ReraGenieLog inGet a buyer report

Home / Browse projects / Vadodara, Gujarat / AVANI IRAAYA

Valid until 31 Dec 2031 Residential/Group Housing project

AVANI IRAAYA

By Subodh Developers LLP

RG-GJ-71849 · RERA PR/GJ/VADODARA/VADODARA/Vadodara Urban Development Authority/RAA17427/061026/311231 · Last updated on GujRERA portal: 6 Oct 2026

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Dec 2031Possession promisedno revision filed
0 of 918Construction stages doneacross 102 buildings; furthest along: Excavation, 0%
96 of 102Units unsoldnot recorded sold or booked
Jump to the 134 documents Report an error

AVANI IRAAYA is a Residential/Group Housing project by Subodh Developers LLP in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Vadodara Urban Development Authority/RAA17427/061026/311231 on 6 Oct 2026. Possession is promised by 31 Dec 2031. 6 of the 102 units on this registration are recorded sold or booked, and 0 of 918 construction stages are filed complete.

At a glance

Project

  • NameAVANI IRAAYA
  • TypeResidential/Group Housing
  • Location
    • AVANI IRAAYA
    • Opp D Mart Aankhol
    • Waghodiya Road
    • Vadodara
    • Ankhol
    • Vadodara
    • 390019
  • Pincode390019
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Vadodara Urban Development Authority/RAA17427/061026/311231
  • ReraGenie IDRG-GJ-71849

Builder

  • NameSubodh Developers LLP
  • Entity typeLIMITED LIABILITY PARTNERSHIP FIRM

Key dates

this monthRegisteredOct 2026PromisedDec 2031

Key facts

Registration and timeline

  • StatusValid until 31 Dec 2031
  • Registered on6 Oct 2026
  • Promised completion31 Dec 2031
  • Revised completionNone
  • Buildings102 building records
  • Documents filed134 files

Current status

6%6 of 102 units booked
0.0%Of the estimated cost spent so far

Figures as on 6 Oct 2026, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
1---101
2---101
3---101
4---101
5---101
6---101
7---101
8---101
9---101
10---101
11---101
12---101
13---101
14---101
15---101
16---101
17---101
18---101
19---101
20---101
21---101
22---101
23---101
24---101
25---101
26---101
27---101
28---101
29---101
30---101
31---101
32---101
33---101
34---101
35---101
36---101
37---101
38---101
39---101
40---101
41---101
42---101
43---101
44---101
45---101
46---101
47---101
48---101
49---101
50---101
51---101
52---101
53---101
54---101
55---101
56---101
57---101
58---101
59---101
60---101
61---101
62---101
63---101
64---101
65---101
66---101
67---101
68---101
69---101
70---101
71---101
72---101
73---101
74---101
75---101
76---101
77---101
78---101
79---101
80---101
81---101
82---101
83---101
84---101
85---101
86---101
87---101
88---101
89---101
90---101
91---101
92---101
93---101
94---101
95---101
96---101
97---101
98---101
99---101
100---101
101---101
102---101

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building20

As on 6 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 102 buildings; the table lists the first 20.

0 of 918 construction stages are filed complete across 102 buildings. The stage furthest along is Excavation, at 0%.

10%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
20%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
30%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
40%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
50%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
60%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
70%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
80%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
90%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
100%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
110%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
120%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
130%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
140%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
150%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
160%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
170%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
180%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
190%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
200%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%

Progress on shared amenities19

As on 6 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes0%
Water supplyYes0%
Sewerage (chamber, lines, septic tank, STP)Yes0%
Storm water drainsYes0%
Landscaping and tree plantingYes0%
Street lightingYes0%
Community buildingsYes0%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes0%
Water conservation, rain water harvestingYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Fire fightingNoNot applicable
Drinking water facilitiesYes0%
Emergency evacuationNoNot applicable
Use of renewable energyYes0%
SecurityYes0%
Letter boxYes0%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area16,871 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 39.00 cr
Spent of the estimate0.0%
BuildingWingEstimatedIncurred
1NARs 38.24 lakh-
2NARs 38.24 lakh-
3NARs 38.24 lakh-
4NARs 38.24 lakh-
5NARs 38.24 lakh-
6NARs 38.24 lakh-
7NARs 38.24 lakh-
8NARs 38.24 lakh-
9NARs 38.24 lakh-
10NARs 38.24 lakh-
11NARs 38.24 lakh-
12NARs 38.24 lakh-

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMAHESH LAVJIBHAI RATHOD
EngineerAMI DESAI

Documents filed134

As listed on the registration, under the names the promoter filed them with; the newest 80 of 134 are shown. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Vadodara Urban Development Authority/RAA17427/061026/311231 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
RERA registration certificate6 Oct 2026
Architect's certificate (Form 1)18 Aug 2026
Engineer's certificate (Form 2)18 Aug 2026
Engineer's certificate annexure18 Aug 2026
Accountant's certificate (Form 3)18 Aug 2026
Site photograph, 118 Aug 2026
Site photograph, 218 Aug 2026
Site photograph, 318 Aug 2026
Site photograph, 418 Aug 2026
Site photograph, 518 Aug 2026
Site photograph, 618 Aug 2026
Site photograph, 718 Aug 2026
Site photograph, 818 Aug 2026
Site photograph, 918 Aug 2026
Site photograph, 1018 Aug 2026
Site photograph, 1118 Aug 2026
Site photograph, 1218 Aug 2026
Site photograph, 1318 Aug 2026
Site photograph, 1418 Aug 2026
Site photograph, 1518 Aug 2026
Site photograph, 1618 Aug 2026
Site photograph, 1718 Aug 2026
Site photograph, 1818 Aug 2026
Site photograph, 1918 Aug 2026
Site photograph, 2018 Aug 2026
Site photograph, 2118 Aug 2026
Site photograph, 2218 Aug 2026
Site photograph, 2318 Aug 2026
Site photograph, 2418 Aug 2026
Site photograph, 2518 Aug 2026
Site photograph, 2618 Aug 2026
Site photograph, 2718 Aug 2026
Site photograph, 2818 Aug 2026
Site photograph, 2918 Aug 2026
Site photograph, 3018 Aug 2026
Site photograph, 3118 Aug 2026
Site photograph, 3218 Aug 2026
Site photograph, 3318 Aug 2026
Site photograph, 3418 Aug 2026
Site photograph, 3518 Aug 2026
Site photograph, 3618 Aug 2026
Site photograph, 3718 Aug 2026
Site photograph, 3818 Aug 2026
Site photograph, 3918 Aug 2026
Site photograph, 4018 Aug 2026
Site photograph, 4118 Aug 2026
Site photograph, 4218 Aug 2026
Site photograph, 4318 Aug 2026
Site photograph, 4418 Aug 2026
Site photograph, 4518 Aug 2026
Site photograph, 4618 Aug 2026
Site photograph, 4718 Aug 2026
Site photograph, 4818 Aug 2026
Site photograph, 4918 Aug 2026
Site photograph, 5018 Aug 2026
Site photograph, 5118 Aug 2026
Site photograph, 5218 Aug 2026
Site photograph, 5318 Aug 2026
Site photograph, 5418 Aug 2026
Site photograph, 5518 Aug 2026
Site photograph, 5618 Aug 2026
Site photograph, 5718 Aug 2026
Site photograph, 5818 Aug 2026
Site photograph, 5918 Aug 2026
Site photograph, 6018 Aug 2026
Site photograph, 6118 Aug 2026
Site photograph, 6218 Aug 2026
Site photograph, 6318 Aug 2026
Site photograph, 6418 Aug 2026
Site photograph, 6518 Aug 2026
Site photograph, 6618 Aug 2026
Site photograph, 6718 Aug 2026
Site photograph, 6818 Aug 2026
Site photograph, 6918 Aug 2026
Site photograph, 7018 Aug 2026
Site photograph, 7118 Aug 2026
Site photograph, 7218 Aug 2026
Site photograph, 7318 Aug 2026
Site photograph, 7418 Aug 2026
Site photograph, 7518 Aug 2026

How this compares with Vadodara

6%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one has not

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep AVANI IRAAYA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Ankhol2,900+ in Vadodara

2 kmAVANI IRAAYAOther 182Dot size: filed unitsN

Filed coordinates, straight-line distance. 182 registered projects within 2 km.

Builder: Subodh Developers LLP

Subodh Developers LLP has 1 registration on GujRERA, including AVANI IRAAYA. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if AVANI IRAAYA is delayed beyond 31 Dec 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of AVANI IRAAYA?

The registered promoter entity is Subodh Developers LLP, a limited liability partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in AVANI IRAAYA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at AVANI IRAAYA?

The professionals named in the filing: Architect: MAHESH LAVJIBHAI RATHOD; Engineer: AMI DESAI. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AVANI IRAAYA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AVANI IRAAYA. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AVANI IRAAYA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.