Valid until 31 Mar 2022 Residential/Group Housing project

CONSTRUCTION OF HIGHRISE RESIDENTIAL BUILDING EWS-I,EWS-II AND LIG HOUSES AT FINAL PLOT NO. 384, T.P.S. 35(SAROLI-KUMBHARIYA-SANIYAHEMAD-DEVADH)

By SURAT URBAN DEVELOPMENT AUTHORITY

RG-GJ-48537 · RERA PR/GJ/SURAT/CHORASI/SUDA/RAA07401/310820 · Last updated on GujRERA portal: 2 Feb 2023

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
  • Separate project account declared
Mar 2022Possession promisedno revision filed
92 of 92Construction stages doneacross 13 buildings; every applicable stage filed complete
25 of 1,968Units unsoldnot recorded sold or booked
Jump to the 53 documents Report an error

CONSTRUCTION OF HIGHRISE RESIDENTIAL BUILDING EWS-I,EWS-II AND LIG HOUSES AT FINAL PLOT NO. 384, T.P.S. 35(SAROLI-KUMBHARIYA-SANIYAHEMAD-DEVADH) is a Residential/Group Housing project by SURAT URBAN DEVELOPMENT AUTHORITY in Surat, Gujarat, registered with GujRERA as PR/GJ/SURAT/CHORASI/SUDA/RAA07401/310820 on 31 Aug 2020. Possession is promised by 31 Mar 2022. 1,943 of the 1,968 units on this registration are recorded sold or booked, and 92 of 92 construction stages are filed complete.

At a glance

Project

  • NameCONSTRUCTION OF HIGHRISE RESIDENTIAL BUILDING EWS-I,EWS-II AND LIG HOUSES AT FINAL PLOT NO. 384, T.P.S. 35(SAROLI-KUMBHARIYA-SANIYAHEMAD-DEVADH)
  • TypeResidential/Group Housing
  • Location
    • FINAL PLOT NO. 384
    • T.P.S. 35(SAROLI-KUMBHARIYA-SANIYAHEMAD-DEVADH)
    • MOJE : KUMBHARIYA
    • Kubhariya- Devedh
    • Chorasi
    • Surat
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/SURAT/CHORASI/SUDA/RAA07401/310820
  • ReraGenie IDRG-GJ-48537

Builder

  • NameSURAT URBAN DEVELOPMENT AUTHORITY
  • Entity typeCOMPETENT AUTHORITY/ GOVERNMENT
  • Other registrations9 more →

Key dates

this monthRegisteredAug 2020PromisedMar 2022

Key facts

Registration and timeline

  • StatusValid until 31 Mar 2022
  • Registered on31 Aug 2020
  • Promised completion31 Mar 2022
  • Revised completionNone
  • Buildings13 building records
  • Documents filed53 files

Current status

99%1943 of 1,968 units booked
100.0%Of the estimated cost spent so far

Figures as on 2 Feb 2023, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
EWS-I(5+6)---1600160
EWS-I(7+8)---1760176
EWS-I(9+10)---1760176
LIG(1+2)---1440144
LIG(3+4)---1440144
EWS-II(1+2)---1760176
EWS-II(3+4)---1760176
EWS-II(5+6)---1760176
EWS-II(7+8)---1600160
EWS-II(9+10)---1600160
EWS-I(1+2)---1600160
EWS-I(3)---80080
EWS-I(4)---80080

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building13

As on 2 Feb 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

92 of 92 construction stages are filed complete across 13 buildings.

EWS-I(5+6)100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
EWS-I(7+8)100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
EWS-I(9+10)100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
LIG(1+2)100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
LIG(3+4)100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
EWS-II(1+2)100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
EWS-II(3+4)100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
EWS-II(5+6)100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
EWS-II(7+8)100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
EWS-II(9+10)100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
EWS-I(1+2)100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
EWS-I(3)100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
EWS-I(4)100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 2 Feb 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes100%
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingNoNot applicable
Drinking water facilitiesYes100%
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area43,475 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 129.89 cr
Cost incurredRs 129.89 cr
Spent of the estimate100.0%
BuildingWingEstimatedIncurred
EWS-II(1+2)NARs 9.99 crRs 9.99 cr
EWS-II(3+4)NARs 9.99 crRs 9.99 cr
EWS-II(5+6)NARs 9.99 crRs 9.99 cr
EWS-II(7+8)NARs 9.99 crRs 9.99 cr
EWS-II(9+10)NARs 9.99 crRs 9.99 cr
EWS-I(1+2)NARs 9.99 crRs 9.99 cr
EWS-I(3)NARs 9.99 crRs 9.99 cr
EWS-I(4)NARs 9.99 crRs 9.99 cr
EWS-I(5+6)NARs 9.99 crRs 9.99 cr
EWS-I(7+8)NARs 9.99 crRs 9.99 cr
EWS-I(9+10)NARs 9.99 crRs 9.99 cr
LIG(1+2)NARs 9.99 crRs 9.99 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDHVANI TRIVEDI
EngineerJANAK TRIVEDI

Documents filed53

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/SURAT/CHORASI/SUDA/RAA07401/310820 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)2 Feb 2023
Engineer's certificate (Form 2)2 Feb 2023
Engineer's certificate annexure2 Feb 2023
Accountant's certificate (Form 3)2 Feb 2023
Site photograph, EWS-I(5+6)2 Feb 2023
Site photograph, EWS-I(7+8)2 Feb 2023
Site photograph, EWS-I(9+10)2 Feb 2023
Site photograph, LIG(1+2)2 Feb 2023
Site photograph, LIG(3+4)2 Feb 2023
Site photograph, EWS-II(1+2)2 Feb 2023
Site photograph, EWS-II(3+4)2 Feb 2023
Site photograph, EWS-II(5+6)2 Feb 2023
Site photograph, EWS-II(7+8)2 Feb 2023
Site photograph, EWS-II(9+10)2 Feb 2023
Site photograph, EWS-I(1+2)2 Feb 2023
Site photograph, EWS-I(3)2 Feb 2023
Site photograph, EWS-I(4)2 Feb 2023
RERA registration certificate31 Aug 2020
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Surat

99%of this project is bookeddistrict median 39%
15%of Surat projects moved their completion datethis one has not

Computed across the 2,600+ Surat projects on ReraGenie, from their own filings.

Keep CONSTRUCTION OF HIGHRISE RESIDENTIAL BUILDIN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Kubhariya- Devedh2,600+ in Surat

2 kmCONSTRUCTION OF HIGHRISEOther 111Dot size: filed unitsN

Filed coordinates, straight-line distance. 111 registered projects within 2 km.

Builder: SURAT URBAN DEVELOPMENT AUTHORITY

SURAT URBAN DEVELOPMENT AUTHORITY has 10 registrations on GujRERA, including SUDA LIG 1-5 EWS 4(GOTHAN)315 and SUDALIG2-2(KUMBHARIA)112. Read the full track record. See more projects on the Surat district page.

Frequently asked questions

What are my rights if CONSTRUCTION OF HIGHRISE RESIDENTIAL BUILDING EWS-I,EWS-II AND LIG HOUSES AT FINAL PLOT NO. 384, T.P.S. 35(SAROLI-KUMBHARIYA-SANIYAHEMAD-DEVADH) is delayed beyond 31 Mar 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of CONSTRUCTION OF HIGHRISE RESIDENTIAL BUILDING EWS-I,EWS-II AND LIG HOUSES AT FINAL PLOT NO. 384, T.P.S. 35(SAROLI-KUMBHARIYA-SANIYAHEMAD-DEVADH)?

The registered promoter entity is SURAT URBAN DEVELOPMENT AUTHORITY, a competent authority/ government as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in CONSTRUCTION OF HIGHRISE RESIDENTIAL BUILDING EWS-I,EWS-II AND LIG HOUSES AT FINAL PLOT NO. 384, T.P.S. 35(SAROLI-KUMBHARIYA-SANIYAHEMAD-DEVADH)?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at CONSTRUCTION OF HIGHRISE RESIDENTIAL BUILDING EWS-I,EWS-II AND LIG HOUSES AT FINAL PLOT NO. 384, T.P.S. 35(SAROLI-KUMBHARIYA-SANIYAHEMAD-DEVADH)?

The professionals named in the filing: Architect: DHVANI TRIVEDI; Engineer: JANAK TRIVEDI. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CONSTRUCTION OF HIGHRISE RESIDENTIAL BUILDING EWS-I,EWS-II AND LIG HOUSES AT FINAL PLOT NO. 384, T.P.S. 35(SAROLI-KUMBHARIYA-SANIYAHEMAD-DEVADH)?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CONSTRUCTION OF HIGHRISE RESIDENTIAL BUILDING EWS-I,EWS-II AND LIG HOUSES AT FINAL PLOT NO. 384, T.P.S. 35(SAROLI-KUMBHARIYA-SANIYAHEMAD-DEVADH). Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CONSTRUCTION OF HIGHRISE RESIDENTIAL BUILDIN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.