Red flags
- Completion date moved by 12 months
- 2 extensions taken
Clear
- No complaints on record
- Separate project account declared
Saved.
ARIHANT ATRIA is a Mixed Development project by ARIHANT INFRAREALTY PRIVATE LIMITED in Dharwad, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1259/410/PR/180208/002242 on 8 Feb 2018. Possession is promised by 31 Mar 2020. The completion date has moved by 12 months from the original filing.
At a glance
Project
- NameARIHANT ATRIA
- TypeMixed Development
- Location
- Dharwad
- PincodeNot stated
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1259/410/PR/180208/002242
- ReraGenie IDRG-KA-54518
Builder
- NameARIHANT INFRAREALTY PRIVATE LIMITED
- Entity typeCompany
- CINU45205KA2011PTC061575
- Authorized SignatoryVARDHAMAN ADAGONDA PATIL
- DirectorsUTTAM RAOSAHEB PATIL, RAJKUMAR SHRIKANT KHAWATE, DILIPKUMAR BHAU PATIL, ABHINANDAN RAOSAHEB PATIL, MAHAVEER TAMMANNA DASHARATH DANOLLI
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on8 Feb 2018
- Promised completion31 Mar 2020
- Revised completionRevised to 31 Mar 2020 (originally 31 Mar 2019)
- Buildings1 building record
- Documents filed58 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Arihant Atria | - | - | - | - | - | 91 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Retaining wall (All types) | - |
| Plinth level Beam | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| RCC or MS Framed structure | - |
| Masonry construction: Bricks, Concrete blocks etc | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | Not applicable |
| Painting | - |
| Elevation work | - |
| Internal and External work including landscapes as per santioned drawings | - |
Progress on shared amenities41
Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Internal Roads & Footpaths | No | Not applicable |
| Sewage and Drainage System | Yes | - |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Water conservation | Yes | - |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | No | Not applicable |
| Education/Health/Other public amenities | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Emergency Evacuation services | No | Not applicable |
| Storm water drains | Yes | - |
| Use of renewable energy | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | Yes | - |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | No | Not applicable |
| Power Backup | Yes | - |
| Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas and common storage spaces | Yes | - |
| Provision for lodging of management staff and security staff | Yes | - |
| Water conservation and renewable energy | Yes | - |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AR PRASHANT PADMAKAR KAPDI |
| Engineer | DR A B KULKARNI & ASSOCIATES |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
No reason recorded in the filing
Reason as filed by the promoterShortage of Labour
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed58
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1259/410/PR/180208/002242 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| CertificateFile: ROC.jpg | - |
| Architect Certificate for Work Completion Schedule till DateFile: ARCH WORK COMPLETED CERTIFICATE.pdf | - |
| Engineer Certificate for Work Completion Schedule till DateFile: ENG WORK COMPLETION CERTIFICATE.pdf | - |
| CA Certificate for Funds UtilizationFile: CA FUND UTILISATION CERTIFICATE.pdf | - |
| Architect Certificate for Pending Work Completion Schedule.File: ARCH PENDING WORK CERTIFICATE.pdf | - |
| Engineer Certificate for Pending Work Completion Schedule.File: ENG PENDING WORK CERTIFICATE.pdf | - |
| CA Certificate for Funds required for Project CompletionFile: CA FUND REQUIRED CERTIFICATE.pdf | - |
| AffidavitFile: FORM B AFFIDAVIT.pdf | - |
| Latest Encumbrance CertificateFile: EC FULL.pdf | - |
| Consent letter from 2/3rd of AllotteesFile: NOC FROM ALLOTTEES.pdf | - |
| Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx | - |
| Document 1File: Allottees NOC.pdf | - |
| Document 2File: KANNADA AFFIDAVIT.pdf | - |
| Document 3File: HDMC Acknowledgement.pdf | - |
| Document 4File: Bank Statement.pdf | - |
| construction permission | - |
| APPROVED PLAN | - |
| Property CTS Map | - |
| SALE DEED- ARIHANT | - |
| AGREEMENT FOR SALE SAMPLE | - |
| Sale Deed | - |
| WEST SIDE | - |
| APPROVED PLAN | - |
| Allotment Letter SAMPLE | - |
| brochure | - |
| Project Specifications | - |
| EC FULL | - |
| KATHA | - |
| jda | - |
| conversion order | - |
| APPROVED PLAN | - |
| WEST SIDE | - |
| Property Card | - |
| Balance Sheet 2016 - 2017File: Balance Sheet 2015-16.pdf | - |
| Balance Sheet 2015 - 2016File: BALANCE SHEET 2014-15.pdf | - |
| Balance Sheet 2014 - 2015File: Balance Sheet 2013-14.pdf | - |
| Audited Profit and Loss Statement 2016 - 2017File: P&L 2015-16.pdf | - |
| Audited Profit and Loss Statement 2015 - 2016File: P&L 2014-15.jpg | - |
| Audited Profit and Loss Statement 2014 - 2015File: P&L 2013-14.pdf | - |
| Director's Report 2016 - 2017File: Director Report 2015-16.pdf | - |
| Director's Report 2015 - 2016File: Director Report 2014-15.pdf | - |
| Director's Report 2014 - 2015File: Director Report 2013-14.pdf | - |
| Cash Flow Statement 2016 - 2017File: CASH FLOW 2016.jpg | - |
| Cash Flow Statement 2015 - 2016File: CASH FLOW 2015.jpg | - |
| Auditor's Report 2016 - 2017File: Audit Report 2015-16.pdf | - |
| Auditor's Report 2015 - 2016File: Audit Report 2014-15.pdf | - |
| Auditor's Report 2014 - 2015File: Audit Report 2013-14.pdf | - |
| Income Tax Return Acknowledgement 2016 - 2017File: ITR 2015-16.pdf | - |
| Income Tax Return Acknowledgement 2015 - 2016File: ITR 2014-15.pdf | - |
| Income Tax Return Acknowledgement 2014 - 2015File: ITR 2013-14.pdf | - |
| Form B scanned | - |
| Prospectus/BrochureFile: brochure.pdf | - |
| Advertisement Copy 1File: brochure.pdf | - |
| Tower Excel SheetFile: PRM_KA_RERA_1259_410_PR_180208_002242 (1).xlsx | - |
| Occupancy CertificateFile: CC (1).pdf | - |
| Completion certificate issued by the competent authorityFile: CC (1).pdf | - |
| Registered Agreement of SaleFile: 306 sale AGREEMENT_compressed_compressed.pdf | - |
| Registered conveyance deed for an individual unitFile: 204 sale deed_compressed.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Dharwad
Computed across the 250+ Dharwad projects on ReraGenie, from their own filings.
Keep ARIHANT ATRIA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dharwad250+ in Dharwad
Filed coordinates, straight-line distance. 28 registered projects within 2 km.
construction of 1248 houses at Hubli
Commissioner
Akshay Town Tarihal Sector A
Suresh Enterprises Pvt.Ltd
ONE HUBLI PHASE-1
SHETTY-PATIL DEVELOPERS LLP
construction of 784 houses at Hubli
Commissioner
M/s. PRIDE IKON
M/s. PRIDE GROUP
Pourakarmikas Gruha Bhagya Yojane
Hubli Dharwad Municipal Corporation
See every Dharwad project, with the district possession charts
Builder: ARIHANT INFRAREALTY PRIVATE LIMITED
ARIHANT INFRAREALTY PRIVATE LIMITED has 1 registration on RERA Karnataka, including ARIHANT ATRIA. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dharwad district page.
Frequently asked questions
What are my rights if ARIHANT ATRIA is delayed beyond 31 Mar 2020?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of ARIHANT ATRIA?
The registered promoter entity is ARIHANT INFRAREALTY PRIVATE LIMITED, a company as per the filing. Its CIN U45205KA2011PTC061575 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in ARIHANT ATRIA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at ARIHANT ATRIA?
The professionals named in the filing: Architect: AR PRASHANT PADMAKAR KAPDI; Engineer: DR A B KULKARNI & ASSOCIATES. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ARIHANT ATRIA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback