Home / Browse projects / Dharwad, Karnataka / DHARWAD BUSINESS CENTRE

Registration approved Commercial project

DHARWAD BUSINESS CENTRE

By SOLITAIRE INFRA

RG-KA-47495 · RERA PRM/KA/RERA/1259/410/PR/180521/001780

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Mar 2022Possession promisedmoved 9 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 59 documents Report an error

DHARWAD BUSINESS CENTRE is a Commercial project by SOLITAIRE INFRA in Dharwad, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1259/410/PR/180521/001780 on 21 May 2018. Possession is promised by 30 Mar 2022. The completion date has moved by 9 months from the original filing.

At a glance

Project

  • NameDHARWAD BUSINESS CENTRE
  • TypeCommercial
  • Location
    • Dharwad
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1259/410/PR/180521/001780
  • ReraGenie IDRG-KA-47495

Builder

  • NameSOLITAIRE INFRA
  • Entity typePartnership Firm
  • Authorized SignatoryVISHNU R MEHARWADE

Key dates

this monthRegisteredMay 2018First promiseJun 2021Revised toMar 2022

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on21 May 2018
  • Promised completion30 Mar 2022
  • Revised completionRevised to 30 Mar 2022 (originally 30 Jun 2021)
  • Buildings2 building records
  • Documents filed59 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower1---0198198
Tower2---03232

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Providing and Shotcreting the soil surface with 50mm thick 1:2:2 mix after fixing the weld mesh of size 75 * 75 * 4.2mm to excavated earth with U hooks of size 200 x 200 mm up to required depth in all kinds-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemNoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,680 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 16.95 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKEMBHAVI ARCHITECTURE FOUNDATION
EngineerDr. A.B Kulkarni & Associates

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionJun 2021 → Mar 2022

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed59

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1259/410/PR/180521/001780 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: GST CERTIFICATE.pdf-
COMMENCEMET CERTIFICATE-
APPROVED BUILDING PLOTTING PLAN-
approved layout plan-
Sale deed of_RERA-
Agreement_for_Sale_of_RERA FINAL-
SALE DEED AND RTC-
APPROVED SECTION OF BUILDING INFRASTRUCTURE PLAN OF PLOTTING-
Area Development plan of Project Area-
ALLOTMENT LETTER-
Area Development plan of Project Area-
PROJECT SPECIFICATION-
ENCUMBRANCE CERTIFICATE-
TITLE DEED AND KHATA AND TAX REGISTER-
MOU-
any other document (rights and title interest name)-
CONVERSION CERTIFICATE UNDER SEC 95 KLR ACT 1961 N A ODER-
APPROVAL NOC UNDER SEC 14 OF THE KTCP ACT-
UTILIZATION CERTIFICATE-
TRANSFER OF DEVELOPMENT RIGHTS CERTIFICATE-
RELINQUISHMENT DEED-
fire force certificate-
AIR PORT AUTHORITY OF INDIA NOC-
HESCOM-
BMRCL NOC-
KSPCB-
SEIAA-
BSNL-
NOC IN CASE OF BUILDING PROPOSALS ABUTTING TO NEIGHBOURING PROPERIES-
Unnamed document-
URBAN LAND CELING NOC-
BMRCL NOC-
BANGALORE URBAN ARTS COMMISSION-
INSPECTOR OF FACTORIES CONTROLLER OF EXPLOSIVES RAILWAYS-
DISTRIC MAGISTRATE-
COASTAL REGULATION ZONE AUTHORITY-
cerificate from registeres engineer indicating structural safety of the building-
sectional drawings of the apartment-
Existing layout plan-
existing section plan and specification-
CHANGE OF LAND USE-
Advacate Search report-
Balance Sheet 2016 - 2017File: BALANCE SHET 16 17.pdf-
Audited Profit and Loss Statement 2016 - 2017File: profit loss account 16 17.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: income tax return 16 17.pdf-
declaratio B-
Prospectus/BrochureFile: DBC brochure PDF.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1259_410_PR_180521_001780.xls-
Loan raised documentFile: loan Sanction Letter.pdf-
Stability CertificateFile: Stability Certificate.pdf-
NOC issued by the Fire Force department after completion of workFile: FIRE NOC.pdf-
Occupancy CertificateFile: Completion Certificate-33,1-33,4.pdf-
Consent for operation issued by KSPCBFile: HESCOM.pdf-
Certificate of operation for lifts issued by the Chief of Department of Electrical inspectorate Government of File: Lift.pdf-
Sanctioned Letter issued by concerned ESCOM of Power sanction and details of transformer installed and whetherFile: HESCOM.pdf-
Sanctioned letter issued by concerned water supply and sanitary board for the projectFile: BWSSB WATER.pdf-
Architect certificate for having completed the work(in format no 5)File: Architect Certificate.pdf-
Chartered Accountant certificate for having completed the work(in format no 4)File: CA Cetificate,Loan Saction Letter,Reconvaynce deed,Association Bank Acc.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: completion_Affidavit.pdf-

How this compares with Dharwad

29%of Dharwad projects moved their completion datethis one moved by 9 months
0%of Dharwad registrations are shown as withdrawn or revokedthis one is not

Computed across the 250+ Dharwad projects on ReraGenie, from their own filings.

Keep DHARWAD BUSINESS CENTRE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dharwad250+ in Dharwad

2 kmDHARWAD BUSINESS CENTREOther 13Dot size: filed unitsN

Filed coordinates, straight-line distance. 13 registered projects within 2 km.

Builder: SOLITAIRE INFRA

SOLITAIRE INFRA has 1 registration on RERA Karnataka, including DHARWAD BUSINESS CENTRE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dharwad district page.

Frequently asked questions

What are my rights if DHARWAD BUSINESS CENTRE is delayed beyond 30 Mar 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of DHARWAD BUSINESS CENTRE?

The registered promoter entity is SOLITAIRE INFRA, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in DHARWAD BUSINESS CENTRE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at DHARWAD BUSINESS CENTRE?

The professionals named in the filing: Architect: KEMBHAVI ARCHITECTURE FOUNDATION; Engineer: Dr. A.B Kulkarni & Associates. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DHARWAD BUSINESS CENTRE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DHARWAD BUSINESS CENTRE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DHARWAD BUSINESS CENTRE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.