Home / Browse projects / Dharwad, Karnataka / ARIHANT ATRIA

Registration approved Mixed Development project

ARIHANT ATRIA

By ARIHANT INFRAREALTY PRIVATE LIMITED

RG-KA-54518 · RERA PRM/KA/RERA/1259/410/PR/180208/002242

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 12 months
  • 2 extensions taken

Clear

  • No complaints on record
  • Separate project account declared
Mar 2020Possession promisedmoved 12 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 58 documents Report an error

ARIHANT ATRIA is a Mixed Development project by ARIHANT INFRAREALTY PRIVATE LIMITED in Dharwad, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1259/410/PR/180208/002242 on 8 Feb 2018. Possession is promised by 31 Mar 2020. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameARIHANT ATRIA
  • TypeMixed Development
  • Location
    • Dharwad
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1259/410/PR/180208/002242
  • ReraGenie IDRG-KA-54518

Builder

  • NameARIHANT INFRAREALTY PRIVATE LIMITED
  • Entity typeCompany
  • CINU45205KA2011PTC061575
  • Authorized SignatoryVARDHAMAN ADAGONDA PATIL
  • DirectorsUTTAM RAOSAHEB PATIL, RAJKUMAR SHRIKANT KHAWATE, DILIPKUMAR BHAU PATIL, ABHINANDAN RAOSAHEB PATIL, MAHAVEER TAMMANNA DASHARATH DANOLLI

Key dates

this monthRegisteredFeb 2018First promiseMar 2019Revised toMar 2020

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on8 Feb 2018
  • Promised completion31 Mar 2020
  • Revised completionRevised to 31 Mar 2020 (originally 31 Mar 2019)
  • Buildings1 building record
  • Documents filed58 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Arihant Atria-----91

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)Not applicable
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,441 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 18.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR PRASHANT PADMAKAR KAPDI
EngineerDR A B KULKARNI & ASSOCIATES

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionMar 2019 → Dec 2020

No reason recorded in the filing

EX/PRM/KA/RERA/1259/410/PR/191102/002242Dec 2020 → Mar 2020

Reason as filed by the promoterShortage of Labour

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed58

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1259/410/PR/180208/002242 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: ROC.jpg-
Architect Certificate for Work Completion Schedule till DateFile: ARCH WORK COMPLETED CERTIFICATE.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: ENG WORK COMPLETION CERTIFICATE.pdf-
CA Certificate for Funds UtilizationFile: CA FUND UTILISATION CERTIFICATE.pdf-
Architect Certificate for Pending Work Completion Schedule.File: ARCH PENDING WORK CERTIFICATE.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: ENG PENDING WORK CERTIFICATE.pdf-
CA Certificate for Funds required for Project CompletionFile: CA FUND REQUIRED CERTIFICATE.pdf-
AffidavitFile: FORM B AFFIDAVIT.pdf-
Latest Encumbrance CertificateFile: EC FULL.pdf-
Consent letter from 2/3rd of AllotteesFile: NOC FROM ALLOTTEES.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
Document 1File: Allottees NOC.pdf-
Document 2File: KANNADA AFFIDAVIT.pdf-
Document 3File: HDMC Acknowledgement.pdf-
Document 4File: Bank Statement.pdf-
construction permission-
APPROVED PLAN-
Property CTS Map-
SALE DEED- ARIHANT-
AGREEMENT FOR SALE SAMPLE-
Sale Deed-
WEST SIDE-
APPROVED PLAN-
Allotment Letter SAMPLE-
brochure-
Project Specifications-
EC FULL-
KATHA-
jda-
conversion order-
APPROVED PLAN-
WEST SIDE-
Property Card-
Balance Sheet 2016 - 2017File: Balance Sheet 2015-16.pdf-
Balance Sheet 2015 - 2016File: BALANCE SHEET 2014-15.pdf-
Balance Sheet 2014 - 2015File: Balance Sheet 2013-14.pdf-
Audited Profit and Loss Statement 2016 - 2017File: P&L 2015-16.pdf-
Audited Profit and Loss Statement 2015 - 2016File: P&L 2014-15.jpg-
Audited Profit and Loss Statement 2014 - 2015File: P&L 2013-14.pdf-
Director's Report 2016 - 2017File: Director Report 2015-16.pdf-
Director's Report 2015 - 2016File: Director Report 2014-15.pdf-
Director's Report 2014 - 2015File: Director Report 2013-14.pdf-
Cash Flow Statement 2016 - 2017File: CASH FLOW 2016.jpg-
Cash Flow Statement 2015 - 2016File: CASH FLOW 2015.jpg-
Auditor's Report 2016 - 2017File: Audit Report 2015-16.pdf-
Auditor's Report 2015 - 2016File: Audit Report 2014-15.pdf-
Auditor's Report 2014 - 2015File: Audit Report 2013-14.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: ITR 2015-16.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITR 2014-15.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: ITR 2013-14.pdf-
Form B scanned-
Prospectus/BrochureFile: brochure.pdf-
Advertisement Copy 1File: brochure.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1259_410_PR_180208_002242 (1).xlsx-
Occupancy CertificateFile: CC (1).pdf-
Completion certificate issued by the competent authorityFile: CC (1).pdf-
Registered Agreement of SaleFile: 306 sale AGREEMENT_compressed_compressed.pdf-
Registered conveyance deed for an individual unitFile: 204 sale deed_compressed.pdf-

How this compares with Dharwad

29%of Dharwad projects moved their completion datethis one moved by 12 months
0%of Dharwad registrations are shown as withdrawn or revokedthis one is not

Computed across the 250+ Dharwad projects on ReraGenie, from their own filings.

Keep ARIHANT ATRIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dharwad250+ in Dharwad

2 kmARIHANT ATRIAOther 28Dot size: filed unitsN

Filed coordinates, straight-line distance. 28 registered projects within 2 km.

Builder: ARIHANT INFRAREALTY PRIVATE LIMITED

ARIHANT INFRAREALTY PRIVATE LIMITED has 1 registration on RERA Karnataka, including ARIHANT ATRIA. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dharwad district page.

Frequently asked questions

What are my rights if ARIHANT ATRIA is delayed beyond 31 Mar 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of ARIHANT ATRIA?

The registered promoter entity is ARIHANT INFRAREALTY PRIVATE LIMITED, a company as per the filing. Its CIN U45205KA2011PTC061575 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in ARIHANT ATRIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at ARIHANT ATRIA?

The professionals named in the filing: Architect: AR PRASHANT PADMAKAR KAPDI; Engineer: DR A B KULKARNI & ASSOCIATES. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ARIHANT ATRIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARIHANT ATRIA. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARIHANT ATRIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.