Valid until 8 Dec 2026 Residential/Group Housing project

ANTLIA DREAM

By Ravani Realters

RG-GJ-14294 · RERA PR/GJ/SURAT/SURAT CITY/SUDA/RAA00411/A1R/EX4/030226/081226 · Last updated on GujRERA portal: 19 Jan 2026

Source: official GujRERA filing

Red flags

  • Completion date moved by 48 months
  • 4 extensions taken

Clear

  • Nothing verified clear yet
Dec 2026Possession promisedmoved 48 months from the original
50 of 63Construction stages doneacross 7 buildings; furthest along: External plumbing and external plaster, 70%
17 of 182Units unsoldnot recorded sold or booked
Jump to the 44 documents Report an error

ANTLIA DREAM is a Residential/Group Housing project by Ravani Realters in Surat, Gujarat, registered with GujRERA as PR/GJ/SURAT/SURAT CITY/SUDA/RAA00411/A1R/EX4/030226/081226 on 11 Oct 2017. Possession is promised by 8 Dec 2026. The completion date has moved by 48 months from the original filing. 165 of the 182 units on this registration are recorded sold or booked, and 50 of 63 construction stages are filed complete.

At a glance

Project

  • NameANTLIA DREAM
  • TypeResidential/Group Housing
  • Location
    • "ANTLIA DREAM"
    • Canal road
    • Vesu
    • Vesu
    • Surat City
    • Surat
    • 395007
  • Pincode395007
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/SURAT/SURAT CITY/SUDA/RAA00411/A1R/EX4/030226/081226
  • ReraGenie IDRG-GJ-14294

Builder

  • NameRavani Realters
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredOct 2017First promiseDec 2022Revised toDec 2026

Key facts

Registration and timeline

  • StatusValid until 8 Dec 2026
  • Registered on11 Oct 2017
  • Promised completion8 Dec 2026
  • Revised completionRevised to 8 Dec 2026 (originally 8 Dec 2022)
  • Buildings7 building records
  • Documents filed44 files

Current status

91%165 of 182 units booked
83.6%Of the estimated cost spent so far

Figures as on 19 Jan 2026, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
D---26026
E---26026
F---26026
G---26026
A---26026
B---26026
C---26026

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building7

As on 19 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

50 of 63 construction stages are filed complete across 7 buildings. The stage furthest along is External plumbing and external plaster, at 70%.

D51%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats50%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing10%
E82%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing70%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing70%
F89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
G89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
B89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
C89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 19 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)NoNot applicable
Storm water drainsYes100%
Landscaping and tree plantingYes70%
Street lightingNoNot applicable
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes70%
Electrical meter room, sub-station, receiving stationYes80%
Fire fightingNoNot applicable
Drinking water facilitiesYes60%
Emergency evacuationYes70%
Use of renewable energyNoNot applicable
SecurityYes80%
Letter boxYes0%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area13,360 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 112.84 cr
Cost incurredRs 94.30 cr
Spent of the estimate83.57%
BuildingWingEstimatedIncurred
GNARs 19.08 crRs 17.85 cr
ENARs 16.96 crRs 10.97 cr
FNARs 16.96 crRs 13.20 cr
ANARs 16.57 crRs 16.30 cr
BNARs 14.83 crRs 14.75 cr
CNARs 14.22 crRs 12.33 cr
DNARs 14.22 crRs 8.90 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSanjay Josshi
EngineerUMESH JOSHI

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/SURAT/SURAT CITY/SUDA/RAA00411/A1R/EX1/151022Applied Jul 2022; approved Oct 2022
PR/GJ/SURAT/SURAT CITY/SUDA/RAA00411/A1R/EX2/060724/081224Applied May 2024; approved Jul 2024
PR/GJ/SURAT/SURAT CITY/SUDA/RAA00411/A1R/EX3/170325/081225Applied Dec 2024; approved Mar 2025
PR/GJ/SURAT/SURAT CITY/SUDA/RAA00411/A1R/EX4/030226/081226Applied Dec 2025; approved Feb 2026

Documents filed44

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/SURAT/SURAT CITY/SUDA/RAA00411/A1R/EX4/030226/081226 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)19 Jan 2026
Engineer's certificate (Form 2)19 Jan 2026
Engineer's certificate annexure19 Jan 2026
Accountant's certificate (Form 3)19 Jan 2026
Site photograph, D13 Jan 2026
Site photograph, E13 Jan 2026
Site photograph, F13 Jan 2026
Site photograph, G13 Jan 2026
Site photograph, A13 Jan 2026
Site photograph, B13 Jan 2026
Site photograph, C13 Jan 2026
RERA registration certificate11 Oct 2017
Extension certificate-
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Surat

91%of this project is bookeddistrict median 39%
15%of Surat projects moved their completion datethis one moved by 48 months

Computed across the 2,600+ Surat projects on ReraGenie, from their own filings.

Keep ANTLIA DREAM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Vesu2,600+ in Surat

2 kmANTLIA DREAMOther 213Dot size: filed unitsN

Filed coordinates, straight-line distance. 213 registered projects within 2 km.

Builder: Ravani Realters

Ravani Realters has 1 registration on GujRERA, including ANTLIA DREAM. Read the full track record. See more projects on the Surat district page.

Frequently asked questions

What are my rights if ANTLIA DREAM is delayed beyond 8 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of ANTLIA DREAM?

The registered promoter entity is Ravani Realters, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in ANTLIA DREAM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at ANTLIA DREAM?

The professionals named in the filing: Architect: Sanjay Josshi; Engineer: UMESH JOSHI. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ANTLIA DREAM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANTLIA DREAM. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANTLIA DREAM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.