Home / Browse projects / Vadodara, Gujarat / BAGE AHMAD RESIDENCY

Valid until 31 Mar 2020 Residential/Group Housing project

BAGE AHMAD RESIDENCY

By MADINABIBI HASANKHAN PATHAN PROP. OF BAGE AHMED RESIDENCY

RG-GJ-72344 · RERA PR/GJ/VADODARA/PADRA/Others/RAA04466/EX1/180919 · Last updated on GujRERA portal: 31 Dec 2021

Source: official GujRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Separate project account declared
Mar 2020Possession promisedmoved 12 months from the original
16 of 16Construction stages doneacross 2 buildings; every applicable stage filed complete
2 of 26Units unsoldnot recorded sold or booked
Jump to the 41 documents Report an error

BAGE AHMAD RESIDENCY is a Residential/Group Housing project by MADINABIBI HASANKHAN PATHAN PROP. OF BAGE AHMED RESIDENCY in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/PADRA/Others/RAA04466/EX1/180919 on 26 Dec 2018. Possession is promised by 31 Mar 2020. The completion date has moved by 12 months from the original filing. 24 of the 26 units on this registration are recorded sold or booked, and 16 of 16 construction stages are filed complete.

At a glance

Project

  • NameBAGE AHMAD RESIDENCY
  • TypeResidential/Group Housing
  • Location
    • NEAR PARNAMI AGARBATI
    • NEAR MANUSMRUTI HALL
    • Padra
    • Vadodara
    • 391440
  • Pincode391440
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/PADRA/Others/RAA04466/EX1/180919
  • ReraGenie IDRG-GJ-72344

Builder

  • NameMADINABIBI HASANKHAN PATHAN PROP. OF BAGE AHMED RESIDENCY
  • Entity typeIndividual/Propritorship
  • Other registrations1 more →

Key dates

this monthRegisteredDec 2018First promiseMar 2019Revised toMar 2020

Key facts

Registration and timeline

  • StatusValid until 31 Mar 2020
  • Registered on26 Dec 2018
  • Promised completion31 Mar 2020
  • Revised completionRevised to 31 Mar 2020 (originally 31 Mar 2019)
  • Buildings2 building records
  • Documents filed41 files

Current status

92%24 of 26 units booked
100.0%Of the estimated cost spent so far

Figures as on 31 Dec 2021, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TYPE A---10010
TYPE B---16016

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building2

As on 31 Dec 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 16 construction stages are filed complete across 2 buildings.

TYPE A100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
TYPE B100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 31 Dec 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsNoNot applicable
Landscaping and tree plantingNoNot applicable
Street lightingYes100%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,757 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 1.96 cr
Cost incurredRs 1.96 cr
Spent of the estimate100.0%
BuildingWingEstimatedIncurred
TYPE ANARs 97.82 lakhRs 97.82 lakh
TYPE BNARs 97.82 lakhRs 97.82 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDHWANI BHAVSAR
EngineerANIL KORANNE

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/VADODARA/PADRA/Others/RAA04466/EX1/180919Applied Aug 2019; approved Sep 2019

Documents filed41

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/PADRA/Others/RAA04466/EX1/180919 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)31 Dec 2021
Engineer's certificate (Form 2)31 Dec 2021
Engineer's certificate annexure31 Dec 2021
Accountant's certificate (Form 3)31 Dec 2021
Site photograph, TYPE A31 Dec 2021
Site photograph, TYPE A31 Dec 2021
Site photograph, TYPE B31 Dec 2021
Site photograph, TYPE B31 Dec 2021
RERA registration certificate26 Dec 2018
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Vadodara

92%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one moved by 12 months

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep BAGE AHMAD RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Padra2,900+ in Vadodara

Builder: MADINABIBI HASANKHAN PATHAN PROP. OF BAGE AHMED RESIDENCY

MADINABIBI HASANKHAN PATHAN PROP. OF BAGE AHMED RESIDENCY has 2 registrations on GujRERA, including BAGE AHMAD RESIDENCY and BAGE AHEMAD RESIDENCY PHASE II. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if BAGE AHMAD RESIDENCY is delayed beyond 31 Mar 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of BAGE AHMAD RESIDENCY?

The registered promoter entity is MADINABIBI HASANKHAN PATHAN PROP. OF BAGE AHMED RESIDENCY, an individual/propritorship as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in BAGE AHMAD RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at BAGE AHMAD RESIDENCY?

The professionals named in the filing: Architect: DHWANI BHAVSAR; Engineer: ANIL KORANNE. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BAGE AHMAD RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BAGE AHMAD RESIDENCY. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BAGE AHMAD RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.