh
B155NARs 19.17 lakhRs 17.00 lakh
B03NARs 19.17 lakhRs 17.00 lakh
B21NARs 19.17 lakhRs 17.00 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCHIRAG B PATEL Rishi Architect & Interior Designer
EngineerZarna Associates

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/VADODARA/VADODARA/Others/RAA00395/EX1/211219Applied Nov 2019; approved Dec 2019

Documents filed119

As listed on the registration, under the names the promoter filed them with; the newest 80 of 119 are shown. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Others/RAA00395/EX1/211219 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)31 Oct 2020
Engineer's certificate (Form 2)30 Oct 2020
Engineer's certificate annexure30 Oct 2020
Architect's certificate (Form 1)29 Oct 2020
Site photograph, B14729 Oct 2020
Site photograph, B16329 Oct 2020
Site photograph, B1129 Oct 2020
Site photograph, B3229 Oct 2020
Site photograph, B4929 Oct 2020
Site photograph, B14829 Oct 2020
Site photograph, B16429 Oct 2020
Site photograph, B1229 Oct 2020
Site photograph, B3329 Oct 2020
Site photograph, A5029 Oct 2020
Site photograph, B14929 Oct 2020
Site photograph, A16529 Oct 2020
Site photograph, B1329 Oct 2020
Site photograph, B3429 Oct 2020
Site photograph, B5129 Oct 2020
Site photograph, B15029 Oct 2020
Site photograph, B16629 Oct 2020
Site photograph, B14 1529 Oct 2020
Site photograph, B3529 Oct 2020
Site photograph, B5229 Oct 2020
Site photograph, B15129 Oct 2020
Site photograph, B2429 Oct 2020
Site photograph, B1629 Oct 2020
Site photograph, B3629 Oct 2020
Site photograph, B5329 Oct 2020
Site photograph, A15229 Oct 2020
Site photograph, B2529 Oct 2020
Site photograph, B1729 Oct 2020
Site photograph, B3729 Oct 2020
Site photograph, B5429 Oct 2020
Site photograph, A15329 Oct 2020
Site photograph, B2629 Oct 2020
Site photograph, B1829 Oct 2020
Site photograph, B3829 Oct 2020
Site photograph, A0129 Oct 2020
Site photograph, B1929 Oct 2020
Site photograph, B3929 Oct 2020
Site photograph, A5529 Oct 2020
Site photograph, B15429 Oct 2020
Site photograph, B0229 Oct 2020
Site photograph, B2029 Oct 2020
Site photograph, A4029 Oct 2020
Site photograph, A5629 Oct 2020
Site photograph, B15529 Oct 2020
Site photograph, B0329 Oct 2020
Site photograph, B2129 Oct 2020
Site photograph, A4129 Oct 2020
Site photograph, B5729 Oct 2020
Site photograph, B15629 Oct 2020
Site photograph, B0429 Oct 2020
Site photograph, A2229 Oct 2020
Site photograph, B4229 Oct 2020
Site photograph, B5829 Oct 2020
Site photograph, B15729 Oct 2020
Site photograph, B0529 Oct 2020
Site photograph, A2329 Oct 2020
Site photograph, B4329 Oct 2020
Site photograph, B5929 Oct 2020
Site photograph, A15829 Oct 2020
Site photograph, A0629 Oct 2020
Site photograph, B2729 Oct 2020
Site photograph, B4429 Oct 2020
Site photograph, B6029 Oct 2020
Site photograph, A15929 Oct 2020
Site photograph, A0729 Oct 2020
Site photograph, B2829 Oct 2020
Site photograph, B4529 Oct 2020
Site photograph, A6129 Oct 2020
Site photograph, B16029 Oct 2020
Site photograph, B0829 Oct 2020
Site photograph, B2929 Oct 2020
Site photograph, B4629 Oct 2020
Site photograph, A14529 Oct 2020
Site photograph, B16129 Oct 2020
Site photograph, B0929 Oct 2020
Site photograph, B3029 Oct 2020

How this compares with Vadodara

77%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one moved by 6 months

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep Lavanya Banglows Phase-1 (Tena. No. 1 to 61, on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Ankhol2,900+ in Vadodara

2 kmLavanya Banglows Phase-1Other 159Dot size: filed unitsN

Filed coordinates, straight-line distance. 159 registered projects within 2 km.

Builder: GURU REALITY

GURU REALITY has 2 registrations on GujRERA, including Lavanya Banglows Phase-1 (Tena. No. 1 to 61, 145 to 166) and LAVANYA BUNGALOWS PHASE-2 ( BUNGALOWS NO. 62 TO 144 ). Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if Lavanya Banglows Phase-1 (Tena. No. 1 to 61, 145 to 166) is delayed beyond 30 Jun 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of Lavanya Banglows Phase-1 (Tena. No. 1 to 61, 145 to 166)?

The registered promoter entity is GURU REALITY, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in Lavanya Banglows Phase-1 (Tena. No. 1 to 61, 145 to 166)?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Lavanya Banglows Phase-1 (Tena. No. 1 to 61, 145 to 166)?

The professionals named in the filing: Architect: CHIRAG B PATEL Rishi Architect & Interior Designer; Engineer: Zarna Associates. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Lavanya Banglows Phase-1 (Tena. No. 1 to 61, 145 to 166)?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Lavanya Banglows Phase-1 (Tena. No. 1 to 61, 145 to 166). Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Lavanya Banglows Phase-1 (Tena. No. 1 to 61, to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.