Valid until 30 Apr 2028 Residential/Group Housing project

Empire Villa

By MRR BUILDCON

RG-GJ-34174 · RERA PR/GJ/VADODARA/VADODARA/Vadodara Municipal Corporation/RN57AA09957/A1R/060724/311227 · Last updated on GujRERA portal: 2 Nov 2026

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Apr 2028Possession promisedno revision filed
58 of 81Construction stages doneacross 9 buildings; furthest along: External plumbing and external plaster, 95%
19 of 102Units unsoldnot recorded sold or booked
Jump to the 34 documents Report an error

Empire Villa is a Residential/Group Housing project by MRR BUILDCON in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Vadodara Municipal Corporation/RN57AA09957/A1R/060724/311227 on 3 Jun 2022. Possession is promised by 30 Apr 2028. 83 of the 102 units on this registration are recorded sold or booked, and 58 of 81 construction stages are filed complete.

At a glance

Project

  • NameEmpire Villa
  • TypeResidential/Group Housing
  • Location
    • Empire Villa
    • Behind Empire Flora
    • Opp Nayara Pump
    • Sama Savli Road
    • Chhani
    • Vadodara
    • 390024
  • Pincode390024
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Vadodara Municipal Corporation/RN57AA09957/A1R/060724/311227
  • ReraGenie IDRG-GJ-34174

Builder

  • NameMRR BUILDCON
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredJun 2022PromisedApr 2028

Key facts

Registration and timeline

  • StatusValid until 30 Apr 2028
  • Registered on3 Jun 2022
  • Promised completion30 Apr 2028
  • Revised completionNone
  • Buildings9 building records
  • Documents filed34 files

Current status

81%83 of 102 units booked
83.0%Of the estimated cost spent so far

Figures as on 2 Nov 2026, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A (5Unilts)---505
A1(5 Units)---505
A(Tower)---56056
B1(8 Units)---808
B(7 Units)---707
C1(4 Units)---404
C(4 Units)---404
D1 (6 Units)---606
D (7 Units)---707

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building9

As on 2 Nov 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

58 of 81 construction stages are filed complete across 9 buildings. The stage furthest along is External plumbing and external plaster, at 95%.

A (5Unilts)87%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats20%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing95%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing75%
A1(5 Units)95%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats80%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing75%
A(Tower)86%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats95%
Sanitary fittings within the flats20%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing90%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing75%
B1(8 Units)93%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats65%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing75%
B(7 Units)91%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats45%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing75%
C1(4 Units)88%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats20%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing75%
C(4 Units)88%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats20%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing75%
D1 (6 Units)88%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats20%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing75%
D (7 Units)88%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats20%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing75%

Progress on shared amenities19

As on 2 Nov 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes50%
Water supplyYes0%
Sewerage (chamber, lines, septic tank, STP)Yes0%
Storm water drainsYes0%
Landscaping and tree plantingYes0%
Street lightingYes0%
Community buildingsYes50%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes0%
Water conservation, rain water harvestingYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Fire fightingYes0%
Drinking water facilitiesYes0%
Emergency evacuationYes0%
Use of renewable energyYes0%
SecurityYes0%
Letter boxYes0%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,595 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 41.08 cr
Cost incurredRs 34.10 cr
Spent of the estimate83.0%
BuildingWingEstimatedIncurred
A(Tower)NARs 27.50 crRs 21.87 cr
B1(8 Units)NARs 2.72 crRs 2.44 cr
B(7 Units)NARs 2.44 crRs 2.20 cr
D (7 Units)NARs 1.90 crRs 1.71 cr
D1 (6 Units)NARs 1.63 crRs 1.47 cr
A (5Unilts)NARs 1.36 crRs 1.22 cr
A1(5 Units)NARs 1.36 crRs 1.22 cr
C(4 Units)NARs 1.09 crRs 97.81 lakh
C1(4 Units)NARs 1.09 crRs 97.81 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRuchir Manojbhai Sheth
EngineerHITESH HASMUKHLAL VORA

Documents filed34

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Vadodara Municipal Corporation/RN57AA09957/A1R/060724/311227 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)2 Nov 2026
Architect's certificate (Form 1)31 Oct 2026
Engineer's certificate (Form 2)31 Oct 2026
Engineer's certificate annexure31 Oct 2026
Site photograph, A (5Unilts)31 Oct 2026
Site photograph, A1(5 Units)31 Oct 2026
Site photograph, A(Tower)31 Oct 2026
Site photograph, B1(8 Units)31 Oct 2026
Site photograph, B(7 Units)31 Oct 2026
Site photograph, C1(4 Units)31 Oct 2026
Site photograph, C(4 Units)31 Oct 2026
Site photograph, D1 (6 Units)31 Oct 2026
Site photograph, D (7 Units)31 Oct 2026
RERA registration certificate3 Jun 2022
Alteration certificate-
Proforma agreement for sale-
Project specific document-
Drainage affidavit-
Approved sanctioned plan-
Approved layout plan-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Declaration in Form B-
Declaration in Form B1-
Declaration in Form B2-
Approved building or plotting plan-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Proforma sale deed-

How this compares with Vadodara

81%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one has not

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep Empire Villa on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Chhani2,900+ in Vadodara

2 kmEmpire VillaOther 148Dot size: filed unitsN

Filed coordinates, straight-line distance. 148 registered projects within 2 km.

Builder: MRR BUILDCON

MRR BUILDCON has 1 registration on GujRERA, including Empire Villa. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if Empire Villa is delayed beyond 30 Apr 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of Empire Villa?

The registered promoter entity is MRR BUILDCON, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in Empire Villa?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Empire Villa?

The professionals named in the filing: Architect: Ruchir Manojbhai Sheth; Engineer: HITESH HASMUKHLAL VORA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Empire Villa?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Empire Villa. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Empire Villa to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.