Home / Browse projects / Vijayapura, Karnataka / Construction of 56 (G+2) DUs at Vijaypur town

Registration approved No litigation declared Residential/Group Housing project

Construction of 56 (G+2) DUs at Vijaypur town

By city Corporation Vijayapur

RG-KA-07665 · RERA PRM/KA/RERA/1275/448/PR/090322/004749 · Last updated on RERA Karnataka portal: 21 Feb 2022

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Oct 2021Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 77 documents Report an error

Construction of 56 (G+2) DUs at Vijaypur town is a Residential/Group Housing project by city Corporation Vijayapur in Vijayapura, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1275/448/PR/090322/004749 on 9 Mar 2022. Possession is promised by 16 Oct 2021.

At a glance

Project

  • NameConstruction of 56 (G+2) DUs at Vijaypur town
  • TypeResidential/Group Housing
  • Location
    • Bijapur
    • Vijayapura
    • 586101
  • Pincode586101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1275/448/PR/090322/004749
  • ReraGenie IDRG-KA-07665

Builder

  • Namecity Corporation Vijayapur
  • Entity typeRajiv Gandhi Housing Corporation Limited

Key dates

Registered
9 Mar 2022
Promised
16 Oct 2021

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on9 Mar 2022
  • Promised completion16 Oct 2021
  • Revised completionNone
  • Buildings5 building records
  • Documents filed77 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLOCK A---12012
BLOCK B---12012
Block C---12012
BLOCK D---12012
BLOCK E---808

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 21 Feb 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 21 Feb 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsNoNot applicable
Corridor/LobbiesNoNot applicable
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceYes-
Outer WallNoNot applicable
Open parking areasYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,615 sq m
Named landowners1
LandownerVillageDistrict
Commissioner city corporation Vijayapur--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 4.25 cr
Cost lineEstimatedIncurred
On-site expenditure-Salaries of workersRs 4.17 cr-
On-site expenditure-Consultants FeesRs 8.32 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTankasali Consultantants
EngineerTankasali Consultantants
Chartered Accountantv s putti

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed77

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1275/448/PR/090322/004749 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Bldg DwgsFile: DOC-20181226-WA0000 (1).pdf21 Feb 2022
Bldg DwgsFile: DOC-20190101-WA0001 (1).pdf21 Feb 2022
Bldg DwgsFile: ELE FF.pdf21 Feb 2022
Bldg DwgsFile: ELE GF.pdf21 Feb 2022
Bldg DwgsFile: slab details (2).pdf21 Feb 2022
Bldg DwgsFile: stair case (2).pdf21 Feb 2022
RTC, survey 107-
Mutation, survey 107-
Encumbrance Certificate, survey 107-
Khatha, survey 107-
Certificate issued by CA Form 1-
Certificate issued by Architect Form 2-
Certificate issued by Engineer Form 3-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: RTC.jpeg-
Certificate from Chartered Account-
Balance Sheet 2020 - 2021File: Document.pdf-
Balance Sheet 2019 - 2020File: Document.pdf-
Balance Sheet 2018 - 2019File: Document.pdf-
Audited Profit and Loss Statement 2020 - 2021File: Document.pdf-
Audited Profit and Loss Statement 2019 - 2020File: Document.pdf-
Audited Profit and Loss Statement 2018 - 2019File: Document.pdf-
Director's Report 2020 - 2021File: Document.pdf-
Director's Report 2019 - 2020File: Document.pdf-
Director's Report 2018 - 2019File: Document.pdf-
Cash Flow Statement 2020 - 2021File: Document.pdf-
Cash Flow Statement 2019 - 2020File: Document.pdf-
Auditor's Report 2020 - 2021File: Document.pdf-
Auditor's Report 2019 - 2020File: Document.pdf-
Auditor's Report 2018 - 2019File: Document.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: Document.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: Document.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: Document.pdf-
Work order-
Pkg Building_compressed-
Document-
Aproved Plan-
Aproved Plan-
Aproved Plan-
Aproved Plan-
stair case (1)-
slab details (1)-
slab details (1)-
pb detail (1)-
slab details (1)-
DOC-20190101-WA0002 (1)-
pb detail (1)-
stair case (1)-
pb detail (2)-
Document-
Document-
Document-
Document-
Document-
Document-
Document-
Document-
Document-
Document-
Document-
Document-
Document-
Document-
Document-
Document-
Document-
Document-
Document-
Document-
Document-
Document-
Unnamed document-
Unnamed document-
Unnamed document-
Document-

How this compares with Vijayapura

21%of Vijayapura projects moved their completion datethis one has not
0%of Vijayapura registrations are shown as withdrawn or revokedthis one is not

Computed across the 56 Vijayapura projects on ReraGenie, from their own filings.

Keep Construction of 56 (G+2) DUs at Vijaypur tow on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Vijayapura56 in Vijayapura

Builder: city Corporation Vijayapur

city Corporation Vijayapur has 1 registration on RERA Karnataka, including Construction of 56 (G+2) DUs at Vijaypur town. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Vijayapura district page.

Frequently asked questions

What are my rights if Construction of 56 (G+2) DUs at Vijaypur town is delayed beyond 16 Oct 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Construction of 56 (G+2) DUs at Vijaypur town?

The registered promoter entity is city Corporation Vijayapur, a rajiv gandhi housing corporation limited as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Construction of 56 (G+2) DUs at Vijaypur town?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Construction of 56 (G+2) DUs at Vijaypur town?

The professionals named in the filing: Architect: Tankasali Consultantants; Engineer: Tankasali Consultantants; Chartered Accountant: v s putti. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Construction of 56 (G+2) DUs at Vijaypur town?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Construction of 56 (G+2) DUs at Vijaypur town. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Construction of 56 (G+2) DUs at Vijaypur tow to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.