Home / Browse projects / Ahmedabad, Gujarat / GREEN VALLEY

Valid until 31 May 2022 Mixed Development project

GREEN VALLEY

By AASTHA PROPERTIES

RG-GJ-79215 · RERA PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/MAA02531/EX1/A1M/070522 · Last updated on GujRERA portal: 31 May 2022

Source: official GujRERA filing

Red flags

  • Completion date moved by 11 months
  • 1 extension taken

Clear

  • Separate project account declared
May 2022Possession promisedmoved 11 months from the original
16 of 16Construction stages doneacross 2 buildings; every applicable stage filed complete
58 of 126Units unsoldnot recorded sold or booked
Jump to the 39 documents Report an error

GREEN VALLEY is a Mixed Development project by AASTHA PROPERTIES in Ahmedabad, Gujarat, registered with GujRERA as PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/MAA02531/EX1/A1M/070522 on 26 Apr 2018. Possession is promised by 31 May 2022. The completion date has moved by 11 months from the original filing. 68 of the 126 units on this registration are recorded sold or booked, and 16 of 16 construction stages are filed complete.

At a glance

Project

  • NameGREEN VALLEY
  • TypeMixed Development
  • Location
    • GREEN VALLEY
    • OPP. OLD PILOT DAIRY
    • OPP. BRAHMAKUMARI MANDIR
    • KANKARIA
    • MANINAGAR
    • Ahmedabad City
    • Ahmedabad
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/MAA02531/EX1/A1M/070522
  • ReraGenie IDRG-GJ-79215

Builder

  • NameAASTHA PROPERTIES
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredApr 2018First promiseJun 2021Revised toMay 2022

Key facts

Registration and timeline

  • StatusValid until 31 May 2022
  • Registered on26 Apr 2018
  • Promised completion31 May 2022
  • Revised completionRevised to 31 May 2022 (originally 7 Jun 2021)
  • Buildings2 building records
  • Documents filed39 files

Current status

54%68 of 126 units booked
100.0%Of the estimated cost spent so far

Figures as on 31 May 2022, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---56561
B---65065

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building2

As on 31 May 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 16 construction stages are filed complete across 2 buildings.

A100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
B100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 31 May 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes100%
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterYes100%
Solid waste management and disposalYes100%
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingYes100%
Drinking water facilitiesYes100%
Emergency evacuationYes100%
Use of renewable energyNoNot applicable
SecurityYes100%
Letter boxYes100%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,717 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 7.42 cr
Cost incurredRs 7.42 cr
Spent of the estimate100.0%
BuildingWingEstimatedIncurred
ANARs 3.71 crRs 3.71 cr
BNARs 3.71 crRs 3.71 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architect99 STUDIO
EngineerVIREN D PARIKH (PCUBE CONSULTANTS)

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/MAA02531/EX1/300721Applied Jun 2021; approved Jul 2021

Documents filed39

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/MAA02531/EX1/A1M/070522 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)31 May 2022
Engineer's certificate (Form 2)31 May 2022
Engineer's certificate annexure31 May 2022
Accountant's certificate (Form 3)31 May 2022
Site photograph, A31 May 2022
Site photograph, B31 May 2022
RERA registration certificate26 Apr 2018
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Ahmedabad

54%of this project is bookeddistrict median 53%
14%of Ahmedabad projects moved their completion datethis one moved by 11 months

Computed across the 5,400+ Ahmedabad projects on ReraGenie, from their own filings.

Keep GREEN VALLEY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Ahmedabad5,400+ in Ahmedabad

2 kmGREEN VALLEYOther 134Dot size: filed unitsN

Filed coordinates, straight-line distance. 134 registered projects within 2 km.

Builder: AASTHA PROPERTIES

AASTHA PROPERTIES has 1 registration on GujRERA, including GREEN VALLEY. Read the full track record. See more projects on the Ahmedabad district page.

Frequently asked questions

What are my rights if GREEN VALLEY is delayed beyond 31 May 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of GREEN VALLEY?

The registered promoter entity is AASTHA PROPERTIES, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in GREEN VALLEY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at GREEN VALLEY?

The professionals named in the filing: Architect: 99 STUDIO; Engineer: VIREN D PARIKH (PCUBE CONSULTANTS). Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GREEN VALLEY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GREEN VALLEY. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GREEN VALLEY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.