ReraGenieLog inGet a buyer report

Home / Browse projects / Ahmedabad, Gujarat / ATRIA BUSINESS ZONE

Valid until 1 Dec 2019 Commercial project

ATRIA BUSINESS ZONE

By SHYAM BUILDCON

RG-GJ-39075 · RERA PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/CAA02390/EX1/180619 · Last updated on GujRERA portal: 30 Apr 2024

Source: official GujRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Nothing verified clear yet
Dec 2019Possession promisedmoved 12 months from the original
24 of 27Construction stages doneacross 3 buildings; furthest along: Stilt Floor, 0%
67 of 180Units unsoldnot recorded sold or booked
Jump to the 40 documents Report an error

ATRIA BUSINESS ZONE is a Commercial project by SHYAM BUILDCON in Ahmedabad, Gujarat, registered with GujRERA as PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/CAA02390/EX1/180619 on 17 Apr 2018. Possession is promised by 1 Dec 2019. The completion date has moved by 12 months from the original filing. 113 of the 180 units on this registration are recorded sold or booked, and 24 of 27 construction stages are filed complete.

At a glance

Project

  • NameATRIA BUSINESS ZONE
  • TypeCommercial
  • Location
    • ATRIA BUSINESS ZONE
    • OPP. ARAVIND MILL
    • ASARWA
    • AHMEDABAD
    • Asarwa Extension North
    • Ahmedabad City
    • Ahmedabad
    • 380016
  • Pincode380016
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/CAA02390/EX1/180619
  • ReraGenie IDRG-GJ-39075

Builder

  • NameSHYAM BUILDCON
  • Entity typePARTNERSHIP FIRM
  • Other registrations11 more →

Key dates

this monthRegisteredApr 2018First promiseDec 2018Revised toDec 2019

Key facts

Registration and timeline

  • StatusValid until 1 Dec 2019
  • Registered on17 Apr 2018
  • Promised completion1 Dec 2019
  • Revised completionRevised to 1 Dec 2019 (originally 1 Dec 2018)
  • Buildings3 building records
  • Documents filed40 files

Current status

63%113 of 180 units booked
100.0%Of the estimated cost spent so far

Figures as on 30 Apr 2024, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---0152159
B---007
B1---0014

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building3

As on 30 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

24 of 27 construction stages are filed complete across 3 buildings. The stage furthest along is Stilt Floor, at 0%.

A89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
B89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
B189%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 30 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)NoNot applicable
Storm water drainsYes100%
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,831 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 8.11 cr
Cost incurredRs 8.11 cr
Spent of the estimate100.0%
BuildingWingEstimatedIncurred
ANARs 2.70 crRs 2.70 cr
BNARs 2.70 crRs 2.70 cr
B1NARs 2.70 crRs 2.70 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMOHANBHAI B. AGRAWAL
EngineerMOHANBHAI B. AGRAWAL

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/CAA02390/EX1/180619Applied Jun 2019; approved Jun 2019

Documents filed40

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/CAA02390/EX1/180619 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)30 Apr 2024
Architect's certificate (Form 1)26 Apr 2024
Engineer's certificate (Form 2)26 Apr 2024
Engineer's certificate annexure26 Apr 2024
Site photograph, A19 Apr 2024
Site photograph, B19 Apr 2024
Site photograph, B119 Apr 2024
RERA registration certificate17 Apr 2018
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Ahmedabad

63%of this project is bookeddistrict median 53%
14%of Ahmedabad projects moved their completion datethis one moved by 12 months

Computed across the 5,400+ Ahmedabad projects on ReraGenie, from their own filings.

Keep ATRIA BUSINESS ZONE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Asarwa Extension North5,400+ in Ahmedabad

2 kmATRIA BUSINESS ZONEOther 29Dot size: filed unitsN

Filed coordinates, straight-line distance. 29 registered projects within 2 km.

Builder: SHYAM BUILDCON

SHYAM BUILDCON has 12 registrations on GujRERA, including ATRIA BUSINESS ZONE and SHYAM HILL. Read the full track record. See more projects on the Ahmedabad district page.

Frequently asked questions

What are my rights if ATRIA BUSINESS ZONE is delayed beyond 1 Dec 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of ATRIA BUSINESS ZONE?

The registered promoter entity is SHYAM BUILDCON, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in ATRIA BUSINESS ZONE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at ATRIA BUSINESS ZONE?

The professionals named in the filing: Architect: MOHANBHAI B. AGRAWAL; Engineer: MOHANBHAI B. AGRAWAL. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ATRIA BUSINESS ZONE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ATRIA BUSINESS ZONE. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ATRIA BUSINESS ZONE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.