Home / Browse projects / Vadodara, Gujarat / BAITULHAMD

Valid until 30 Sep 2019 Residential/Group Housing project

BAITULHAMD

By AS-SHAMS DEVLOPERS

RG-GJ-76363 · RERA PR/GJ/VADODARA/VADODARA/Others/RAA04357/141218 · Last updated on GujRERA portal: 21 Aug 2019

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
  • Separate project account declared
Sep 2019Possession promisedno revision filed
13 of 32Construction stages doneacross 4 buildings; furthest along: Internal walls, 97%
11 of 62Units unsoldnot recorded sold or booked
Jump to the 40 documents Report an error

BAITULHAMD is a Residential/Group Housing project by AS-SHAMS DEVLOPERS in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Others/RAA04357/141218 on 14 Dec 2018. Possession is promised by 30 Sep 2019. 51 of the 62 units on this registration are recorded sold or booked, and 13 of 32 construction stages are filed complete.

At a glance

Project

  • NameBAITULHAMD
  • TypeResidential/Group Housing
  • Location
    • C/O. CITIZEN TRADERS
    • ZAVAR BHAVAN
    • B/H. LAL COURT
    • Gorwa
    • Vadodara
    • 390016
  • Pincode390016
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Others/RAA04357/141218
  • ReraGenie IDRG-GJ-76363

Builder

  • NameAS-SHAMS DEVLOPERS
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredDec 2018PromisedSep 2019

Key facts

Registration and timeline

  • StatusValid until 30 Sep 2019
  • Registered on14 Dec 2018
  • Promised completion30 Sep 2019
  • Revised completionNone
  • Buildings4 building records
  • Documents filed40 files

Current status

82%51 of 62 units booked
93.3%Of the estimated cost spent so far

Figures as on 21 Aug 2019, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TYPE B---12012
TYPE B1---24024
TYPE A---606
TYPE A1---20020

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building4

As on 21 Aug 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

13 of 32 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 97%.

TYPE B97%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats97%
Sanitary fittings within the flats97%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks97%
External plumbing and external plaster, elevation, completion of terraces with waterproofing97%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing90%
TYPE B196%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats97%
Sanitary fittings within the flats97%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks97%
External plumbing and external plaster, elevation, completion of terraces with waterproofing90%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing90%
TYPE A98%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats97%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks97%
External plumbing and external plaster, elevation, completion of terraces with waterproofing97%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing90%
TYPE A197%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats97%
Sanitary fittings within the flats97%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks97%
External plumbing and external plaster, elevation, completion of terraces with waterproofing97%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing90%

Progress on shared amenities19

As on 21 Aug 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsNoNot applicable
Landscaping and tree plantingYes70%
Street lightingYes70%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,706 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 4.50 cr
Cost incurredRs 4.20 cr
Spent of the estimate93.33%
BuildingWingEstimatedIncurred
TYPE ANARs 1.12 crRs 1.05 cr
TYPE A1NARs 1.12 crRs 1.05 cr
TYPE BNARs 1.12 crRs 1.05 cr
TYPE B1NARs 1.12 crRs 1.05 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDISHA ARCHITECT-ENGINNERS
EngineerZARNA ASSOCIATES (DR. VINUBHAI PATEL)

Documents filed40

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Others/RAA04357/141218 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)21 Aug 2019
Architect's certificate (Form 1)20 Aug 2019
Engineer's certificate (Form 2)20 Aug 2019
Site photograph, TYPE B20 Aug 2019
Site photograph, TYPE B120 Aug 2019
Site photograph, TYPE A20 Aug 2019
Site photograph, TYPE A120 Aug 2019
RERA registration certificate14 Dec 2018
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Vadodara

82%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one has not

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep BAITULHAMD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Gorwa2,900+ in Vadodara

2 kmBAITULHAMDOther 110Dot size: filed unitsN

Filed coordinates, straight-line distance. 110 registered projects within 2 km.

Builder: AS-SHAMS DEVLOPERS

AS-SHAMS DEVLOPERS has 1 registration on GujRERA, including BAITULHAMD. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if BAITULHAMD is delayed beyond 30 Sep 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of BAITULHAMD?

The registered promoter entity is AS-SHAMS DEVLOPERS, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in BAITULHAMD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at BAITULHAMD?

The professionals named in the filing: Architect: DISHA ARCHITECT-ENGINNERS; Engineer: ZARNA ASSOCIATES (DR. VINUBHAI PATEL). Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BAITULHAMD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BAITULHAMD. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BAITULHAMD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.