Home / Browse projects / Vadodara, Gujarat / Kailash Shikhar

Valid until 29 Jun 2022 Residential/Group Housing project

Kailash Shikhar

By KAILASH INFRATECH

RG-GJ-77104 · RERA PR/GJ/VADODARA/VADODARA/Others/RAA04877/EX2/170222 · Last updated on GujRERA portal: 27 Jun 2022

Source: official GujRERA filing

Red flags

  • Completion date moved by 30 months
  • 2 extensions taken

Clear

  • Nothing verified clear yet
Jun 2022Possession promisedmoved 30 months from the original
40 of 47Construction stages doneacross 7 buildings; furthest along: Installation of lifts, 98%
17 of 224Units unsoldnot recorded sold or booked
Jump to the 44 documents Report an error

Kailash Shikhar is a Residential/Group Housing project by KAILASH INFRATECH in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Others/RAA04877/EX2/170222 on 19 Feb 2019. Possession is promised by 29 Jun 2022. The completion date has moved by 30 months from the original filing. 207 of the 224 units on this registration are recorded sold or booked, and 40 of 47 construction stages are filed complete.

At a glance

Project

  • NameKailash Shikhar
  • TypeResidential/Group Housing
  • Location
    • Kailash Shikhar nr Pratham Upvan
    • Sun Pharma Road Atladara
    • Atladara
    • Vadodara
    • 390012
  • Pincode390012
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Others/RAA04877/EX2/170222
  • ReraGenie IDRG-GJ-77104

Builder

  • NameKAILASH INFRATECH
  • Entity typePARTNERSHIP FIRM
  • Other registrations1 more →

Key dates

this monthRegisteredFeb 2019First promiseDec 2019Revised toJun 2022

Key facts

Registration and timeline

  • StatusValid until 29 Jun 2022
  • Registered on19 Feb 2019
  • Promised completion29 Jun 2022
  • Revised completionRevised to 29 Jun 2022 (originally 31 Dec 2019)
  • Buildings7 building records
  • Documents filed44 files

Current status

92%207 of 224 units booked
98.8%Of the estimated cost spent so far

Figures as on 27 Jun 2022, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
E---32032
J---32032
K---32032
A---32032
B---32032
C---32032
D---32032

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building7

As on 27 Jun 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

40 of 47 construction stages are filed complete across 7 buildings. The stage furthest along is Installation of lifts, at 98%.

E99%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing96%
J98%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing90%
K99%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing95%
A100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing98%
B99%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing96%
C99%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing96%
D99%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing96%

Progress on shared amenities19

As on 27 Jun 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes100%
Landscaping and tree plantingYes100%
Street lightingYes80%
Community buildingsYes53%
Treatment and disposal of sewage and sullage waterYes100%
Solid waste management and disposalYes100%
Water conservation, rain water harvestingYes50%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes94%
Electrical meter room, sub-station, receiving stationYes65%
Fire fightingNoNot applicable
Drinking water facilitiesYes75%
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityYes60%
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area19,424 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 32.66 cr
Cost incurredRs 32.28 cr
Spent of the estimate98.85%
BuildingWingEstimatedIncurred
ANARs 4.67 crRs 4.61 cr
BNARs 4.67 crRs 4.61 cr
CNARs 4.67 crRs 4.61 cr
DNARs 4.67 crRs 4.61 cr
ENARs 4.67 crRs 4.61 cr
JNARs 4.67 crRs 4.61 cr
KNARs 4.67 crRs 4.61 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDesign Studio Associates Ar. Ruchir Sheth
EngineerZarna Associates

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/VADODARA/VADODARA/Others/RAA04877/EX1/160120Applied Dec 2019; approved Jan 2020
PR/GJ/VADODARA/VADODARA/Others/RAA04877/EX2/170222Applied Feb 2022; approved Feb 2022

Documents filed44

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Others/RAA04877/EX2/170222 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)27 Jun 2022
Engineer's certificate (Form 2)27 Jun 2022
Engineer's certificate annexure27 Jun 2022
Accountant's certificate (Form 3)27 Jun 2022
Site photograph, E27 Jun 2022
Site photograph, J27 Jun 2022
Site photograph, K27 Jun 2022
Site photograph, A27 Jun 2022
Site photograph, B27 Jun 2022
Site photograph, C27 Jun 2022
Site photograph, D27 Jun 2022
RERA registration certificate19 Feb 2019
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Vadodara

92%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one moved by 30 months

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep Kailash Shikhar on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Atladara2,900+ in Vadodara

2 kmKailash ShikharOther 352Dot size: filed unitsN

Filed coordinates, straight-line distance. 352 registered projects within 2 km.

Builder: KAILASH INFRATECH

KAILASH INFRATECH has 2 registrations on GujRERA, including Kailash Shikhar and Kailash Shikhar Phase-2. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if Kailash Shikhar is delayed beyond 29 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of Kailash Shikhar?

The registered promoter entity is KAILASH INFRATECH, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in Kailash Shikhar?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Kailash Shikhar?

The professionals named in the filing: Architect: Design Studio Associates Ar. Ruchir Sheth; Engineer: Zarna Associates. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kailash Shikhar?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kailash Shikhar. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kailash Shikhar to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.