ANANTA SANSKAR

By SANSKAR HOMES

RG-GJ-53758 · RERA PR/GJ/VADODARA/VAGHODIA/Others/RAA03298/EX1/030320 · Last updated on GujRERA portal: 31 Aug 2023

Source: official GujRERA filing

Red flags

  • Completion date moved by 22 months
  • 2 extensions taken

Clear

  • Separate project account declared
Oct 2021Possession promisedmoved 22 months from the original
15 of 56Construction stages doneacross 7 buildings; furthest along: Plinth, 98%
71 of 231Units unsoldnot recorded sold or booked
Jump to the 43 documents Report an error

ANANTA SANSKAR is a Residential/Group Housing project by SANSKAR HOMES in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VAGHODIA/Others/RAA03298/EX1/030320 on 30 Jul 2018. Possession is promised by 30 Oct 2021. The completion date has moved by 22 months from the original filing. 160 of the 231 units on this registration are recorded sold or booked, and 15 of 56 construction stages are filed complete.

At a glance

Project

  • NameANANTA SANSKAR
  • TypeResidential/Group Housing
  • Location
    • C/O ANANTA SANSKAR OPP PODAR INTERNATIONAL SCHOOL
    • JESANGPURA AJWA ROAD
    • Jesangpura
    • Vaghodia
    • Vadodara
    • 390019
  • Pincode390019
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VAGHODIA/Others/RAA03298/EX1/030320
  • ReraGenie IDRG-GJ-53758

Builder

  • NameSANSKAR HOMES
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredJul 2018First promiseDec 2019Revised toOct 2021

Key facts

Registration and timeline

  • StatusValid until 30 Oct 2021
  • Registered on30 Jul 2018
  • Promised completion30 Oct 2021
  • Revised completionRevised to 30 Oct 2021 (originally 30 Dec 2019)
  • Buildings7 building records
  • Documents filed43 files

Current status

69%160 of 231 units booked
59.0%Of the estimated cost spent so far

Figures as on 31 Aug 2023, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TYPE A---21021
TYPE B---50050
TYPE C---42042
TYPE D---56056
TYPE E---18018
TYPE F---18018
TYPE G---26026

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building7

As on 31 Aug 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 56 construction stages are filed complete across 7 buildings. The stage furthest along is Plinth, at 98%.

TYPE A56%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure95%
Internal walls, internal plaster, floorings, doors and windows within flats70%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing80%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
TYPE B57%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth98%
Stilt FloorNot applicable
Slabs of Super Structure90%
Internal walls, internal plaster, floorings, doors and windows within flats60%
Sanitary fittings within the flats25%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing84%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
TYPE C46%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth95%
Stilt FloorNot applicable
Slabs of Super Structure70%
Internal walls, internal plaster, floorings, doors and windows within flats55%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing50%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
TYPE D49%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure93%
Internal walls, internal plaster, floorings, doors and windows within flats50%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing50%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
TYPE E55%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats70%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing70%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
TYPE F62%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats95%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
TYPE G45%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure90%
Internal walls, internal plaster, floorings, doors and windows within flats31%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing37%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%

Progress on shared amenities19

As on 31 Aug 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes40%
Water supplyYes70%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes0%
Landscaping and tree plantingYes0%
Street lightingYes0%
Community buildingsYes0%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area41,292 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 18.52 cr
Cost incurredRs 10.92 cr
Spent of the estimate58.96%
BuildingWingEstimatedIncurred
TYPE ANARs 2.65 crRs 1.56 cr
TYPE BNARs 2.65 crRs 1.56 cr
TYPE CNARs 2.65 crRs 1.56 cr
TYPE DNARs 2.65 crRs 1.56 cr
TYPE ENARs 2.65 crRs 1.56 cr
TYPE FNARs 2.65 crRs 1.56 cr
TYPE GNARs 2.65 crRs 1.56 cr

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/VADODARA/VAGHODIA/Others/RAA03298/EX1/030320Applied Feb 2020; approved Mar 2020
ExtensionApplied Aug 2023; no approval date filed

Documents filed43

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VAGHODIA/Others/RAA03298/EX1/030320 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)31 Aug 2023
Architect's certificate (Form 1)30 Jun 2021
Site photograph, TYPE A30 Jun 2021
Site photograph, TYPE B30 Jun 2021
Site photograph, TYPE C30 Jun 2021
Site photograph, TYPE D30 Jun 2021
Site photograph, TYPE E30 Jun 2021
Site photograph, TYPE F30 Jun 2021
Site photograph, TYPE G30 Jun 2021
RERA registration certificate30 Jul 2018
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-
Engineer's certificate (Form 2)-
Engineer's certificate annexure-

How this compares with Vadodara

69%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one moved by 22 months

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep ANANTA SANSKAR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Jesangpura2,900+ in Vadodara

2 kmANANTA SANSKAROther 23Dot size: filed unitsN

Filed coordinates, straight-line distance. 23 registered projects within 2 km.

Builder: SANSKAR HOMES

SANSKAR HOMES has 1 registration on GujRERA, including ANANTA SANSKAR. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if ANANTA SANSKAR is delayed beyond 30 Oct 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of ANANTA SANSKAR?

The registered promoter entity is SANSKAR HOMES, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in ANANTA SANSKAR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in ANANTA SANSKAR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANANTA SANSKAR. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANANTA SANSKAR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.