Home / Browse projects / Vadodara, Gujarat / GOKUL DUPLEX

Valid until 11 Oct 2022 Residential/Group Housing project

GOKUL DUPLEX

By GOKUL DEVELOPERS

RG-GJ-08336 · RERA PR/GJ/VADODARA/VADODARA/Others/RAA00137/120917 · Last updated on GujRERA portal: 29 Sep 2021

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Oct 2022Possession promisedno revision filed
1547 of 1591Construction stages doneacross 177 buildings; furthest along: External plumbing and external plaster, 95%
7 of 176Units unsoldnot recorded sold or booked
Jump to the 214 documents Report an error

GOKUL DUPLEX is a Residential/Group Housing project by GOKUL DEVELOPERS in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Others/RAA00137/120917 on 12 Sep 2017. Possession is promised by 11 Oct 2022. 169 of the 176 units on this registration are recorded sold or booked, and 1547 of 1591 construction stages are filed complete.

At a glance

Project

  • NameGOKUL DUPLEX
  • TypeResidential/Group Housing
  • Location
    • T.P scheme no.35
    • F.P no.114/p/6 and 7
    • behind parabia compound
    • Jambua
    • Jambua
    • Vadodara
    • 390013
  • Pincode390013
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Others/RAA00137/120917
  • ReraGenie IDRG-GJ-08336

Builder

  • NameGOKUL DEVELOPERS
  • Entity typePARTNERSHIP FIRM
  • Other registrations6 more →

Key dates

this monthRegisteredSep 2017PromisedOct 2022

Key facts

Registration and timeline

  • StatusValid until 11 Oct 2022
  • Registered on12 Sep 2017
  • Promised completion11 Oct 2022
  • Revised completionNone
  • Buildings177 building records
  • Documents filed214 files

Current status

96%169 of 176 units booked
80.8%Of the estimated cost spent so far

Figures as on 29 Sep 2021, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A 5---101
A 6---101
A 7---101
A 8---101
A1 9---101
A1 10---101
A 11---101
A 12---101
A 13---101
A 14---101
A 15---101
A 16---101
A1 17---101
A1 18---101
A 19---101
A 20---101
A 21---101
A 22---101
A1 23---101
A 24---101
A 25---101
A 26---101
A 27---101
A 28---101
A 29---101
A 30---101
A 31---101
A1 32---101
A 55------
B1 85---101
C 86---101
C 87---101
C 88---101
C 89---101
C 90---101
C 91---101
C 92---101
C 93---101
C 94---101
C 95---101
C 96---101
C 97---101
B1 98---101
B 108---101
B 109---101
B 110---101
B 111---101
B 112---101
B 113---101
B 114---101
B 115---101
B1 116---101
B1 117---101
C 118---101
C 119---101
C 120---101
C 121---101
C 122---101
C 123---101
C 124---101
C 125---101
C 126---101
C 127---101
C 128---101
C 129---101
B1 130---101
B1 131---101
C 132---101
C 133---101
C 134---101
C 135---101
C 136---101
C 137---101
C 138---101
C 139---101
C 140---101
C 141---101
C 142---101
C 143---101
B1 144---101
B1 145---101
B 146---101
B 147---101
B 148---101
B 149---101
B 150---101
B 151---101
B 152---101
B 153---101
B 154---101
B 155---101
B 156---101
B 157---101
B 158---101
B 159---101
B 160---101
B 161---101
B1 162---101
B1 163---101
B 164---101
B 165---101
B 166---101
B 167---101
B1 168---101
B1 169---101
B 170---101
B 171---101
B 172---101
B 173---101
B1 174---101
B1 175---101
B 176---101
B 177---101
B 178---101
B 179---101
B1 180---101
B1 181---101
B 182---101
B 183---101
B 184---101
B 185---101
B1 186---101
B1 187---101
B 188---101
B 189---101
B 190---101
B 191---101
B 192---101
B 193---101
B 194---101
B 195---101
B 196---101
B 197---101
B 198---101
B 199---101
B 200---101
B 201---101
B 202---101
B 203---101
B1 204---101
B1 205---101
B 206---101
B 207---101
B 208---101
B 209---101
B1 210---101
B1 211---101
B 212---101
B 213---101
B 214---101
B 215---101
B1 216---101
B1 217---101
B 218---101
B 219---101
B1 220---101
B1 221---101
B 222---101
B 223---101
B1 224---101
B1 225---101
B 226---101
B 227---101
B1 228---101
B1 229---101
B 230---101
B 231---101
B 232---101
B 233---101
B 234---101
B 235---101
B 236---101
B 237---101
A 1---101
A 2---101
A 3---101
A 4---101

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building20

As on 29 Sep 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 177 buildings; the table lists the first 20.

1547 of 1591 construction stages are filed complete across 177 buildings. The stage furthest along is External plumbing and external plaster, at 95%.

A 5100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A 6100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A 7100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A 8100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A1 9100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A1 10100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A 11100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A 12100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A 13100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A 14100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A 1598%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats90%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing90%
A 16100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A1 17100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A1 18100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A 19100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A 20100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A 21100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A 22100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A1 23100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A 24100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 29 Sep 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes100%
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area21,700 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 17.80 cr
Cost incurredRs 14.37 cr
Spent of the estimate80.76%
BuildingWingEstimatedIncurred
A 1NARs 10.05 lakhRs 8.12 lakh
A 2NARs 10.05 lakhRs 8.12 lakh
A 3NARs 10.05 lakhRs 8.12 lakh
A 4NARs 10.05 lakhRs 8.12 lakh
A 5NARs 10.05 lakhRs 8.12 lakh
A 6NARs 10.05 lakhRs 8.12 lakh
A 7NARs 10.05 lakhRs 8.12 lakh
A 8NARs 10.05 lakhRs 8.12 lakh
A1 9NARs 10.05 lakhRs 8.12 lakh
A1 10NARs 10.05 lakhRs 8.12 lakh
A 11NARs 10.05 lakhRs 8.12 lakh
A 12NARs 10.05 lakhRs 8.12 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARYA ASSOCIATES
EngineerASHOK SHAH AND ASSOCIATES

Documents filed214

As listed on the registration, under the names the promoter filed them with; the newest 80 of 214 are shown. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Others/RAA00137/120917 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)29 Sep 2021
Architect's certificate (Form 1)28 Sep 2021
Engineer's certificate (Form 2)28 Sep 2021
Engineer's certificate annexure28 Sep 2021
Site photograph, B 11228 Sep 2021
Site photograph, B 11328 Sep 2021
Site photograph, B 11428 Sep 2021
Site photograph, B 11528 Sep 2021
Site photograph, B1 11628 Sep 2021
Site photograph, B1 11728 Sep 2021
Site photograph, C 11828 Sep 2021
Site photograph, C 11928 Sep 2021
Site photograph, C 12028 Sep 2021
Site photograph, C 12128 Sep 2021
Site photograph, C 12228 Sep 2021
Site photograph, C 12328 Sep 2021
Site photograph, C 12428 Sep 2021
Site photograph, C 12528 Sep 2021
Site photograph, C 12628 Sep 2021
Site photograph, C 12728 Sep 2021
Site photograph, C 12828 Sep 2021
Site photograph, C 12928 Sep 2021
Site photograph, B1 13028 Sep 2021
Site photograph, B1 13128 Sep 2021
Site photograph, C 13228 Sep 2021
Site photograph, C 13328 Sep 2021
Site photograph, C 13428 Sep 2021
Site photograph, C 13528 Sep 2021
Site photograph, C 13628 Sep 2021
Site photograph, C 13728 Sep 2021
Site photograph, C 13828 Sep 2021
Site photograph, C 13928 Sep 2021
Site photograph, C 14028 Sep 2021
Site photograph, C 14128 Sep 2021
Site photograph, C 14228 Sep 2021
Site photograph, C 14328 Sep 2021
Site photograph, B1 14428 Sep 2021
Site photograph, B1 14528 Sep 2021
Site photograph, B 14628 Sep 2021
Site photograph, B 14728 Sep 2021
Site photograph, B 14828 Sep 2021
Site photograph, B 14928 Sep 2021
Site photograph, B 15028 Sep 2021
Site photograph, B 15128 Sep 2021
Site photograph, B 15228 Sep 2021
Site photograph, B 15328 Sep 2021
Site photograph, B 15428 Sep 2021
Site photograph, B 15528 Sep 2021
Site photograph, B 15628 Sep 2021
Site photograph, B 15728 Sep 2021
Site photograph, B 15828 Sep 2021
Site photograph, B 15928 Sep 2021
Site photograph, B 16028 Sep 2021
Site photograph, B 16128 Sep 2021
Site photograph, B1 16228 Sep 2021
Site photograph, B1 16328 Sep 2021
Site photograph, B 16428 Sep 2021
Site photograph, B 16528 Sep 2021
Site photograph, B 16628 Sep 2021
Site photograph, B 16728 Sep 2021
Site photograph, B1 16828 Sep 2021
Site photograph, B1 16928 Sep 2021
Site photograph, B 17028 Sep 2021
Site photograph, B 17128 Sep 2021
Site photograph, B 17228 Sep 2021
Site photograph, B 17328 Sep 2021
Site photograph, B1 17428 Sep 2021
Site photograph, B1 17528 Sep 2021
Site photograph, B 17628 Sep 2021
Site photograph, B 17728 Sep 2021
Site photograph, B 17828 Sep 2021
Site photograph, B 17928 Sep 2021
Site photograph, B1 18028 Sep 2021
Site photograph, B1 18128 Sep 2021
Site photograph, B 18228 Sep 2021
Site photograph, B 18328 Sep 2021
Site photograph, B 18428 Sep 2021
Site photograph, B 18528 Sep 2021
Site photograph, B1 18628 Sep 2021
Site photograph, B1 18728 Sep 2021

How this compares with Vadodara

96%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one has not

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep GOKUL DUPLEX on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Jambua2,900+ in Vadodara

2 kmGOKUL DUPLEXOther 52Dot size: filed unitsN

Filed coordinates, straight-line distance. 52 registered projects within 2 km.

Builder: GOKUL DEVELOPERS

GOKUL DEVELOPERS has 7 registrations on GujRERA, including RADHE RESIDENCY and RADHE RESIDENCY-II. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if GOKUL DUPLEX is delayed beyond 11 Oct 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of GOKUL DUPLEX?

The registered promoter entity is GOKUL DEVELOPERS, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in GOKUL DUPLEX?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at GOKUL DUPLEX?

The professionals named in the filing: Architect: ARYA ASSOCIATES; Engineer: ASHOK SHAH AND ASSOCIATES. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GOKUL DUPLEX?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GOKUL DUPLEX. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GOKUL DUPLEX to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.