ReraGenieLog inGet a buyer report

Home / Browse projects / Surat, Gujarat / HALIMA HEIGHTS

Valid until 30 Apr 2029 Mixed Development project

HALIMA HEIGHTS

By HINGORA INFRASTRUCTURE LIMITED

RG-GJ-07008 · RERA PR/GJ/SURAT/SURAT CITY/SUDA/MAA09892/070322 · Last updated on GujRERA portal: 27 Dec 2022

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Apr 2029Possession promisedno revision filed
9 of 27Construction stages doneacross 3 buildings; furthest along: Plinth, 60%
352 of 378Units unsoldnot recorded sold or booked
Jump to the 38 documents Report an error

HALIMA HEIGHTS is a Mixed Development project by HINGORA INFRASTRUCTURE LIMITED in Surat, Gujarat, registered with GujRERA as PR/GJ/SURAT/SURAT CITY/SUDA/MAA09892/070322 on 7 Mar 2022. Possession is promised by 30 Apr 2029. 26 of the 378 units on this registration are recorded sold or booked, and 9 of 27 construction stages are filed complete.

At a glance

Project

  • NameHALIMA HEIGHTS
  • TypeMixed Development
  • Location
    • BLOCK NO.-264
    • F.P .NO- 402 SUB PLOT NO.-2
    • T.P NO.- 67
    • JIAV- SONAREI- GABHENI
    • Surat City
    • Surat
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/SURAT/SURAT CITY/SUDA/MAA09892/070322
  • ReraGenie IDRG-GJ-07008

Builder

  • NameHINGORA INFRASTRUCTURE LIMITED
  • Entity typeCOMPANY
  • Other registrations1 more →

Key dates

this monthRegisteredMar 2022PromisedApr 2029

Key facts

Registration and timeline

  • StatusValid until 30 Apr 2029
  • Registered on7 Mar 2022
  • Promised completion30 Apr 2029
  • Revised completionNone
  • Buildings3 building records
  • Documents filed38 files

Current status

7%26 of 378 units booked
10.0%Of the estimated cost spent so far

Figures as on 27 Dec 2022, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---14412156
B---1448152
C---66470

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building3

As on 27 Dec 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 27 construction stages are filed complete across 3 buildings. The stage furthest along is Plinth, at 60%.

A19%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth60%
Stilt Floor0%
Slabs of Super Structure8%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
B0%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
C89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing5%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities23

As on 27 Dec 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes30%
Water supplyYes30%
Sewerage (chamber, lines, septic tank, STP)Yes30%
Storm water drainsNoNot applicable
Landscaping and tree plantingYes30%
Street lightingYes30%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterYes0%
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable
Compound wallYes30%
Plinth protectionNoNot applicable
Water tankNoNot applicable
Other requirementsYes0%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,626 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 11.25 cr
Cost incurredRs 1.12 cr
Spent of the estimate10.0%
BuildingWingEstimatedIncurred
ANARs 3.75 crRs 37.50 lakh
BNARs 3.75 crRs 37.50 lakh
CNARs 3.75 crRs 37.50 lakh

Documents filed38

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/SURAT/SURAT CITY/SUDA/MAA09892/070322 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer's certificate (Form 2)27 Dec 2022
Engineer's certificate annexure27 Dec 2022
RERA registration certificate7 Mar 2022
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Surat

7%of this project is bookeddistrict median 39%
15%of Surat projects moved their completion datethis one has not

Computed across the 2,600+ Surat projects on ReraGenie, from their own filings.

Keep HALIMA HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Surat2,600+ in Surat

2 kmHALIMA HEIGHTSOther 49Dot size: filed unitsN

Filed coordinates, straight-line distance. 49 registered projects within 2 km.

Builder: HINGORA INFRASTRUCTURE LIMITED

HINGORA INFRASTRUCTURE LIMITED has 2 registrations on GujRERA, including HALIMA RESIDENCY and HALIMA HEIGHTS. Read the full track record. See more projects on the Surat district page.

Frequently asked questions

What are my rights if HALIMA HEIGHTS is delayed beyond 30 Apr 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of HALIMA HEIGHTS?

The registered promoter entity is HINGORA INFRASTRUCTURE LIMITED, a company as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in HALIMA HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in HALIMA HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HALIMA HEIGHTS. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HALIMA HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.