ReraGenieLog inGet a buyer report

Home / Browse projects / Surat, Gujarat / CELLESTIAL DREAMS

Valid until 29 Jun 2022 Residential/Group Housing project

CELLESTIAL DREAMS

By DRB RAVANI DEVELOPERS

RG-GJ-37664 · RERA PR/GJ/SURAT/SURAT CITY/SUDA/RAA00654/EX1/090621 · Last updated on GujRERA portal: 29 Jun 2022

Source: official GujRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Separate project account declared
Jun 2022Possession promisedmoved 12 months from the original
56 of 56Construction stages doneacross 7 buildings; every applicable stage filed complete
5 of 218Units unsoldnot recorded sold or booked
Jump to the 44 documents Report an error

CELLESTIAL DREAMS is a Residential/Group Housing project by DRB RAVANI DEVELOPERS in Surat, Gujarat, registered with GujRERA as PR/GJ/SURAT/SURAT CITY/SUDA/RAA00654/EX1/090621 on 9 Nov 2017. Possession is promised by 29 Jun 2022. The completion date has moved by 12 months from the original filing. 213 of the 218 units on this registration are recorded sold or booked, and 56 of 56 construction stages are filed complete.

At a glance

Project

  • NameCELLESTIAL DREAMS
  • TypeResidential/Group Housing
  • Location
    • R.S. NO. 140 /p1 to p8
    • O.P.-3
    • F.P.NO.-3
    • Notional Plot -A
    • T.P. Scheme -5 (Vesu - Bhimrad)
    • Canal Rd
    • Behind South Gujarat University
    • New Airport Road
    • ...
  • Pincode395007
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/SURAT/SURAT CITY/SUDA/RAA00654/EX1/090621
  • ReraGenie IDRG-GJ-37664

Builder

  • NameDRB RAVANI DEVELOPERS
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredNov 2017First promiseJun 2021Revised toJun 2022

Key facts

Registration and timeline

  • StatusValid until 29 Jun 2022
  • Registered on9 Nov 2017
  • Promised completion29 Jun 2022
  • Revised completionRevised to 29 Jun 2022 (originally 30 Jun 2021)
  • Buildings7 building records
  • Documents filed44 files

Current status

98%213 of 218 units booked
97.8%Of the estimated cost spent so far

Figures as on 29 Jun 2022, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building A---51051
Building B---20020
Building C---54054
Building D---20020
Building E---33033
Building F---20020
Building G---20020

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building7

As on 29 Jun 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

56 of 56 construction stages are filed complete across 7 buildings.

Building A100%
ActivityProgress
Excavation100%
Podiums (if any)100%
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Building B100%
ActivityProgress
Excavation100%
Podiums (if any)100%
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Building C100%
ActivityProgress
Excavation100%
Podiums (if any)100%
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Building D100%
ActivityProgress
Excavation100%
Podiums (if any)100%
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Building E100%
ActivityProgress
Excavation100%
Podiums (if any)100%
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Building F100%
ActivityProgress
Excavation100%
Podiums (if any)100%
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Building G100%
ActivityProgress
Excavation100%
Podiums (if any)100%
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 29 Jun 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes100%
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsYes100%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes100%
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingYes100%
Drinking water facilitiesYes100%
Emergency evacuationYes100%
Use of renewable energyNoNot applicable
SecurityYes100%
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area29,772 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 216.98 cr
Cost incurredRs 212.22 cr
Spent of the estimate97.81%
BuildingWingEstimatedIncurred
Building ANARs 31.00 crRs 30.32 cr
Building BNARs 31.00 crRs 30.32 cr
Building CNARs 31.00 crRs 30.32 cr
Building DNARs 31.00 crRs 30.32 cr
Building ENARs 31.00 crRs 30.32 cr
Building FNARs 31.00 crRs 30.32 cr
Building GNARs 31.00 crRs 30.32 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBLACK INK
EngineerJW CONSULTANTS LLP

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/SURAT/SURAT CITY/SUDA/RAA00654/EX1/090621Applied May 2021; approved Jun 2021

Documents filed44

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/SURAT/SURAT CITY/SUDA/RAA00654/EX1/090621 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)29 Jun 2022
Engineer's certificate (Form 2)29 Jun 2022
Engineer's certificate annexure29 Jun 2022
Accountant's certificate (Form 3)29 Jun 2022
Site photograph, Building A29 Jun 2022
Site photograph, Building B29 Jun 2022
Site photograph, Building C29 Jun 2022
Site photograph, Building D29 Jun 2022
Site photograph, Building E29 Jun 2022
Site photograph, Building F29 Jun 2022
Site photograph, Building G29 Jun 2022
RERA registration certificate9 Nov 2017
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Surat

98%of this project is bookeddistrict median 39%
15%of Surat projects moved their completion datethis one moved by 12 months

Computed across the 2,600+ Surat projects on ReraGenie, from their own filings.

Keep CELLESTIAL DREAMS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Vesu2,600+ in Surat

2 kmCELLESTIAL DREAMSOther 212Dot size: filed unitsN

Filed coordinates, straight-line distance. 212 registered projects within 2 km.

Builder: DRB RAVANI DEVELOPERS

DRB RAVANI DEVELOPERS has 1 registration on GujRERA, including CELLESTIAL DREAMS. Read the full track record. See more projects on the Surat district page.

Frequently asked questions

What are my rights if CELLESTIAL DREAMS is delayed beyond 29 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of CELLESTIAL DREAMS?

The registered promoter entity is DRB RAVANI DEVELOPERS, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in CELLESTIAL DREAMS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at CELLESTIAL DREAMS?

The professionals named in the filing: Architect: BLACK INK; Engineer: JW CONSULTANTS LLP. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CELLESTIAL DREAMS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CELLESTIAL DREAMS. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CELLESTIAL DREAMS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.