Valid until 28 Sep 2020 Residential/Group Housing project

GOKULDHAM RESIDENCY - II

By SHREE SIDDHIVINAYAK DEVELOPERS`

RG-GJ-14677 · RERA PR/GJ/VADODARA/VADODARA/Others/RAA03965/EX1/260919 · Last updated on GujRERA portal: 5 Mar 2021

Source: official GujRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Separate project account declared
Sep 2020Possession promisedmoved 12 months from the original
32 of 32Construction stages doneacross 5 buildings; every applicable stage filed complete
5 of 106Units unsoldnot recorded sold or booked
Jump to the 42 documents Report an error

GOKULDHAM RESIDENCY - II is a Residential/Group Housing project by SHREE SIDDHIVINAYAK DEVELOPERS` in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Others/RAA03965/EX1/260919 on 5 Nov 2018. Possession is promised by 28 Sep 2020. The completion date has moved by 12 months from the original filing. 101 of the 106 units on this registration are recorded sold or booked, and 32 of 32 construction stages are filed complete.

At a glance

Project

  • NameGOKULDHAM RESIDENCY - II
  • TypeResidential/Group Housing
  • Location
    • GOKULDHAM RESIDENCY II
    • KOYALI SHERKHI ROAD
    • KOYALI
    • Koyali
    • Vadodara
    • 391330
  • Pincode391330
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Others/RAA03965/EX1/260919
  • ReraGenie IDRG-GJ-14677

Builder

  • NameSHREE SIDDHIVINAYAK DEVELOPERS`
  • Entity typePARTNERSHIP FIRM
  • Other registrations6 more →

Key dates

this monthRegisteredNov 2018First promiseSep 2019Revised toSep 2020

Key facts

Registration and timeline

  • StatusValid until 28 Sep 2020
  • Registered on5 Nov 2018
  • Promised completion28 Sep 2020
  • Revised completionRevised to 28 Sep 2020 (originally 28 Sep 2019)
  • Buildings5 building records
  • Documents filed42 files

Current status

95%101 of 106 units booked
100.0%Of the estimated cost spent so far

Figures as on 5 Mar 2021, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---32032
B---10010
C---101
A1---60060
A2---303

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building5

As on 5 Mar 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

32 of 32 construction stages are filed complete across 5 buildings.

A100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
B100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
C100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A1100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A2100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 5 Mar 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes100%
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsYes100%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes100%
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area15,755 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 6.87 cr
Cost incurredRs 6.87 cr
Spent of the estimate100.0%
BuildingWingEstimatedIncurred
ANARs 1.37 crRs 1.37 cr
BNARs 1.37 crRs 1.37 cr
CNARs 1.37 crRs 1.37 cr
A1NARs 1.37 crRs 1.37 cr
A2NARs 1.37 crRs 1.37 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHITESH ENGINEERS
EngineerHARIYANI ASSOCIATES

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/VADODARA/VADODARA/Others/RAA03965/EX1/260919Applied Sep 2019; approved Sep 2019

Documents filed42

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Others/RAA03965/EX1/260919 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)5 Mar 2021
Engineer's certificate (Form 2)5 Mar 2021
Engineer's certificate annexure5 Mar 2021
Accountant's certificate (Form 3)5 Mar 2021
Site photograph, A5 Mar 2021
Site photograph, B5 Mar 2021
Site photograph, C5 Mar 2021
Site photograph, A15 Mar 2021
Site photograph, A25 Mar 2021
RERA registration certificate5 Nov 2018
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Vadodara

95%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one moved by 12 months

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep GOKULDHAM RESIDENCY - II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Koyali2,900+ in Vadodara

2 kmGOKULDHAM RESIDENCY - IIOther 10Dot size: filed unitsN

Filed coordinates, straight-line distance. 10 registered projects within 2 km.

Builder: SHREE SIDDHIVINAYAK DEVELOPERS`

Shree Siddhivinayak Developers has 7 registrations on GujRERA, including Maple Villas and GOKULDHAM RESIDENCY - II. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if GOKULDHAM RESIDENCY - II is delayed beyond 28 Sep 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of GOKULDHAM RESIDENCY - II?

The registered promoter entity is SHREE SIDDHIVINAYAK DEVELOPERS`, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in GOKULDHAM RESIDENCY - II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at GOKULDHAM RESIDENCY - II?

The professionals named in the filing: Architect: HITESH ENGINEERS; Engineer: HARIYANI ASSOCIATES. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GOKULDHAM RESIDENCY - II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GOKULDHAM RESIDENCY - II. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GOKULDHAM RESIDENCY - II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.